castro valley creek stormwater quality monitoring l.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Castro Valley Creek Stormwater Quality Monitoring PowerPoint Presentation
Download Presentation
Castro Valley Creek Stormwater Quality Monitoring

Loading in 2 Seconds...

play fullscreen
1 / 24

Castro Valley Creek Stormwater Quality Monitoring - PowerPoint PPT Presentation


  • 89 Views
  • Uploaded on

Castro Valley Creek Stormwater Quality Monitoring. Brake Pad Partnership Meeting June 22, 2005. BPP Technical Studies. Air Deposition Monitoring (SFEI). Representative Sample of Brake Pad Wear Debris (BMC/Link Test Labs). Air Deposition Modeling (AER). Physical & Chemical

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Castro Valley Creek Stormwater Quality Monitoring' - raisie


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
castro valley creek stormwater quality monitoring

Castro Valley Creek Stormwater Quality Monitoring

Brake Pad Partnership Meeting

June 22, 2005

slide2

BPP Technical Studies

Air

Deposition

Monitoring (SFEI)

Representative Sample of Brake Pad

Wear Debris

(BMC/Link Test Labs)

Air

Deposition

Modeling (AER)

Physical & Chemical

Characterization of

Wear Debris (Clemson University)

Copper Source

Loading Estimates

(Process Profiles)

Watershed

Modeling(U.S. EPA)

Water

Quality

Monitoring (ACCWP)

Bay

Modeling (URS)

Final Report

Data Assessment

Conclusions

Steering Committee, Scientific Advisory Team, and

Stakeholder Involvement Process (Sustainable Conservation)

scope of work
Scope of Work
  • Collect runoff samples from Castro Valley Creek during five to ten storm events
  • Analyzes samples for total copper and total suspended solids.
  • Obtain rainfall and stream flow data
background
Background
  • Castro Valley Creek Watershed
    • 5.51 square miles
    • Predominantly low-density residential w/ some commercial development and open space
    • Mean Annual Rainfall: 21 inches
      • Rainy season: October through May
    • Elevation: 200 to 500 feet above sea level
    • Mean Annual Stream Flow: 123 million cu. ft.
    • Stream channels mostly incised or culverted
background cont
BACKGROUND (Cont.)
  • Long history of monitoring watershed
    • USGS stream flow from 1971
    • Hourly rainfall from 1970
    • Extensive Water Quality sampling
      • USGS from 1971 to 1989
      • Flow-weighted composite sampling 1990-95
      • 90 discrete samples from 2002/2003
overview of sampling effort
Overview of Sampling Effort
  • Sampled Nine Storm Events from October 2003 through February 2004
    • Time-weighted: composites of four hourly samples
    • Flow-weighted discrete samples: every 240,000 cubic feet of flow
      • Consistent with previous sampling regime
      • First flush as discrete sample
overview of sampling cont
Overview of Sampling (cont.)
  • Samples collected using an ISCO automated sampler located at USGS gaging station
    • Bubbler records stage at two-minute intervals
    • Converts to flow using USGS rating curve
overview of sampling cont11
Overview of Sampling (cont.)
  • Samples analyzed by ToxScan Laboratories
    • Total Copper: EPA Method 160.2
    • Total Suspended Solids: EPA Method 200.8
  • 109 samples Analyzed
    • 62 time-weighted samples
    • 47 flow-weighted samples
overview of sampling cont13
Overview of Sampling (cont.)
  • 5-minute instantaneous flow record for entire season: USGS
  • One-hour rainfall record for four gauges: ACFC&WCD
issues raised in peer review
Issues Raised in Peer Review
  • Potential bias due to fixed-point sampling
  • Appropriateness of suspended sediment analytical method
fixed point sampling
Fixed–Point Sampling
  • Issue: Fixed-point sampling with an automated sampler may introduce a bias.
    • Larger grain sizes not evenly distributed
  • Magnitude: ?
  • Potential Resolution:
    • Simultaneous fixed point and equal width integrated sampling.
  • Drawbacks
    • Difficult logistically / expensive.
    • Not consistent with previous data/calibration
total suspended solids analysis
Total Suspended Solids Analysis
  • Issue:
    • Total suspended solids analysis may underestimate suspended sediment concentrations.
  • Magnitude: ?
  • Potential Resolution:
    • TSS and suspended sediment concentration (SSC) analysis on split samples.
  • Drawback:
    • Previous data: TSS
summary
Summary
  • Samples were collected during nine storm events
  • 109 Flow and Time-weighted samples collected and analyzed
  • Good coverage of storm flow during first half of wet season
  • Some uncertainty regarding potential bias