NSP System. NSP Supply Plans: Generation and Transmission. Betsy Engelking Director, Resource Planning Xcel Energy. Key Strategies in Developing Plan. Meet renewables requirements in all states Upgrade and maintain existing units as possible

1 / 18

Download Presentation

NSP System

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript

Playing audio...

  1. NSP System

  2. NSP Supply Plans: Generation and Transmission Betsy Engelking Director, Resource Planning Xcel Energy

  3. Key Strategies in Developing Plan Meet renewables requirements in all states Upgrade and maintain existing units as possible Maintain a diverse portfolio of reasonably priced resources Position company to meet future environmental mandates such as carbon regulation

  4. 2008 Resource Plan Action Plan • Meet all jurisdictional renewable requirements • Focus on increasing owned wind • Increase DSM goal to 1.3% energy savings phased over 3 years • Extend Manitoba Hydro contract • Implement Nuclear and Sherco upgrades • Repower Blackdog as a combined cycle – 600 MW between 2015 and 2017 • Develop contingency plans

  5. Effects of Economic Downturn in Generation Planning • Expected continued sales decline • Changing reserve margins • Reduced need for renewable energy • Cancel 2011 peaking resource • Defer Black Dog conversion from 2013 to 2015 or later • Delay environmental and capacity upgrades at Sherco 1 and 2

  6. Updated Load and Resources Chart 502 278 324 328 252 167 (800) (961) (1,243) (1,320) (1,396) (1,415) (1,422) (1,618) (1,637) (1,909) (1,992) Assumes: Manitoba Hydro expires per current contracts, Black Dog 3&4 retired in 2015, PI life is extended, Monti uprates in 2011, Sherco 3 15 MW increase in 2011 Does not include: PI uprates (164 MW), Sherco 1&2 uprates (69 MW), Black Dog repowering (650 MW), MH extension (375+385 MW)

  7. Renewables Requirements • Requirements in all 5 jurisdictions • MN: 30% by 2020 • WI: 12% by 2015 • ND, SD, MI: 10% by 2015 • We plan compliance on a system-wide basis at the lowest possible cost • Accurate cost allocation to ensure each jurisdiction pays its cost for renewables

  8. Current Status: Renewable Energy • 350 MW of owned wind 2010-2011 • 200 MW Nobles (Minnesota) • 150 MW Merricourt (North Dakota) • Additional local and distributed wind • CBED in Minnesota • Discussion of Feed-in Tariffs • Bayfront Conversion • 20 MW biomass gasifier (Wisconsin) • Uses existing steam generator and turbine

  9. Mitigating Carbon Risk • Current plan, including renewables and nuclear upgrades, reduces carbon 22% below 2005 levels by 2020 • After 2020, expanded needs will cause carbon to increase absent development of low and no-carbon alternatives • Xcel develops plans to meet state voluntary reduction goals, but believes a national solution is the best way to address carbon

  10. Environmental upgrades at Sherco • Unit 3 mercury reduction and capacity upgrades (15-20 MW) complete in 2012 • Delay in CAIR and CAMR rulings allow us to delay upgrades at Units 1 and 2 • Lower cost options for compliance may be commercial soon • Earliest projects will begin is 2014

  11. Other Supply Issues • Grand Meadow Wind Farm on line in December 2008 • Last phase of MERP repowering project, new Riverside CC, will be online June 2009 • Need for flexible, modular plans that allow us to advance or delay resources as the economy dictates

  12. CAPX Transmission • Created by Minnesota Utilities to examine the infrastructure needed to ensure system reliability • Projects also support Wisconsin and the Dakotas • Phase 1 projects recently approved by Minnesota PUC

  13. Phase I CAPX projects • A 240-mile, 345-kilovolt line between Brookings County, S.D., and Hampton, Minn., plus a related 345-kilovolt line between Marshall and Granite Falls, Minn. • A 250-mile, 345-kilovolt line between Fargo, N.D., and Alexandria, St. Cloud and Monticello, Minn. • A 150-mile, 345-kilovolt line between Hampton, Rochester, Minn., and La Crosse, Wis.

  14. Next Steps • Obtain approval in other jurisdictions • Select routes for projects • Next set of projects currently being study • Will address transmission needs to address increased renewables goals after 2016 • Continue to monitor need and cost of transmission expansion

  15. Keeping Costs Low for Customers • Develop flexible plans that allow us to address changing economy • Use bidding and other strategies to obtain resources at lowest possible costs • Work actively with legislators and regulators to shape policies that reduce cost • Utilize existing resources and existing sites to expand generation fleet • Maximize use of transmission

  16. Conclusions • Xcel Energy’s resource needs are changing rapidly • Flexible planning is the key • Keep options open • Plan for modular system additions • Current goals include nuclear plant life extension, Black Dog repowering and Manitoba Hydro extension • We are working to meet all of our needs and requirements at the lowest cost to customers