An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Cross Border Balancing – 2 Hour Product Considerations

  2. Summary of Existing CBB Interim Arrangements • Under the current CBB Interim arrangements :- • Trades are utilised for Energy; Margin & Constraint purposes • Majority of the ‘non-ramp’ trades deliver across 2 adjacent hourly periods or longer • In the UK CBB transactions avoid real time commitment of 4hr or 6hr BMU alternatives • Availability of CBB in forward plans reduces contingency warming costs i.e. typically £20k-£30k per requirement • Alternative BM actions are costly e.g. locational BMU replacement typically costs in excess of £250/MHh • Existing CBB provides a cost effective solution for short duration demand peak periods (see example)

  3. Example of a Short Run Generation Requirement Generation Requirement SynchronisedGeneration Demand Market Position

  4. Breakdown of CBB Transactions in 2010 Agreed Transactions : 1st Jan – 20th Mar 2010 >1 hr or Straddled Ramps 33% 51% 12% BALIT Type 4% Others

  5. Summary of 2 Hour Product Benefits • A 2-hour CBB product would overcome the concerns of using BALIT to resolve ‘on-the-hour’ demand peaks. • With the suggested timescales – up to 2hrs ahead of delivery start – it will offset other plant commitments with typical costs in excess of £100k per run • In conjunction with the 1 Hr BALIT product it provides a more comprehensive portfolio to manage energy & system balancing across the daily load cycle • Without a 2-hour capability National Grid would have to secure the risk periods (i.e. demand peaks) via alternative pre-gate and post-gate actions thereby reducing the opportunity to fully utilise the CBB facility

  6. Proposed Way Forward • Arrangements for a 2 Hour product exchange should be included alongside the BALIT mechanism at Go-Live • If based on a simplistic pricing structure it can be implemented via the existing contractual arrangements – avoids major changes • It should have minimal impact on BALIT at Go-Live – • only National Grid & RTE participating • French & UK BM risks can be managed through pricing strategies • Proposal that a 2hr capability is included alongside BALIT for at least 1 year after Go-Live – the on-going benefits / disbenefits should then be assessed