1 / 52

Joe Morales Certifications ICC – UBC,IBC,IRC IECC – Plans Examiner, Inspector TDLR – RAS 10 years with City of Houston

Joe Morales Certifications ICC – UBC,IBC,IRC IECC – Plans Examiner, Inspector TDLR – RAS 10 years with City of Houston Plan Examiner. 3 Step process. Site Development Plan Review Construction and Inspections. Water Waste/Water Department. When is Water Waste/Water Approval Required?.

rosetta
Download Presentation

Joe Morales Certifications ICC – UBC,IBC,IRC IECC – Plans Examiner, Inspector TDLR – RAS 10 years with City of Houston

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Joe MoralesCertificationsICC – UBC,IBC,IRCIECC – Plans Examiner, InspectorTDLR – RAS10 years with City of Houston Plan Examiner Construction Code Analysis

  2. 3 Step process • Site Development • Plan Review • Construction and Inspections Construction Code Analysis

  3. Water Waste/Water Department • When is Water Waste/Water Approval Required? Construction Code Analysis

  4. Water Waste/Water Department Projects requiring Water Waste/Water Approvals • All New Construction and/or Additions • All Site Work and Utilities • Change in Occupancy or Change in Use Construction Code Analysis

  5. Water Waste/Water Department • Projects that do not require Water Waste/Water Approval Construction Code Analysis

  6. Water Waste/Water DepartmentProjects that do not require Water Waste/Water Approvals • Driveways • Electronic Locks • Fire Alarms • Remodeling of existing spaces that do not involve a change in occupancy, change in Use, change in size or change in number of occupants Construction Code Analysis

  7. Water Waste/Water Department Also: be aware that to open a vacant restaurant again, new availability letters and payment of impact fees may be required Two reasons for this is that the property owner may have transferred water and sewer capacities to another developer or the restaurant may never have been approved by Public Utilities. Construction Code Analysis

  8. Water Waste/Water Department • Utility Analysis Section • Manages Waste Water flows through WCR (waster water capacity reservations) and manages water demands through water/storm drainage commitment letters Construction Code Analysis

  9. Water Waste/Water Department WCR Long Form – may take from 3 to 4 weeks to process WCR Short From – Can not exceed 6 services units, must front on a 8 inch or larger sanitary sewer line and/or a 6 inch or larger water line. Can be submitted and impact fees paid immediately www.publicworks.cityofhouston.gov/planning/development/index.htm Discharge Criteria Attach copies of the WCR letters and copies of receipts to each set of plans Construction Code Analysis

  10. Planning and Development When is Planning and Development approval required? Construction Code Analysis

  11. Planning and DevelopmentWhen is Planning and Development approval required? • Construction of new buildings • Alterations of existing structures where that alteration results in an increase in; • The gross floor area of a building; or • The intensity of use of a site; or • The seating capacity of a building; and Construction Code Analysis

  12. Planning and DevelopmentWhen is Planning and Development approval required? • The changes of land use, i.e.. Residential to Commercial • New Parking lots and/or expansion of existing parking lots • Shopping Center – Tennant finish, change of use Construction Code Analysis

  13. Planning and Development • Construction projects that do not require Planning and Development approval Construction Code Analysis

  14. Planning and DevelopmentConstruction projects that do not require Planning and Development approval • Interior remodeling that does not change the use of the building, excluding shopping centers • Residential carports that do not encroach into the building setback line, provided the applicant submit verification of setback lines Construction Code Analysis

  15. Planning and DevelopmentConstruction projects that do not require Planning and Development approval • Fences more than 8 feet in height not adjacent to a public street or within a building line and any fences less than 8 feet in height • Swimming pools without above ground improvements, i.e.. Pool houses, shower and locker rooms. Swimming pools located exclusively at a single family residence, including pool houses. Construction Code Analysis

  16. Planning and DevelopmentConstruction projects that do not require Planning and Development approval • Mechanical equipment and storage tanks – both above and below grade • Under ground improvements, such as parking garages, tunnels, basements • Canvas awnings wholly supported from a building wall that comply with building setback lines Construction Code Analysis

  17. Planning and DevelopmentConstruction projects that do not require Planning and Development approval • Façade attached to the exterior of a building, not exceeding 18 inches in thickness. However, the façade may not be permitted where it extends into the setback line • The resurfacing and repairs of parking lots Construction Code Analysis

  18. Planning and DevelopmentConstruction projects that do not require Planning and Development approval • Mechanical equipment on the exterior of a building of a building premise • Driveways and sidewalks Construction Code Analysis

