An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LTU and Beam DumpInstallation April 16, 2007

  2. LTU and Beam Dump Installation • LTU Beamline Design • LTU Beamline Overview • LTU BTH West • Section 72 Installation Drawing Example • Quadrupole Support Geometry • Quadrupole Support Modal FEA • Quadrupole Alignment Stage Geometry • LTU Supports Geometry • LTU Installation Sequence • Beam Dump Geometry • Safety

  3. LTU Beamline Overview • 11 Sections (71-82) • 27 meter nominal section length • VAT vacuum valve isolates each section • Two 40l/s ion pumps per section • One vacuum gauge pair per section • One roughing valve/pump out per section

  4. LTU BTH West BTH west to BTH Transition BSY Muon Plug - LTU Start

  5. Section 72 Installation Drawing Example

  6. Quadrupole Support Geometry Beam Z-Axis Mount Plate

  7. Quadrupole Support Modal FEA

  8. Quadrupole Alignment Stage Geometry

  9. LTU Supports Geometry Device Support Component Support Drift Support

  10. Device and Quadrupole Support Installation SUPPORT COLUMN PRE- ALIGNED MOUNT PLATE GROUT BTH FLOOR

  11. LTU Installation Sequence • Core drill support mount hole patterns serially starting at section 71. • Install quadrupole and device mount plates. • Install Component and Drift supports. • Install quadrupole, dipole, and diagnostics supports. • Install Quadrupoles and Dipoles. • Install Diagnostics, collimators, and single beam. • Install vacuum drifts, ion pumps, VAT valves, bellows modules, and vacuum gauges. • Leak check and pump down section by section from 71 through 82.

  12. Beam Dump Geometry SAFETY DUMP BEAM DUMP BEND MAGNETS

  13. Beam Dump Geometry QUARUPOLE MAGNET

  14. Beam Dump Geometry STOPPER DUMP BEND MAGNETS

  15. Beam Dump Geometry SAFETY BEND MAGNETS QUADRUPOLE MAGNETS

  16. Beam Dump Geometry DUMP SHIELDING

  17. Beam Dump Geometry BEND MAGNETS

  18. Beam Dump Geometry PROTECTION COLLIMATOR SAFETY BEND MAGNETS DUMP LINE

  19. Beam Dump Geometry BEAM DUMP OTR PROFILE MONITOR

  20. Safety • Rigging and Installation will be planned, reviewed, and performed according to SLAC Rigging and Safety Procedures.