NASTON ENGINEERING NIGERIA LIMITED

NASTON ENGINEERING NIGERIA LIMITED. WATER TREATMENT ENGINEERS AND CONTRACTORS. HEAD OFFICE: WATER HOUSE, IPONRI 1, Afric Road, Off Funsho Williams Avenue, Beside Leadway Assurance, Iponri , Lagos, Nigeria. NASTON. WHO WE ARE- Introducing Naston.

remy
Download Presentation

NASTON ENGINEERING NIGERIA LIMITED

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NASTON ENGINEERING NIGERIA LIMITED WATER TREATMENT ENGINEERS AND CONTRACTORS HEAD OFFICE: WATER HOUSE, IPONRI 1, Afric Road, Off Funsho Williams Avenue, Beside Leadway Assurance, Iponri, Lagos, Nigeria

  2. NASTON WHO WE ARE- Introducing Naston Naston Engineering Nigeria Ltd. is a leading indigenous engineering and contracting company in the field of water and wastewater treatment systems, sewage treatment, bulk and domestic metering systems, tank fabrication and pumping systems. The company's unique range of different technologies come from her research and development centres, constant liaison with world leaders in engineering and ensures that our clients (which includes private companies, municipalities, governments, and international organizations) receive the most innovative and effective technological solutions. With several years of experience, we are able to draw upon an unsurpassed knowledge of traditional and innovative solutions in order to meet the demands of both industrial and municipal client. We have executed projects for many states and the federal government and have participated in a number of local and internationally funded projects and are conversant with international procurement Procedures.

  3. NASTON Introducing Naston Our mission is to transform lives by providing systems that adhere to international standards. The management and staff of Naston (of more than 60 employees) are committed to ethical business practices and professional conduct. The company led by professional engineers with more than 20 years of combined experience in the field of waste management, industrial waste water management, operation and maintenance management, turnkey projects, process reengineering, health and safety management and cost reduction program.

  4. NASTON WHAT WE DO- Our Products/Services Naston Engineering's services include: • Feasibility studies, • Procurements and Supply of equipment, • Construction of water treatment plant (Fabrication, Installation &Erection), • Geo-physical services and Drilling of boreholes, • Project Management, • Operation and Management of Plants, • Metering (Bulk and Domestic), • Commissioning of Plants and Equipments, • After-sales service maintenance, • Plant monitoring and staff training, • Rehabilitation and upgrading of Waterworks for public and private sectors, • We operate a standard laboratory equipped with modern equipments to carry out water Analyses.

  5. NASTON Our Products We also offer engineering Services in the following areas: • Packaged Water Treatment Plants, utilizing raw water from boreholes or Rivers to produce potable water, • Municipal Water Schemes for Township and Urban centre, • Supply and Installation of Metering devices, including Pre-paid meters, Domestic Meters, Nodal Flow Meters, etc. • Sewage Treatment Plants for small communities as well as more elaborate schemes for larger communities.

  6. NASTON Metering We promote world class metering solution for both Nodal and Domestic metering. These meters are fully Electronic, intelligent thus offering exceptional features such as: • Exceptional Accuracy, • Durability, • Reliability/Sustainability, • Maintenance Free, and • Good Security.

  7. NASTON Metering VISUAL DISPLAY OF REMOTE METER READING FROM ONE OF THE INSTALLED ELECTROMAGNETIC FLOW METER

  8. NASTON SOME OF OUR METERING PROJECTS • Procurement and Installation of Prepayment Water Meters in Gwarinpa II Housing Estate • Client: FCT, Abuja • Financier: World Bank Date of Award: July, 2009, Status: Completed. Value: N60Million The Scope of the Project Includes: • Procurement of 1000units of Fully Electronic Domestic Prepaid Water Meters • Installation of Fully Electronic Domestic Prepaid Water Meters Including Testing and Commissioning

  9. NASTON ON-GOING PROJECTS – OTTA-IKOSI • Construction of Otta-Ikosi 4MGD Regional Water Supply Scheme and pipeline Reticulation. • Client: Lagos State • Financier: Lagos State Date of Award: 17th Dec, 2008, Status: 70% completed Value: N4.37Billion • The Scope of the Project Includes: • Construction of River Intake, • Construction of Head-Works & Ancillaries • - Pumps Ranging from 25Kw to 75Kw • Construction 2 Booster Pumping Stations at Agbowa and Imota,

  10. NASTON ON-GOING PROJECTS – OTTA-IKOSI • Laying of 40km of DI Pipe for Transmission Mains • - Pipes ranging from ∅80mm to ∅500mm of DI Pipe • Laying of over 40km of PVC Pipe for Reticulation in 13 communities • - Pipes ranging from ∅63mm to ∅315mm of PVC Pipe, • Laying of Service Mains • Supply and Installation of Motor Control Panel (MCC) with Soft Starters • Supply and installation of Telemetry SCADA Equipment and other works • Supply and Installation of 16Nos Galvanized Pressed Steel bolted Panel Tanks of different sizes - 8,400m3 Cumulative Capacity.

