1 / 14

Organigram of the CMS hardware group in Karlsruhe

Organigram of the CMS hardware group in Karlsruhe. Group leader: Th. Müller Technical coordinator: P. Blüm . Sensor quality test Frank Hartmann Stefanie Freudenstein (diplom) C. Menge, Th. Punz (students) + N.N. Irradiation Wim de Boer

reina
Download Presentation

Organigram of the CMS hardware group in Karlsruhe

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Organigram of the CMS hardware group in Karlsruhe Group leader: Th. Müller Technical coordinator: P. Blüm Sensor quality test Frank Hartmann Stefanie Freudenstein (diplom) C. Menge, Th. Punz (students) + N.N. Irradiation Wim de Boer Alexander Dierlamm (PhD) Alexander Furgeri (PhD) Bonding & test center Hans Jürgen Simonis Tobias Barvich (techn.) 50% Pia Steck (techn.) NN Module qualification & diagnostic Guido Dirkes (PhD) Stefan Heier (PhD) Manuel Fahrer (PhD) Thomas Weiler (PhD) M. Waldschmitt (diplom) B. Atz (techn.) Integration & long-term test Stefan Heier (PhD) Valery Zhukov Tobias Barvich (techn.) 50% NNs Institut für Experimentelle Kernphysik

  2. 1) Readiness of the testing rooms and storage spaces • Testing & Storage for QTC & IQC: ready! • Bonding & Testing space: ready! • Storage module: • Space assigned -- Cabinets ordered in workshop • Space for pre-prod (~50 modules) ready! • Testing & Storage for petals: • for pre-prod (ready when needed) • for production: available summer-fall (staged)  Assembly & Testing & Storage in new hall! Institut für Experimentelle Kernphysik

  3. Bonding repair LAB 013 Fast test LAB 013 Diagnostic LAB 316 Operations layout at Karlsruhe Logistic center modules for 50 petals ~6000 sensors Integration center Quality test center 1600 modules Hall 245 5 % (present 100%) storage Bonding & test center Visual inspection LAB 010 Integration on petal 5 % Probing LAB 326 Longterm test (Petal) 1 % Irradiation Cyclotron, LAB 325/6 Bonding qualified & operational Test station operational X-check in progress (already done with Ac in ex-line 1) Repair Clean room (~30m2) tender (to be ready Nov 2003) qualified & operational Irradiation restart April (hopefully) Institut für Experimentelle Kernphysik

  4. 2.) Readiness of Readout I (ARC) • Purpose: • reception and testing of hybrids! • hyb tested: 2 • reprod: fine • x-calib: waiting for calib. module • Db integration: yes • LED: Ac LEDsordered for x-calib • software ver: 6.0b • Aachen LED array and high voltage card ordered for full cross calibration with KA (FED-based) readout systems. Institut für Experimentelle Kernphysik

  5. 2.) Readiness of Readout II FASTTEST (FED-based) Purpose: fast testing after bonding modules tested: ~15 modules tested (prototype, expressline 1, expressline 2) reprod: fine X-calib I: see above X-calib II: Officially waiting for calib. module Db integration: Done, … to be commissioned LED: 4LED arrays included Cooling: activecooling with Peltiers possible LED readout at -10°C possible cosmics calibration Institut für Experimentelle Kernphysik

  6. Fasttest II Already moved to final area (bonding lab)! Bonder • ESD • Facemask Institut für Experimentelle Kernphysik

  7. Purpose: diagnostics of faulty modules modules tested: ~5 modules tested (prototype, expressline 1, expressline 2) reprod, X-calib I, X-calib II, Db integration: same state as fasttest (II) LED array: (1050nm and 950nm) Movable LASER:for single strip/pitch scans (1050/650 nm) • possibility to set probe needles, • tests with a 90Sr source • cosmics • high resolution IV • possibility to introduce CV. 2/3.) Readiness of Readout III Diagnose (FED-based) Apr 03, Frank Hartmann Institut für Experimentelle Kernphysik Institut für Experimentelle Kernphysik 1

  8. 2/3.) Readiness of Readout DAQ CMS-System • Purpose:Module testing • development towards petal readout system • modules tested: ~1 module tested • reprod: fine • X-calib: Not yet • Db integration: YES • software ver: Lt_v.82 installed and tested with Db for one 'old' module. Update to v.90 and x-calibration is foreseen • (responsibility of V. Zhukov) This setup will be finally used for the petal assembly! We need another one for the petal longterm testing! Institut für Experimentelle Kernphysik

  9. 4) Readiness of the LT single module set-up! • We have NO dedicated SINGLE LT teststation! • KA LT Plan! Use of the Fastteststation (II) with active cooling! • 1/ day: last bonded module for LT over night • 1/week: last bonded module for LT over weekend • 4.1) General comments on software!Fastteststation soft • 4.2) is the LT single module set-up commissioned? FASTTEST YES • 4.3) number of hour of running for the longest run performed 20h • 4.4) list of missing equipment to enter into production!Ready • 4.5) Are results obtained with ARC and LT in your lab in agreement? • Basically YES, • final x-calibration still to be done! • The final production LT will be done on petal basis. Institut für Experimentelle Kernphysik

  10. Stability: Calibrated with cosmics HITMAP: ~ 20 hours run (7000 events @ 0.1 Hz) Institut für Experimentelle Kernphysik

  11. Karlsruhe Add. Comments on Cross CalibrationARCS <=> Karlsruhe (for all stations!) • Several modules tested in Aachen and Karlsruhe. • Full comparison with TEC Expressline I, already presented in several prior meetings (and partially by analysing Expressline II modules) • Many basic and analysis results already shown in several meetings! • pinhole tests, basic defect analysis • TEC Expressline I & II • single shot test beam • Test of irradiated hybrids --- modules forseen ( active cooling) • Ongoing scratch and high leakage current tests • Starting of bond tests in high magnetic field @4T Aachen Institut für Experimentelle Kernphysik

  12. Add. NEEDS for petal assembly and petal LT • 1 FED • 1 FEC • 7+1 OEC • LV (ordered), HV, LLN cooling plant (ordered) • actual need for prototype petal: • 4 optical hybrids + 1 OEC (already in house, but requested for X5) • Optical cables • Interconnectboard inc. CCUM Institut für Experimentelle Kernphysik

  13. Institut für Experimentelle Kernphysik

  14. New Hall Institut für Experimentelle Kernphysik

More Related