Seizure Recovery System For Fuel System Distributor. Progress Report Sponsored by Cummins Engine Company Team #11 Michal Brown, Keron Miller, Sean Edwards, Ben Nuttall. Current Progress: Manufacturing drawings have been completed Materials have been selected
E N D
Seizure Recovery System For Fuel System Distributor Progress Report Sponsored by Cummins Engine Company Team #11 Michal Brown, Keron Miller, Sean Edwards, Ben Nuttall
Current Progress: Manufacturing drawings have been completed Materials have been selected Stress analysis of the parts has been performed
Current Activities: • Scheduling shop time with machine shop supervisor • Purchasing materials and necessary tools • Confirming final design with client • Determining optimal assembly techniques • Modifying manufacturing drawings as minor changes are made
Future Project Tasks: • Machining of the parts and final assembly is scheduled to be completed the week before spring break • The assembled prototype will be sent to Cummins for testing • Possible design changes may be necessary as feedback is received from client regarding product testing