1 / 13

Duct numbering for EE-

Duct numbering for EE-. 06.B. 07.B. 06.A. 07.A. 08.B. 08.A. 09.B. 09.A. 10.B. 10.A. 11.B. 11.A. 12.B. 12.A. 13.A. 13.B. 14.A. 14.B. 11/12/2003. Wolfgang Funk - CERN CMS. 1. View towards I.P. for EE+. LV1 4*7.4 (172) LV2 4*6.1 (120) HV 1*15.3 (184) OF 2*4.3X2 (18)

rimona
Download Presentation

Duct numbering for EE-

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Duct numbering for EE- 06.B 07.B 06.A 07.A 08.B 08.A 09.B 09.A 10.B 10.A 11.B 11.A 12.B 12.A 13.A 13.B 14.A 14.B 11/12/2003 Wolfgang Funk - CERN CMS 1

  2. View towards I.P. for EE+ LV1 4*7.4 (172) LV2 4*6.1 (120) HV 1*15.3 (184) OF 2*4.3X2 (18) signal 1*9 (64) View from I.P. for EE- CO 1*14 is (314mm**2) CO 1*14 con (154) N2 1*8 (51) OF 15*4.3X2 (129) HV 4*14 (616) Sniff 1*6 (29) Duct 05.A Sum: (1851) P F B ret N2 sn Duct 06.B Similar to Duct 03.A Note that the EE HV cables are only the indicated size where there is no space problem. The mantle is cut off elsewhere (curves) and saves almost 60% of cross section. LV1 4*7.4 (172) LV2 4*6.1 (120) HV 1*15.3 (184) OF 2*4.3X2 (18) signal 1*9 (64) LV 10*12.2 (1169) CO 1*14 con (154) Signal 2*10 (158) Duct 05.B P ret Sum: (2039) 14/23 Duct 06.A Similar to Duct 03.B 11/12/2003 Wolfgang Funk - CERN CMS 2

  3. LV1 4*7.4 (172) LV2 4*6.1 (120) HV 1*15.3 (184) OF 4*4.3X2 (35) signal 1*9 (64) LV 10*12.2 (1169mm**2) CO 1*14 con (154) Signal 1*10 (79) Duct 04.A Sum: (1977) P F P ret Duct 07.B Similar to Duct 02.A LV1 8*7.4 (344) LV2 8*6.1 (240) HV 2*15.3 (368) signal 2*9 (128) HV 4*14 (616) CO 1*14 is (314) OF 15*4.3X2 (129) Duct 04.B Sum: (2149) P F Duct 07.A Similar to Duct 02.B 11/12/2003 Wolfgang Funk - CERN CMS 3

  4. FES F LV1 4*7.4 (172) LV2 4*6.1 (120) HV 1*15.3 (184) OF 4*4.3X2 (35) signal 1*9 (64) CO 4*10 is (804mm**2) CO 1*14 is (314) CO 1*12 is (255) CO 1*14 con (154) OF 15*4.3X2 (129) HV 2*14 (308) Duct 03.A Sum: (2539) OES OES BF BF BF BF R F Duct 08.B Similar to Duct 05.A LV1 4*7.4 (172) LV2 4*6.1 (120) HV 1*15.3 (184) OF 2*4.3X2 (18) Signal 1*9 (64) LV 10*12.2 (1169) CO 1*14 con (154) Signal 2*10 (158) Duct 03.B Sum: (2039) P F P ret Duct 08.A Similar to Duct 05.B 11/12/2003 Wolfgang Funk - CERN CMS 4

  5. LV1 4*7.4 (172) LV2 4*6.1 (120) HV 1*15.3 (184) OF 2*4.3X2 (18) signal 1*9 (64) LV 10*12.2 (1169mm**2) CO 1*14 con (154) Signal 1*10 (79) DCS 1*11 (95) DCS 1*7.2 (41) DCS 1*5.8 (26) Duct 02.A Sum: (2122) P F P ret Duct 09.B Similar to Duct 04.A LV1 8*7.4 (344) LV2 8*6.1 (240) HV 2*15.3 (368) OF 3*4.3X2 (27) signal 2*9 (128) CO 2*14 is (628) Laser 1*10 (79) OF 15*4.3X2 (129) Co 1*14 (154) MEM 24*2.2 (92) MEM 4*1.5X2 (12) MEM 6*2X10 (120) Duct 02.B Sum: (2321) P F P F ret B ret Duct 09.A Similar to Duct 04.B Note: additional cables between MEM and balconies: Hybrid (5V,2.5V Ving, sensing for all) 2*12 (226), OF 1*4.3X2 (9) MEM cables (MEM 24*2.2 (92), MEM 4*1.5X2 (12) and MEM 6*2X10 (120) )are only between MEM and Dees Sum: (2332) 11/12/2003 Wolfgang Funk - CERN CMS 5

