PREVIEW - Sixth Framework Programme PREV ention I nformation and E arly W arning WP4340

PREVIEW - Sixth Framework Programme PREV ention I nformation and E arly W arning WP4340 “Very Short-Range Flash Flood Laboratory” Leader: MeteoFrance Start date of the project: APRIL 1 st 2005 Duration: 45 months

rob
Download Presentation

PREVIEW - Sixth Framework Programme PREV ention I nformation and E arly W arning WP4340

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PREVIEW - Sixth Framework Programme PREVention Information and Early Warning WP4340 “Very Short-Range Flash Flood Laboratory” Leader: MeteoFrance Start date of the project: APRIL 1st 2005 Duration: 45 months Partners: MeteoFrance (F), ARPA Piemonte (I), LTHE Grenoble (F), MeteoSwiss (CH), NOA (GR), NOVELTIS (F) Overall objective: The overall purpose of WP4340 is to improve the very short-range forecast of Mediterranean flash-floods over medium basins, based on the next generation European high-resolution NWP models.

  2. Sub-themes: • Value of the near-future high-resolution NWP precipitation forecasts (MF, ARPAP, MS, NOA, NOV) • Two-way/one-way coupling (LTHE, ARPAP, MF) • Common protocol and framework for hydro-meteorological coupling (MF, LTHE, ARPAP, MS, NOA, NOV) • Verification approaches and inter-comparison facilities (NOV, MF, LTHE, ARPAP, MS, NOA) • End-users (ARPAP, MF, LTHE, MS, NOA, NOV) • Pilot Sites: • Cévennes-Vivarais region (Southeastern France) • Piedmont region (Northern Italy) • Test Cases: • 1-3 December 2003 (CV) • 4 November 2004 (CV) • 5-9 September 2005 (CV) • 4-6 June 2002 (P) • 1-2 September 2002 (P)

  3. Meteorological models involved: • LAMI (Italy, 2.8 km) • aLMo2 (Switzerland, 2.2 km) • MM5 (Greece, 2.5 km) • MesoNH (France, 2.5 km)

  4. Forecast started 5 June 00 UTC, 12h precipitation from 5 June 12 UTC to 6 June 00 UTC First tests with aLMo2over Piedmont aLMo2 Radar aLMo7 Next meeting: 30-31 October 2006 in Torino