An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Challenges of Managing Municipal Sewerage Waste in Port Moresby City, Papua New Guinea.

  2. Background. • 1884, Declared English Protectorate, Port Moresby developed mainly along the coast with a population of 5,000. • Current population approx 250,000. • 62% have access to reticulated sewerage system. • By 2020, projected population 437,266 • Pressure on the sewerage system • System divided into two geographical catchment areas.

  3. Background cont • Inland catchment ( 70% ) • Coastal Catchment ( 30 % ) • The inland catchement ( Waigani, Morata • & Gerehu operated by open Stabilization pond treatment system. • Coastal catchment ( Idubada, Hanuabada, Konedobu, Town, Koki & Badili discharge outfalls without treatment.

  4. Inland Catchment Area Coastal Catchment

  5. Inland Stabilization Ponds Waigani STP

  6. Inland Ponds

  7. Coastal Area Discharge. Coastal Area Discharge 30% Badili Paga Point Joyce Bay • Sp

  8. Coastal Discharge Environment Papuan Lagoon

  9. Sea Park Pumping Station Seapark Pump Station 600mm Sewer Outfall

  10. Paga Point 3km Outfall • 600mm • 30m depth

  11. Coastal Pumping Stations Davara PS Town PS

  12. Challenges • Manage city's population increase @ 2.7% annually. • Paga point to Kilakila 63,000 in 2020 • Increase in water consumption, as well increase sewerage discharge. • Adopt a proper treatment system for the coastal area. • Govt approved project to upgrade coastal sewerage system. • Control of Industrial Waste, major challenge.

  13. Oxidation Ditch STP Aeration Pond Oxidation Ditches

  14. THANK YOU Em Tasol