1 / 12

Canyon Meadows 2007-2008

Canyon Meadows 2007-2008. …responding to the needs of students, parents, and teachers. Our Crunch Year for Space. For three years, we have know that this would be the year requiring innovative and creative solutions to school organization Our school priority has not changed…

quanda
Download Presentation

Canyon Meadows 2007-2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Canyon Meadows 2007-2008 …responding to the needs of students, parents, and teachers

  2. Our Crunch Year for Space • For three years, we have know that this would be the year requiring innovative and creative solutions to school organization • Our school priority has not changed… optimal learning in a safe environment

  3. The Facts • 481 students • 241 grades 1-3 and 155 grades 4-6 • 2 student entry and exit doors • One playground • One gymnasium • One music room • An enhanced curriculum

  4. Student feedback • Its too crowded at the doors • I don’t get a turn on the play park • I don’t want my snack now, I want it later! • I’m painting a picture, why do I have to go outside now? • I want to play with my friends at recess

  5. Teacher Feedback • We need an uninterrupted literacy block (2 hours) • My students have PE and recess in the morning and nothing in the afternoon • Its too crowded at the doors, by the time my students get out, recess is over • It takes too long to bring students back in to learning

  6. Parent Feedback • It is unsafe and crowded at the doors • Why do 200 kids play on the play park at once and then no one is on it the rest of the day? • My child wants to play with their friends • My child needs his snack at 9:30, not 10:30

  7. We hear you! What can we do? • Crowded doors: • Kinder students are dismissed at staggered times reducing congestion by 50 students • Room 5 and 11 exterior doors are used by 75 students, reducing congestion • Recesses are staggered and varied – everyone is not at the door at the same time

  8. Total Utilization of School Spaces • We are able to schedule our school learning spaces over the whole school day • Gymnasium • Music Room

  9. The play park, too crowded, too empty • Staggered and varied recess – utilization of the play park all day • Play park is not trying to accommodate too many children • Recess is not used up waiting for “turns”

  10. Playing with our friends • Teacher’s schedule recess times with other classes so students can play together • Students have a common 25 minute lunch recess to play together • PE classes are combined, students play together in the gym • Recess is never “missed” because of assemblies, fire drills, schedule changes etc

  11. Uninterrupted Literacy Block • Teachers monitor and decide on the needs of their students • Learning time remains the priority • Balance of work and play for all ages and grades

  12. The Results • Last year, every Friday, teachers utilized a flexible schedule – favorable feedback from all groups • After 5 days of school, working out the kinks • Learning is maximized, not interrupted • No bells interrupting instructional hours

More Related