  19. Planning and Development • Generally, Ordinances which effect Planning and Development requirements are; • Chapter 42; Development (Platting) • Chapter 33; Landscaping • Chapter 26; Off Street Parking Construction Code Analysis

  20. Planning and DevelopmentHow to determine if project requires a development plat • In new construction a copy of the recorded plat can be obtained from 611 Walker St. in the Basement level. If the recorded plat reveals that the property has been subdivided since recordation then a replat is necessary. • If the plat is for use other than what is being proposed, a replat would be necessary Construction Code Analysis

  21. Planning and DevelopmentHow to determine if project requires a development plat • If the property is in a Reserve Tract, determine what the Reserve is platted for. If the use does not match the intended use, a Replat is required. • If the property is in an Unrestricted Reserve, development may proceed as long as the Title Report does not have restrictions that would prohibit construction Construction Code Analysis

  22. Planning and DevelopmentHow to determine if project requires a development plat • If the property is part of an Abstract Tract where no platting has been done and there are no restrictions in the Title Report, a plat would not be required. Construction Code Analysis

  23. Planning and DevelopmentProjects that require Planning and Development approval without plat requirements • Development Site Plan Review • Depending on the Project Scope the following may be required in the Development Site Plan Review; • Parking requirements • Landscaping requirements Construction Code Analysis

  24. Planning and DevelopmentProjects the require Planning and Development approval without plat requirements • Applications for Development Site Plan Review can be picked up at 3300 Main St. Construction Code Analysis

  25. Article II Division 1 Sec. 42-22 Development plat required Development of property through the new construction or enlargement of any exterior dimension of any building, structure, or improvement within the City or its ETJ shall require a development plat, except that the following types of development shall be exempt from this requirement: Construction Code Analysis

  26. Article II Division 1 Sec. 42-22 Development plat required - Exceptions • Buildings, structures, or improvements within the central business district; • Alterations to any building or improvement, including enclosing an existing canopy or porte-cochre, that do not increase the exterior square footage by more than 100 square feet and that do not result in an encroachment into the building line requirement; • Construction of a detached single-family residential unit (or enlargement thereto) that meets the requirements of article III of this chapter on a lot that is part of, and in manner that complies with, a recorded subdivision plat or an unrecorded subdivision plat that is recognized as a plat for the purposes of property conveyance; • A parking lot or expansion thereof; • A retaining wall, masonry wall or fence under eight feet high; or • Placement of a temporary classroom building at a public school facility. Construction Code Analysis

  27. Code EnforcementPlan ReviewGoal is 11 Days in the Systemand 2 submittals Total Time is dependant on how long the designer holds the plans for plan corrections. Construction Code Analysis

  28. Making it into the system • City has implemented a Prerequisites Checklist for allowing drawings to be submitted for plan review • Provides for the minimal information required for a complete plan review. • Eliminated reviewing plans that had no chance for approval • Rejections for Prerequisites do not count as a submittal Construction Code Analysis

  29. Pay Attention to Detail • Critical to maximizing chance for approval • Permit application • Read correction comments carefully, if they are not clear call the plan checker to gain more clear understanding • Plan Checkers want information on the plans! • If a comment correction is made to the Architectural Drawings it most probably will effect the MEP drawings, coordinate with the MEP engineers Construction Code Analysis

  30. Prerequisites • Please read all prerequisite requirements • Someone should be responsible for reviewing the completed Plan Set to see if all Prerequisites are met. There are 18 prerequisites that may or may not effect your project. Construction Code Analysis

  31. Code Analysis • Lead the Plan Checker through the plans • Provide a good exiting plan and provide exit width calculations • Exiting plan is good place to show the square footage of all rooms and/or spaces along with the Occupant Load Factors and Occupant Loads as per Table 1004.1.1 (amended) Construction Code Analysis

  32. Code Analysis Occupancy Groups • Determine the Occupancy Group from Chapter 3 • Call Plan Review for Help when in doubt • Occupancy Group is critical in determining code requirements Construction Code Analysis

  33. New Express Rules Designer’s Review by Appointment • The Designer/Architect may schedule a meeting with the Plan Checker to discuss the manner in which the rejection comments have been addressed • By appointment only • Limited to 30 minutes • Plan Designer/Architect must be in attendance • Project must have at least one full review & comments should not be excessive (determined by Plan Checker) Construction Code Analysis

  34. Quick Start I Construction Code Analysis

  35. Quick Start I Construction Code Analysis

  36. Quick Start I Construction Code Analysis

  37. Quick Start I Construction Code Analysis

  38. Quick Start I Construction Code Analysis

  39. Quick Start I Construction Code Analysis

  40. Phased Permitting • UNDERGROUND UTILITIES • PLUMBING: • 1. Complete set of pipes (Storm/Sanitary/Water) • 2. Utility Letters • ELECTRICAL: • 1. Electrical Underground (Conduit) • STRUCTURAL: • 1. Any Structural components (i.e. Light Pole Base) • 2. Paving Plans if applicable • 3. Civil Plans Construction Code Analysis

