1 / 1

Sustainable Water Supply Project: Infrastructure Components for Enhanced Delivery in Dhaka Region

This major water supply project in Dhaka involves intake channel, intake pumping station, raw water pipeline to water treatment plant, treated water pipes to Dhaka, and power supplies including transformers and standby power. The project also includes a wide corridor along the Dhaka-Sylhet Road for enhanced water distribution.

ryan-gibson
Download Presentation

Sustainable Water Supply Project: Infrastructure Components for Enhanced Delivery in Dhaka Region

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Water Supply • Major project components • Intake channel (2000 MLD) • Intake PS (2000 MLD) • Intake pumps Ph-1: 525 MLD • Raw water pipeline to WTP Ph-1: (525 MLD) • Treated water pipes to Dhaka (500 MLD) • 33kV power supplies (Phase 1) • Stand-by power (Phase 1) • Transformers (Phase 1) • 31m wide corridor Intake ~ Dhaka Sylhet Road (Both for Saidabad & GWTP)

More Related