Design and Layout WG 20-2-2014: https://indico.cern.ch/event/299647/. QA/QC for the detector construction . Julien GIRAUD, Ralf HERTENBERGER, Paolo IENGO, Francesco LACAVA, Sotiris VLACHOS. MANDATE:
E N D
Design and Layout WG 20-2-2014: https://indico.cern.ch/event/299647/
QA/QC for the detector construction. Julien GIRAUD,Ralf HERTENBERGER, Paolo IENGO, Francesco LACAVA,Sotiris VLACHOS MANDATE: Scope : The QA/QC here addressed mainly concern construction but not PCB QA/QC which is taken in charge by a different group. A link between these groups must be established. • Identify all individual components/parts to be labelled, recorded, individually tested and the parameters that should be recorded. • Identify checks needed during construction • Establish methods for the quality follow-up during the construction of the different parts at each construction site. • List the parameters and results of the checks to be recorded. • Establish the manual for the quality at the different phases of the modules construction.
Tasks and working groups for detector construction https://indico.cern.ch/event/299647/contribution/1/material/slides/0.pdf 1 – PCB alignmentmidAprilmid May 2 – PanelconstructionCERN (H.Danielsson), F.Lacava (Roma I), A.Peyaud (Saclay) 3 – Detector assemblymidJune 4 – Thermo-mechanicalsimulationsmidApril 5 – Layout and drawingsmidJune 6 – AluminiumfoamstudiesmidApril 7 – Mesh fixation and deformation midApril 8 – Meshtension / specificationsmid May 9 – Cooling system midApril 10 – Gas system midApril
UlrichLandgraf: Ideasfor detector assembly F.Lacava: Panelconstruction PatrikPonsot: Status on thermo-mechanical simulations and drawings -------> Tonino??? GianlucaIntrozzi: Panel deformation due to gas over pressure & Gravity - Mesh production & Stress test - Pillar structure & Vacuum deformation