performance based incentive system pbis fy2009 10 results n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Performance Based Incentive System (PBIS) FY2009/10 Results PowerPoint Presentation
Download Presentation
Performance Based Incentive System (PBIS) FY2009/10 Results

Loading in 2 Seconds...

  share
play fullscreen
1 / 12
ramona-golden

Performance Based Incentive System (PBIS) FY2009/10 Results - PowerPoint PPT Presentation

68 Views
Download Presentation
Performance Based Incentive System (PBIS) FY2009/10 Results
An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.

- - - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

  1. Performance Based Incentive System (PBIS)FY2009/10 Results

  2. WCSS Results • WCSS met or exceeded all eight of the PBIS standards for which we have data, 5 at the high performing level and 3 at the minimum level. • Most results increased or remained stable over last year, sustaining significant gains made in past six years: Example- Average star ratings and % in 4 and 5 star facilities.

  3. Although Wake County has demonstrated growth in almost all standards, one of the most significant increases has been in early intervention B-2.

  4. The only significant decrease this year was in Average Star Rating for children with special needs receiving subsidy, a trend not seen in other counties or statewide average.

  5. The only standard that has decreased over time is EI 3-5, although still meeting minimumstandard.

  6. Comparison Results • Generally, WCSS results are consistent with other large counties and state average. • Some standards are large county strengths and some are greater challenges for large counties. • Large counties do have significant influence on the state average. However, in some cases results are consistent with other large counties but not the state average. • Example- Lead Teacher Education high performing standard.

  7. Lead Teacher Education-high performing standard- 7points (target 35%)

  8. Comparison Results (cont.) • Lead Teacher Education is a relative strength in comparison to the state as well as other large counties and has consistently achieved at a higher level for the minimum standard (5 pts). • Wake County started off at a higher percentage than other counties (in FY06/07) and has continued to increase over the past 4 years. • Teacher education may be a strength because Wake county has a more highly education population than other counties.

  9. Lead Teacher Education- minimum standard- 5 points (target 60%)

  10. Additional Information NCPC re-examining PBIS: • May adjust standard target percentages since so many counties have exceeded them. • Have discontinued the existing family support (parent education and literacy) indicators. • Examining all areas to determine if other measures may be more appropriate.

  11. Additional Information (cont.) • Missing PBIS data for teacher compensation remains an issue. Hope to have new workforce data this year. • Very positive three year trend for School Readiness indicators, using Kindergarten Initial Assessment. • Final Activity Report

  12. Questions??