1 / 27

Lockheed Martin Challenge

Lockheed Martin Challenge. Vertical Launch UAV Project Plan. Mission Statement. Construct an unmanned aerial vehicle (UAV) with a camera payload UAV must autonomously navigate with real-time video feed to ground station UAV must utilize a pneumatic vertical launch system.

Download Presentation

Lockheed Martin Challenge

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lockheed Martin Challenge Vertical Launch UAV Project Plan

  2. Mission Statement • Construct an unmanned aerial vehicle (UAV) with a camera payload • UAV must autonomously navigate with real-time video feed to ground station • UAV must utilize a pneumatic vertical launch system

  3. UAV Physical Layout • Constraints • Wing Design • Airfoil Selection • 2 Piece Assembly • Materials Selection • Composite vs. Film Covering • Landing System • Belly Land (FR) • Tail • Fuselage • Camera Considerations Modified Byron’s Pipe Dream Design

  4. Propulsion • Trade-off • Gas • Electric • Propulsion Related Requirements • 40-50 kt cruise • 2 hour endurance • Possible Solutions • Hacker • AXI Gold 5330 • Propeller Hacker A60 L Series AXI Gold 5330

  5. Current Design Process • XFLR5 • Methods • Vortex Lattice • Lifting Line • Output • Cl, Cd • Very efficient for low Reynolds Numbers • Structures Spreadsheet • Mike Garton • MotoCalc 8 • Engine Requirements

  6. Systems Integration • Launch System • Attachment • Avionics • Autopilot switchover

  7. Technical Challenges • Endurance • Weight • Power • Size – Humvee Capacity • Launch Sequence • Aircraft-Launch System Attachment • Control • Structural Integrity

  8. Pneumatic Launch System Components • Piston and Casing • Cradle and Carriage • Collapsible Legs • Pneumatic System

  9. Piston and Casing • Encased piston tube • Magnetic piston • Rubber piston stop

  10. Cradle and Carriage • Magnetic carriage • Carriage slides along casing above piston • Cradle mounted on carriage • Slot for hook attachment on plane

  11. Transportation • Requirements: • To fit within the back cargo hold of a small Humvee • Assemble within ~5 min • Design Solution: • A compact rod-less pneumatic slide • Collapsible stabilizing legs • Launch from the ground

  12. Pneumatic System

  13. Force Requirements • Design Specifications: • Plane weight 20 lbs • 100 psi air pressure • Final launch height of 100 ft • Using an Excel sheet to predict forces • Determine: • Air tank size • Valve size • Piston stroke length • Etc.

  14. Testing and Integration • Testing • Pneumatics • Can we launch a 20 lb plane with a 100psi of air to a 100ft? • If not what can we do? • Actual field tests with a test plane • Integration • Plane cradle • Autopilot control

  15. Avionics and Electrical Systems Components Autopilot Video Ground Station

  16. Autopilot Requirements • Autopilot System must: • Be capable of autonomously navigating using waypoint navigation • Support a vertical pneumatic launch • Be capable of monitoring and controlling all systems necessary for flight • Support manual-override control • Be capable of transmitting real-time flight data to the ground control station

  17. Autopilot • Prime Concerns: • GPS, Inertial Measurement Unit, Compass, Gyroscope modules • Ability to interface with aircraft systems • Customization for launch and landing sequence • Cost

  18. Video Requirements • Video System must: • Return real-time video to a base station • Be able to distinguish a 6” target at 100’ • Be capable of a minimum 30 minutes of operation • Be designed in a “modular” fashion

  19. Camera 100 ft • Industrial Box style camera • Able to be customized based on lens • Vari-focal Auto-Iris Lens • Manual adjustable focal length 45° 83 ft X / 83 pixels per foot 70° 100 ft 140 ft X / 140 pixels per foot

  20. Ground Station Requirements • Ground Station must: • Display real-time video as transmitted from the onboard camera • Provide controls necessary for manual override • Be capable of transmitting and receiving flight data to the onboard autopilot system • Be mobile and have the ability to be transported in the back of a military humvee

  21. Ground Station • Separate displays for video and flight data • Components chosen based on onboard systems • Mobile power source based upon requirements of ground station components

  22. Primary Concerns • Launch to cruise transition • Data transmission and reception range • Flight time

  23. Launch to Cruise Transition • Vertical Launch • How/When does main autopilot take over? • Customize autopilot for launch

  24. Data Transmission/Reception • Range above 10 miles becomes problematic • Using a directional antenna presents problems • Omni-directional antenna – power consumption problems • Planning on approximately 5W transmitter for video system • Independent transmitter for video system Radius: x Power Required: y Radius: 2x Power Required: y2 Radius: 3x Power Required: y3

  25. Flight Time • Original flight time requested by Lockheed Martin: 2hrs • Power consumption for this length of time is problematic • More Batteries = More Weight • Control subsystem power consumption

  26. Deliverables for Fall 2008 • Project Plan – Sept 27, 2008 • Initial design of each component – Oct 15, 2008 • Physical system build complete – Nov 1, 2008 • Integration of rail launch and aircraft – Nov 30, 2008 • Begin testing of autopilot system – Nov 30, 2008 • Testing of airplane and launch system – Dec 1, 2008 • Final draft plan – Dec 15, 2008

More Related