An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. S-101 Project Plan November 2009

  2. Purpose • S-101 represents a major step forward in product specifications for Electronic Navigational Charts. • This consists mainly of new feature types to overcome existing issues (e.g. overuse of caution areas) and improved functionality leading to more efficient data handling. • As a result, TSMAD is proposing a phased approach for the development , testing, and release of S-101

  3. Benefits • Iterative Development • Each iteration is usable and testable • Controlled change • Enables a test of the change control process to both S-101 and S-100 • Enables smooth migration • Manageable change • Will mitigate type approval concerns • Ensure that S-101 catalogues are not software or hardware updates • Does not try and solve everything at once • Enables stakeholders to phase their development implementation of S-100 based product specifications

  4. Phase 1: S-57 ENC Content Equivalent • S-101 draft 0.1 contains: • Feature Catalogue • includes only those features and attributes that are currently in S-57 3.1.2 • XML • Portrayal • Constrained by S-52 PL 3.4 • General Feature Model • Includes the S-100 geometry • Compound curves • Will contain updates - .001, .002 • Use of the new 8211 encoding • Deliverable: S-101 .000 file and updates (no catalogue file)

  5. Phase 1: Activities • Feature Catalogue • Create XML Feature Catalogue • Create XSLT Style Sheet • Information types will be utilized for the new 8211 • Begin developing Version 1 Data Capture and Classification Guide • Develop draft 0.1 test dataset

  6. Phase 1: Test

  7. Phase 1: Benefits • Proof of Concept and validation of S-100 • Feature Catalogue is exchanged as data • Utilization of the new 8211 encoding • Creation of an S-100 compliant product specification • Template for other S-100 product specifications • Prove that an S-57 based product can be built using S-100

  8. Phase 2: Enhanced Packaging and Data Loading Mechanisms • S-101 draft 0.2 contains: • New support file formats and management • New file naming conventions • Populating exchange sets • Metadata • Improved Display Scales for ECDIS loading • Updating Scenarios • Includes text file updating • Portrayal Catalogue is introduced • Deliverable: Complete Exchange Set including updates

  9. Phase 2: Activities • Define new file formats (XHTML, JPEG etc.) • Define new naming convention • Create multiple test data sets utilizing the enhanced display scales • Create enhanced updating scenarios • Enhance metadata and data discovery

  10. Phase 2 test plan

  11. Phase 2: Benefits • Demonstrate improved functionality of S-100 • Prove that this process is supportable • Improved data delivery • Improved data discovery • Easily Accessible Metadata • Support File Improvements (xhtml, jpeg) • Continuous dialogue between IHO and stakeholders • Opportunity to test potential efficiencies • Platform to demonstrate new capabilities

  12. Phase 3: Extending the Model • S-101 draft 0.3 contains: • Utilization of extended model capabilities • Introduce Complex attributes • Introduce Information Types • Multiple language support • Explore the use of cartographic attributes for enhanced display • Continue to update the Data Capture and Classification Guide to support enriched content • Issue a new version of the Feature Catalogue and Portrayal Catalogue with content changes • Deliverable: Phase 2 deliverables with extended content and updated Feature Catalogue and Portrayal Catalogue

  13. Phase 3: Activities • Feature Catalogue • Create XML Feature Catalogue • Include Complex attribute • Include Information type (enhanced language support) • Include Cartographic Attributes • Portrayal Catalogue • Create XML Portrayal Catalogue • Include updated portrayal to reflect extended feature catalogue • Utilize Add, Modify and Delete in the Portrayal Catalogue • Deliverable: Complete Exchange Set, updated Feature and Portrayal Catalogues, Data Capture and Classification Guide

  14. Phase 3: Test Plan

  15. Phase 3: Benefits • Prove maintainability • Feature Catalogue updating • Portrayal Catalogue updating • Enhanced language support • Improved Update process • Prove that the catalogues are machine usable data • Data Quality and Usability improvements • Complex attributes will clean underlying data

  16. Phase 4: Scalability • S-101 draft 0.4 contains: • Introduce the concept of Scale Independent and Scale Dependent Datasets • Create an information object dataset that contains all the information objects for every dataset associated with it. • Finalize Version 1 of the feature catalogue and portrayal catalogue • Additional complex attributes • Additional information types • Deliverable: Version 1.0 of S-101 Test Dataset and test datasets containing scale independent and scale dependent data

  17. Phase 4: Activities • Finalize Version 1 Feature Catalogue • Finalize Version 1 Portrayal Catalogue • Finalize Version 1 Data Capture and Classification Guide • Creation of S-101 Version 1.0 Test dataset • Create Test Data containing scale independent and scale dependent data.

  18. Phase 4 Test Plan

  19. Phase 4: Benefits • Test the continued maintenance of the standard • Improves the ability of data producers to reflect the real world • Caution Area Reduction

  20. Implementation Matrix

  21. S-101 Timeline