1 / 22

Project Storm Fury

Project Storm Fury. Review. A stochastic variable has the following probability distribution:. Review. What is X’s cumulative probability distribution? What is its expected value (  X =?) What is the Variance of X? What is its standard deviation?. Review. What is the Variance of X?

Download Presentation

Project Storm Fury

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Storm Fury

  2. Review A stochastic variable has the following probability distribution:

  3. Review • What is X’s cumulative probability distribution? • What is its expected value (X=?) • What is the Variance of X? • What is its standard deviation?

  4. Review What is the Variance of X? VarX = xi2P(X=xi) - 2 = [1(1/3) + 22(1/3) + 32(1/3)] - 22 = (1/3 + 4/3 + 3) - 4 = 2/3 What is its standard deviation ()? X = SqrRoot(VarX) = (2/3)1/2 = .8165

  5. Total Property Damage ($ of 1969)

  6. Maximum sustained winds over time

  7. Alternative Hypotheses • H1, the “beneficial” hypothesis. The average effect of seeding is to reduce maximum sustained wind speed. • H2, the “null” hypothesis. Seeding has no effect on hurricanes. No change is induced in maximum sustained wind speed. • H3, the “detrimental” hypothesis. The average effect of seeding is to increase the maximum sustained wind speed.

  8. Mathematical expressions • P(w' | H2) = P(w) = fN(100%, 15.6%) • P(w' | H1) = ƒN(85, 18.6%) • P(w' | H3 ) = ƒN(110%, 18.6%)

  9. Probability density function for Debbie results • P(69, 85 | H1) = 1.50 x 2.14 =3.21 • P(69, 85 | H2) = 0.372 x 1.64 = 0.61 • P(69, 85 | H3) = 0.195 X 0.886 = 0.173 P(H1 | 69, 85) = (3.21 x 1/3)/(3.21 x 1/3 + 0.61 x 1/3 + 0.173 x 1/3) = .81 P(H2 | 69, 85) = .15 P(H3 | 69, 85) = .04

  10. P(H1) = .15 P(H2) = .75 P(H3) = .10 P(H1) = .49 P(H2) = .49 P(H3) = .02 Prior probabilities - pre and post Debbie .81(.15)/ [.81(.15) +.15(.75) + .04(.1)] = .51 .15(.75)/ [.81(.15) +.15(.75) + .04(.1)] = .47 .04(.1)/ [.81(.15) +.15(.75) + .04(.1)] = .02

  11. The Seeding Decision

  12. Probabilities assigned to wind changes occurring in the 12 hours before hurricane landfall Cumulative probability functions

  13. Probabilities assigned to wind changes occurring in the 12 hours before hurricane landfall. Discrete approximation for five outcomes.

  14. The seeding decision for the nominal hurricane $21.7M

  15. The expected value of perfect information

  16. The value of further tests

  17. Review • Decide whose benefits and costs count, and how much. This is typically referred to as determining standing. • Select the portfolio of alternative initiatives. • Catalog potential consequences and select measurement indicators. • Predict quantitative consequences over the life of the project for those who have standing. • Monetize (attach cash values to) all the predicted consequences. • Discount for time to find present values. • Sum up benefits and Costs for each initiative and Perform sensitivity analysis underlying key assumptions

  18. Adapting to Climate Change 1

  19. Adapting to Climate Change 2

  20. Adapting to Climate Change 3

  21. Adapting to Climate Change 4

  22. Adapting to Climate Change 5 Source: Oregon Environmental Quality Commission, Oregon Climate Change Adaptation Framework. December 10, 2010, Salem OR

More Related