  41. Phased Permitting • FOUNDATION/SITEWORK • PLUMBING: • 1. Waste & Vent below Foundation • 2. Roof Drainage • 3. Utility Letters • 4. (COPY) of approved piping plan for ref. • 5. Site-Drainage & Detention • 6. Flood Approval if required • ELECTRICAL: • 1. (COPY) of approved Underground Conduit for ref. • STRUCTURAL: • 1. Geotechnical Report • 2. Civil Drawings • 3. Site-Plan (Architectural) • 4. Engineered (Foundation & Detail) Drawings Construction Code Analysis

  42. Phased Permitting • BUILDING PHASE • PLUMBING: • 1. Riser Diagram • 2. Piping Legend • 3. Equipment with plumbing connection (water/gas) • 4. (COPY) of the approved “Foundation” for ref. • 5. Roof drainage calculation • 6. Utility Letters • 7. (COPY) of the approved (Site-Utility) for ref. • ELECTRICAL: • 1. (COPY) of the approved underground (conduit) • STRUCTURAL: • 1. (COPY) of the approved Civil Plans • 2. (COPY) of the approved Site-Plan • 3. Complete Architectural Plans • 4. Complete Structural Package Construction Code Analysis

  43. Partial Permits • Site work only or site work and underground utilities • This permit is for clearing the land of vegetation and roots which involves excavating a foot or more of the surface dirt from the property. This permit may include excavating for and laying of underground utilities such as drainage pipes, water pipes, fire lines, etc. • (a) If this permit is for clearing the land, then only structural approval is required. The cost of this permit will be a flat fee of $30 plus a $5 administrative fee regardless of how much the cost of improvements may be. • (b) If this permit does include underground utilities, it shall have approval from water, sewer, storm, plumbing and structural. The cost of this permit is the same as above in item l(a) Construction Code Analysis

  44. Partial Permits Site work, parking lot & paved areas permit (no foundation) This permit is only for site work and required parking lots, driveways and sidewalks. Required parking lots are associated with the construction of a new building and its' purpose is to provide the required off-street parking for the tenants of the building. This permit is possible, provided all off-street parking and other site work requirements have been met as required for the new building and all departments have approved the paving plans based on the requirements for a new building. If plans are submitted for this permit, plans must be routed to all required departments for approval, e.g., planning, traffic, storm, water, sewer, structural, etc. If this permit is issued, the plans for the building must still be routed to City planning, water and sewer to make sure site, parking lot and/or building configurations or use have not been changed. The fee for this kind of permit is based on 'total area of the parking lot,' 'driveways,' 'side­walks,' etc. Construction Code Analysis

  45. Partial Permits • Site work and foundation permit • This permit type has been traditionally submitted to the City and all plan review personnel are familiar with this kind of permit. • If requested, plans shall be submitted and routed to all required departments/sections for approval; such as planning, traffic, water, sewer, storm, plumbing, electrical and structure. • The fee for this kind of permit is based on 'total area covered by foundation,' 'total area of parking lot,' 'driveways' and 'sidewalks', etc. Construction Code Analysis

  46. Partial Permits • Superstructure • Follows a Site Work and Foundation Permit • to construct the structural frame only. Construction Code Analysis

  47. Partial Permits • Roof and Exterior Walls • Follow up with a Roof and Exterior walls permit after the Superstructure. • Often referred as a Skin Permit Construction Code Analysis

  48. Partial Permit • Drilled piers only permit • This permit has been requested by many applicants and is just to get an early start on construction. This permit does not include full foundation or site work. If requested, plans shall be routed to planning and water waste/water for their approval. • The fee for this permit is based upon total area covered by the foundation slab. Construction Code Analysis

  49. Partial Permit • Shell building only permit • This permit includes site work if not permitted in a previous phase. Again, this kind of permit is also traditional and every plan examiner is familiar with the process. • Shell building permit is usually for occupancy groups B, M, S-l and S-2 unless it is specifically categorized for a specific occupancy. A suitable 'type of construction' is assigned based on type of occupancy. Calculate allowable area, and if area separation walls are required, they shall become part of the shell building. Complete details of area separation walls with their locations shall be submitted along with plans for approval. Construction Code Analysis

  50. Construction and Inspections May take up to one year or more depending on the project size. Construction Code Analysis

More Related