  11. NASTON ON-GOING PROJECTS – OTTA-IKOSI • Construction of 4MGD Otta-Ikosi Regional Water supply Schemes (Additional works- • Extension To Ikorodu) • Client: Lagos State • Financier: Lagos State Date of Award: 18th April, 2011 Status: ` In progress. • Value: N2.3Billion Newly Awarded • The Scope of the Project Includes: • Construction of booster Station at Isiu, • Supply and Installation of 3Nos 750m3 Galvanized Pressed Steel bolted Panel Tanks on 18m Tower at Isiu and Ikorodu. • Supply and installation of 15km of DI pipes (∅ 400mm & ∅ 500mm) including fittings and accessories.

  12. NASTON ON-GOING PROJECTS - ISHASI • Rehabilitation of 4MGD Ishasi Waterworks • Client: Lagos State • Financier: World Bank Date of Award: 24th Jun, 2011. Status: ` In progress. • Value: N745.9Million Newly Awarded • The Scope of the Project Include: • Refurbishment of Raw water intake station & Floating pontoon • Supply and installation of Raw water Submersible Pumps • Overhauling/Refurbishment of Pumping Station Equipment: Clear water pumps, Compressors, blowers, dosing equipment, MCC Panels etc • Refurbishment of Filtration Systems Including Installation of New Instrument and Control Systems • Refurbishment and Improvement to Control Room and PLC (Programmable Logic Controllers • Replacement of chemical dosing pumps, Mixers and dosing pipelines • Improvement to office, security lightings and small power distribution

  13. NASTON ON-GOING PROJECTS - AIRPORT LAGOS • Construction of Water supply schemes at MurtalaMuhammed International Airport, Ikeja. • Client: FAAN • Financier: Fed. Govt. of Nig. Date of Award: 14th Oct. 2008. Status: 80% Completed • Value: N290Million • The Scope of the Project Include: • Upgrading of the plant from 200m3/day to 400m3/day, • Construction of 3nos ∅250mm Borehole, • Installation of Pump galleries (between 15Hp to 30Hp Pumps), • Supply and Installation of Diesel/Electric Fire Hydrant Pump set • Supply and Installation of Motor Control Panel (MCC) with Soft Starters, • Supply and Installation of Standard Laboratory Equipments, • Etc….

  14. NASTON NASTON COMPLETED PROJECTS • Construction of 4Nos 2Million Gallon Per Day Mini Waterworks • at: • 1. Magodo, 2. Epe-Agric, 3. Ajangbadi and 4. Isheri-Oshun in Lagos State. Client: Lagos State • Financier: Lagos State Date of Award: 21st Apr, 2008 Status: Completed • Value: N 1.9Billion • Completion Period: 6 Months

  15. Construction of 4Nos 2Million Gallon Per Day Mini Waterworks-Details Scope of Works of Each of the 4 Sites: • Drilling of 4Nos Deep Boreholes, • Booster Pumping System Installed, • Aeration/Sedimentation Tank Fabricated and Installed, • Filtration System- 4 pressure filters of ∅3m and 3m height, • Clear Water Tank (1,000m3) Fabricated and Installed, • Elevated Tank (225m3) Fabricated and Installed, • Power Generation System, • Operations Building, • 5km of Distribution Pipeline of different sizes (∅110mm to ∅315mm). • Installation of MCC Control Panel • Etc.

  16. NASTON NASTON COMPLETED PROJECTS Picture not Available • Upgrade of Water Treatment Plant at United State of America Consulate, • Lagos Nigeria. • Client: US Consulate Financier: United State of America Date of Award: 21st Aug. 2009 Status: Completed Value: N38.5Million The Scope of the Project Includes: • Upgrading of the plant from 12m3/hr to 18m3/hr, • Supply and installation of 10hp Submersible pump, • Construction of 18m3/hr Water Treatment Plant Comprising: • Aeration & Sedimentation tank: 4.8mL X 2.5mW X 1.5mH • Supply and Installation 3kw Filter pumps and 4kW Transfer pumps • Supply and Installation Pressure Filters • Supply and Installation 3kW Air blower • Supply and Installation Dosing Equipment • Supply and Installation of Motor Control Panel (MCC) with Soft Starters,

