1 / 13

IMK-IFU

IMK-IFU. WRI. ISSER. UHOH. IFPRI. White Volta Basin Sub-Project. Use cases:. In consultation with Ministry of Food and Agriculture and the Water Resources Commission, Modeling Workshop in Jan. 2006, Evaluating third cropping season strategy,

Download Presentation

IMK-IFU

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IMK-IFU WRI ISSER UHOH IFPRI

  2. White Volta Basin Sub-Project

  3. Use cases: • In consultation with Ministry of Food and Agriculture and the Water Resources Commission, • Modeling Workshop in Jan. 2006, • Evaluating third cropping season strategy, • Evaluating the impact of Credit Market Reforms,

  4. Modeling: • MAS:Optimization component: • New household survey not enough for input-output estimation, • Started with old Matrix, • Representing the third cropping season (maize) a challenge: • New proposal and no household level data, • MoFA did experiments but no recorded data, • Alternative CropWat, FAO report and data from case farmers visited during different survey times.

  5. 2. Hydrologic component:

  6. 2. Hydrological model: -WaSiM-ETH Model for Atankwidi subcatchment, - 12 months modeling period (01.01.2004 to 31.12.2004), - validation done by one year runoff data “Kandiga Junction”, • simulation run with a spatial resolution of 100m and a daily temporal resolution, • the simulation included fictive reservoir and a fictive irrigation field,

  7. Spatial Representation of Models

  8. 1 V o l t a _ e p p + l i n . s h p - The major challenge we have now is synchronizing the geo-references of the socio-economic surveys and the hydrological data. It looks there scaling problem between the two.

More Related