eur pbn tf n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
EUR PBN TF PowerPoint Presentation
Download Presentation
EUR PBN TF

Loading in 2 Seconds...

play fullscreen
1 / 15

EUR PBN TF - PowerPoint PPT Presentation


  • 176 Views
  • Uploaded on

EUR PBN TF. PBN ICAO HQ Activities O verview. PBN - Where are we now?. Current PBN concept Globally harmonized navigation specification based on existing national or regional requirement

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'EUR PBN TF' - sagira


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
eur pbn tf

EUR PBN TF

PBN ICAO HQ Activities Overview

pbn where are we now
PBN - Where are we now?
  • Current PBN concept
    • Globally harmonized navigation specification based on existing national or regional requirement
    • Objective: facilitation of standardization with the aim to reduce cost, confusion and accelerate implementation
pbn where are we now1
PBN - Where are we now?
  • Updated PBN Manual (Advance copy):
    • 1st week of July 2012

New Edition

  • PBN concept developments
    • Builds on existing requirements
    • Adds new specifications to address operational requirements
    • Curtails the proliferation of number of navigation specifications
pbn where are we now2
PBN - Where are we now?
  • Updated PBN Manual - highlights
      • RNP 2
        • High continuity (typically oceanic/remote applications)
        • Low continuity (typically continental applications)
      • RNP 0.3
        • Intended for slow moving aircraft
      • Radius-to-fix (RF) (terminal and approach)
      • Fixed Radius Transitions (FRT) (en-route)
      • Advanced RNP (umbrella navigation specification)
      • High level ops approval guidance
      • Improved implementation process description
advanced rnp
Advanced RNP

A-RNP + options

A-RNP

Continental en-route: RNP 2,1

Final approach: RNP 0.3

RF legs

Parallel offset

RNAV holding

RNP APCH

RNAV 10

RNAV 5

RNAV 1

RNP 1

RNAV 2

RNP 4

just published
Just Published

Flight Validation

atm airspace p lanning and design s upport
ATM / Airspace Planning and Design Support
  • Continuous Climb Operations (CCO) Manual
    • Advance copy by July 2012
  • PBN Airspace Concepts Manual
    • Advance copy by July 2012
  • ilearn information/workshop package on PBN airspace design
    • August 2012
flight operations s upport
Flight Operations Support
  • PBN Operations Approval Manual
    • Under review by PBN Operations Approval Tiger Team
    • Advance copy by September 2012
  • ilearn information/workshop package on PBN Operations Approval
    • September 2012
pbn general
PBN General
  • PBN Manual next edition
    • Advance copy July 2012
  • ilearninformation/workshop package on PBN overview
    • September 2012
  • Online PBN implementation status tool
    • September 2012
pbn general1
PBN General
  • PBN Implementation toolkit addressing:
    • Executives
    • Regulators
    • ANSPs
    • Aircraft operators
    • Manufacturers
      • September 2012
pbn general2
PBN General

Instrument Flight Procedures (a summary)

  • Criteria to support new edition of PBN Manual
  • Improved Baro-VNAV criteria
  • Helicopter criteria
  • Sample charts
    • State Letter after IFPP/11

(December 2012)

pbn general planning
PBN General (Planning)

Planning

  • ilearninformation/workshop/training package on PBN for other domains
    • ATC
    • Pilots
    • Flight validation
  • Endorsement programme for service providers
pbn general planning1
PBN General (Planning)

Planning

  • Collision Risk Model for PBN obstacle clearance and air-to-air separation
    • Combined effort IFPP and SASP
  • PBN Procedure Design Safety Assessment Manual
  • Advanced RNP support document
slide15

Objectives

      • New PBN documentation information
      • Status of global implementation
      • Identify implementation issues and problems
      • Development of a global action plan to support implementation
      • Plan to be presented to ANC/12
  • Register at www.icao.int/meetings/pbn-symposium