  17. NASTON NASTON COMPLETED PROJECTS • Overhauling/Upgrading of the FCT Water Board’s Pumping Stations. • Client: FCT, Abuja • Financier: Fed. Govt. of Nig. Date of Award: 8th Sept, 2008. Status: Completed • Value: N428.9Million • The Scope of the Project Include: • Pump and Power Upgrade of 11 Stations • Rehabilitation and Complete overhauling of the Electromechanical Equipments of the Booster Pumping Station, • Supply and Installation of Pumps Ranging from 11Kw to 30Kw, • Supply and Installation of Electricity Generating Set, • Installation of Bulk Flow Meter

  18. NASTON NASTON COMPLETED PROJECTS • Rehabilitation of Lower Usuma Dam Water Treatment Plant (Phase 1) • Client: FCT, Abuja • Financier: Fed. Govt. of Nig Date of Award: 8th Sept, 2008, Status: Completed. Value: N245. 8Million • The Scope of the Project Includes: • Replacement of the Emergency De-silting Gate of the Dam at a Depth of 60m, • Rehabilitation of the Phase 1 LUD Water Treatment Plant, • Rehabilitation of The Intake Tower, • Supply and Installation of Electromechanical Equipments (Electric Flow Meters, Compressor, etc. • Supply and Installation of Chlorinator (Pre and Post Chlorinator ; up to 20Kg/h), • And many more..

  19. NASTON NASTON COMPLETED PROJECTS • Construction Works for the Extension and Rehabilitation of Karu/Nyanya Water Distribution Network. • Client: FCT, AbujaFinancier: World Bank • Date of Award: 7th Oct. 2008. • Status: Completed. • Value: N599.9Million • The Scope of the Project Include: • Laying of over 40Km of PVC and Ductile Iron for Transmission and Distribution Pipeline Network

  20. NASTON NASTON COMPLETED PROJECTS • Emergency Rehabilitation of Nsukka • Water Supply System • Client: Enugu State • Financier: World Bank Date of Award: 10th Oct. 2007 Status: Completed Value: N182Million The Scope of the Project Include: • Drilling of ∅350mm Borehole, • Rehabilitation of 4Nos Existing Borehole, • Supply and Installation of Clear Water Pumps • Rehabilitation of Treatment Plant and Installation of Dosing Equipments, • Rehabilitation of Operational Building and Treatment Plant Building, • Laying of 22Km of Distribution Pipeline Network..

  21. NASTON NASTON COMPLETED PROJECTS • Supply of Vertical Driven Pumps for Ajalli-Owa Head works. • Client: Enugu State • Financier: World Bank Date of Award: 10th Oct. 2007 Status: Completed Value: N102.4Million The Scope of the Project Includes: • Procurement of 4Nos Vertical Line Driven Pumps for Raw Water (580m3/hr @178mH) • Procurement of 4Nos Vertical Line Driven Pumps for Clear Water (1070m3/hr @150mH)

  22. NASTON NASTON COMPLETED PROJECTS • Replacement of the Electrical Panels for the New Ajalli-Owa Intake and High lift pumps • Client: Enugu State • Financier: World Bank Date of Award: 3rd July, 2009 Status: Completed • Value: N101.3Million The Scope of the Project Includes: • Supply and Installation of Motor Control Panel (MCC) with Soft Starters for Intake Station, • Supply and Installation of Motor Control Panel (MCC) with Soft Starters for High Lift Station • Supply of Spare Parts.

  23. NASTON NASTON COMPLETED PROJECTS • Rehabilitation of Enugu Metropolis Water Distribution Network. (Lot 1) • Client: Enugu State • Financier: World Bank Date of Award: 23rd Jan. 2009 Status: Completed Value: N136.9Million The Scope of the Project Includes: • Procurement of ∅300mm and ∅450mm Ductile Iron Pipes • Procurement of ∅100mm and ∅200mm UPVC Pipes • Laying of Pipes in a densely Built up Area • Reclaimation of Right of Ways by Relocating Utilities such as Underground Electrical Cables, Telecoms Cable, Transformer etc., • Rehabilitation of Lower Ogui Road Pipe Reticulation of 4km Pipe Line, • Reconnection of New Pipe Network With Supply Mains, Testing, Flushing and Chlorination of New Pipeline,

  24. NASTON NASTON COMPLETED PROJECTS • Rehabilitation of Enugu Metropolis Water Distribution Network. (Lot 2) • Client: Enugu State • Financier: World Bank Date of Award: 23rd Jan. 2009 Status: Completed • Value: N139.3Million The Scope of the Project Includes: • Procurement of ∅300mm and ∅450mm Ductile Iron Pipes • Procurement of ∅100mm and ∅200mm UPVC Pipes • Laying of Pipes in a densely Built up Area • Reclamation of Right of Ways by Relocating Utilities such as Underground Electrical Cables, Telecoms Cable, Transformer etc., • Reconnection of New Pipe Network With Supply Mains, Testing, Flushing and Chlorination of New Pipeline,

  25. NASTON NASTON COMPLETED PROJECTS • Ikoyi Hotel Redevelopment - Borehole/Water Treatment and Sewage Treatment Plant Installation • Client: Ikoyi Hotel Ltd. • Financier: Beta Consurtium Date of Award: 24th Jul. 2007 Status: Completed • Value: N44.9 Million The Scope of the Project Includes: • Drilling of ∅200mm Borehole, • Design, Construction and Installation of 20m3 Water Treatment Plant, • Design, Construction and Installation of Sewage Treatment Plant.