  6. CO 1*71 (3960) Duct 01.A Duct 10.B 11/12/2003 Wolfgang Funk - CERN CMS 6

  7. CO 1*71 (3960) Duct 01.B Duct 10.A 11/12/2003 Wolfgang Funk - CERN CMS 7

  8. LV1 8*7.4 (344) LV2 8*6.1 (240) HV 2*15.3 (368) OF 4*4.3X2 (36) signal 2*9 (128) CO 2*14 is (628) Co 1*14 (154) HV 4*14 (616) OF 15*4.3X2 (129) Duct 18.A Sum: (2643) P F P F B ret ret Duct 11.B Similar to Duct 16.A LV1 4*7.4 (172) LV2 4*6.1 (120) HV 1*15.3 (184) OF 2*4.3X2 (18) signal 1*9 (64) LV 10*12.2 (1169mm**2) CO 1*14 con (154) Signal 1*10 (79) DCS 1*11 (95) DCS 1*7.2 (41) DCS 1*5.8 (26) Duct 18.B Sum: (2122) P F P ret Duct 11.A Similar to Duct 16.B 11/12/2003 Wolfgang Funk - CERN CMS 8

  9. LV1 4*7.4 (172) LV2 4*6.1 (120) HV 1*15.3 (184) OF 2*4.3X2 (18) Signal 1*9 (64) LV 10*12.2 (1169) CO 1*14 con (154) Signal 2*10 (158) Duct 17.A Sum: (2039) P F P ret Duct 12.B Similar to Duct 15.A LV1 4*7.4 (172) LV2 4*6.1 (120) HV 1*15.3 (184) OF 4*4.3X2 (35) signal 1*9 (64) CO 4*10 is (804mm**2) CO 1*14 is (314) CO 1*12 con (113) CO 1*14 con (154) OF 15*4.3X2 (129) HV 2*14 (308) Duct 17.B OES Sum: (2397) OES FES R BF BF BF R BF F Duct 12.A Similar to Duct 15.B 11/12/2003 Wolfgang Funk - CERN CMS 9

  10. HV 4*14 (616) CO 1*14 is (314) OF 15*4.3X2 (129) LV1 8*7.4 (344) LV2 8*6.1 ( 240) HV 2*15.3 (368) signal 2*9 (128) Duct 16.A Sum: (2139) P F Duct 13.B Similar to Duct 18.A LV1 4*7.4 (172) LV2 4*6.1 (120) HV 1*15.3 (184) OF 4*4.3X2 (35) signal 1*9 (64) LV 10*12.2 (1169mm**2) CO 1*14 con (154) Signal 1*10 (79) Duct 16.B Sum: (1977) P F P ret Duct 13.A Similar to Duct 18.B 11/12/2003 Wolfgang Funk - CERN CMS 10

  11. LV1 4*7.4 (172) LV2 4*6.1 (120) OF 2*4.3X2 (18) signal 2*9 (128) LV 10*12.2 (1169) CO 1*14 con (154) Signal 2*10 (158) Duct 15.A P ret Sum: (1919) 14/23 Duct 14.B Similar to Duct 17.A LV1 4*7.4 (172) LV2 4*6.1 (120) HV 1*15.3 (184) OF 1*4.3X2 (18) signal 1*9 (64) HV 6*14 (924) OF 15*4.3X2 (129) Sniff 1*6 (29) CO 1*14 is (314mm**2) CO 1*14 con (154) N2 1*8 (51) N2/sniff 1*12 (113) N2 Duct 15.B Sum: (2272) P F B ret N2 Duct 14.A sn Similar to Duct 17.B Note: ES N2 pipe is input on one Dee and output on other Dee (same diameter) 11/12/2003 Wolfgang Funk - CERN CMS 11

  12. History New version 14/7/03 to avoid crossing of services at EE patch panel area according to Justin’s proposal of patch panel design of spring ’03: • Move ES services out of 10B-/10A- into 9A-/11B- (no space in ducts with ES pipes). • Move PF from 7A- to 9A- and from 13B- to 11B- to avoid crossing of cooling pipe over ring flange bean. • Move half of OF from 6B-/8B-/13B-/11B- to 7A-/9A-/14A-/12A- to have less crossings. • Move half of HV from 7A-/9A-/14A-/12A- to 6B-/8B-/13B-/11B- to have less crossings. • Change of DCS scheme: no DCS cable anymore in 7B-/13A-, but 3 DCS cables in 9B-/11A-, no overall cross section increase. New version 6/8/03 to increase LV cable sets to 20/Quadrant (before 18/Quadrant) because of new “EE-mechatronics’’ design of Tony: • 2 more LV EE cables each in ducts 7B-,9B-,11A-,13A- . New version 11/8/03 to increase space in ducts for ES cooling pipes. • Move EE backplate return pipes from 10B-/10A- into 9A-/11B- . 11/12/2003 12 Wolfgang Funk - CERN CMS

  13. History(2) New version 23/9/03 to adapt latest version of ES services: • Remove one OF from of 9A-. • Remove separate LV cables for controls 14A- (are part of standard LV system) New version 03/12/03 to adapt latest version of EE/ES services: • One ES unit contains now only one signal- (control) cable instead of 2 with exception • of duct 14B-. • One ES LV unit contains now of 4*7.4 and 4*6.1 instead of 6*7.4 • MEM services adopted to new information • EE HV 2*13 mantles/Dee (each has 13/12 coax) replaces single coaxes, changed some • positions to equalize filling factors. 11/12/2003 13 Wolfgang Funk - CERN CMS

More Related