This project focuses on the installation of new structures at the Populus Terminal, specifically the Ben Lomond to Terminal section. It includes the setup of angle structures and the integration of the Populus Substation in Downey, Idaho, designed to accommodate existing Bridger West lines from Wyoming, as well as the future Gateway West 500kV line. Essential components such as the placement of a 345kV circuit breaker and installed poles are integral to enhancing the operational capacity and efficiency of the terminal and substation.
E N D
Populus to Terminal New structures on left (Ben Lomond to Terminal section)
Populus to Terminal Angle Structure Installation
Populus Substation Populus substation (Downey Idaho) – Sized to integrate Populus Terminal, existing Bridger West lines (from Wyoming) and future Gateway West 500kV line (from Wyoming)
Populus Substation Populus substation– Placing 345kV circuit breaker
Populus to Terminal Populus to Ben Lomond section – installed poles