  26. NASTON OTHER ON-GOING PROJECTS - OSE-OWO • Rehabilitation and Upgrade of • Ose-Owo Water Supply Scheme. • Client: Ondo State • Financier: Ondo State Date of Award: 14th Oct. 2010 Status: In progress  • Value: N1.4Billion The Scope of the Project Includes: • De-silting (Dredging) of the fully silted Ose dam reservoir. • Improvement of the treatment and production capacity of the Treatment plant • Improvement on the water supply to the catchments area via – Installation of new Transmission and distribution pipelines (16.7Km 300mm Steel Pipeline of Transmission Main).

  27. NASTON OTHER ON-GOING PROJECTS - OSE-OWO • Rehabilitation and Upgrade of • Ose-Owo Water Supply Scheme. • (continue ) The Scope of the Project Includes: • De-silting (Dredging) of the fully silted Ose dam reservoir. • Improvement of the treatment and production capacity of the Treatment plant • Improvement on the water supply to the catchments area via – Installation of new Transmission and distribution pipelines (16.7Km 300mm Steel Pipeline of Transmission Main).

  28. NASTON OTHER ON-GOING PROJECTS • Rehabilitation and Upgrade of Awara Water Supply Scheme. • Client: Ondo State Financier: Ondo State Date of Award: 14th Oct. 2010 Status: In progress • Value: N988.7Million The Scope of the Project Includes: • Upgrade of the treatment and production capacity of the plant • Salvaging of abandoned pressure filtration accessories and Completion of the abandoned pressure filtration system. • Upgrade of The Water Supply to The Catchment Area via – Installation New Transmission And Distribution (HDPE) Pipelines

  29. NASTON OTHER ON-GOING PROJECTS • Construction of 50M3/hr Augmentation Water Treatment Plant at Ido-Ani. Client: Ondo State • Financier: Ondo State Date of Award: 3rd Dec, 2010 Status: In progress  • Value: N117.5 Million The Scope of the Project Includes: • Expansion of the Water Treatment Capacity of the Plant from 50m3/hr to 150m3/hr. • Refurbishment of the intake and treatment plant buildings. • Construction of new ground tank . • Completion of the abandoned clarifier. • Supply and installation of new 100m3/hr high lift pumps for Ido-Ani.

  30. NASTON OTHER ON-GOING PROJECTS • Construction of Re-designed Intake/ Rehabilitation of Existing intake structure at Oke-Igbo Water Scheme. • Client: Ondo State Financier: Ondo State Date of Award: 24th Dec. 2010 Status: In progress • Value: N42 Million The Scope of the Project Include: • Construction intake weir across Oni river to impound raw water. • Refurbishment of the intake building. • Replacement of the Raw water Intake pipe works . • Installation of New intake pumps .

  31. NASTON OTHER ON-GOING PROJECTS • Rehabilitation of Ife-Odan Water supply scheme. (EU Financed) Client: Osun State • Financier: European Union Date of Award: 9th Mar. 2011. Status: In progress  Value: N48 Million • Rehabilitation of Lower Usuma Dam Embarkment. (Landscaping) • Client: FCT, Abuja • Financier: Fed. Govt. of Nig Date of Award: 30th Nov. 2010 Status: 60% Completed • Value: N19.9Million

  32. NASTON LIST OF OTHER COMPLETED PROJECTS

  33. NASTON LIST OF OTHER COMPLETED PROJECTS

  34. NASTON PROPOSAL STATEMENT We have presented our capability and experience in executing projects of various sizes and complexity in the water industry and we are roaring to do more…

  35. NASTON OUR CONTACT DETAILS  ABUJA OFFICE ADDRESS 3, GOBA STREET, OFF MONROVIA STREET AMINU KANO CRESENT, WUSE II, ABUJA. LAGOS OFFICE ADDRESS WATER HOUSE, IPONRI 1, AFRIC ROAD, OFF FUNSHO WILLIAMS AVENUE, IPONRI LAGOS  AKURE OFFICE ADDRESS 22, IKALE STREET, IJAPO ESTATE AKURE, ONDO STATE. TELEPHONE: +234 1 841 6002, +234 803 303 4927 E-MAIL: info@nastonnigeria.com;