Open-Source Remote Monitoring System for Solar Power: A Sustainable Solution

DESCRIPTION

This project presents an open-source monitoring system for remote solar power systems, addressing the limitations of existing products through accessible hardware and software components. Implemented using Arduino and a disposable cell phone, the system transmits data via DTMF tones for cost-effective monitoring. Future implementation plans include collaboration with Advanced Solar Technologies, Inc. for testing and documentation. The aim is to provide individuals with a practical, extensible, and reproducible solution for decentralized power generation.

1 / 11

Download Presentation

Open-Source Remote Monitoring System for Solar Power: A Sustainable Solution

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript

Playing audio...

  1. Senior Project: Presentation 1 An Open-Source Remote Monitoring System Nikolas Wolfe CEN 4914 October 6, 2009

  2. What? • An open-source monitoring system for remote solar power systems • Two Parts: 1.) Hardware Component: Interfaces with charge controller, transmits data 2.) Software Component: Stores and analyzes data

  3. Why? • Existing products are expensive, limited, and proprietary • RM is an important aspect of decentralized power generation • Individuals should be able to take their own initiatives

  4. Inspiration? Why doesn’t this work? Sanyang, The Gambia, Summer 2007

  5. Requirements? • No Customized Hardware • All Open-Source Software • Extensible and Reproducible • Minimizes After-Installation Costs

  6. Implementation, Part 1 What is the simplest, least expensive way to accomplish this? Arduino Duemilanove: $30 disposable cell phone: $15

  7. Implementation, Part 2 Phone dials DTMF tones… Putting the pieces together…. DTMF transmitted over connected line… Arduino enables buffers…

  8. Gantt Chart for Future Implementation 1

  9. Gantt Chart for Future Implementation 2

  10. Highlights… • Not a replacement for maintenance of solar power systems! • Working with Advanced Solar Technologies , Inc. (http://ast-solar.com/) on requirements, testing • Further documentation online at http://code.google.com/p/solar-monitoring-project/

  11. Conclusion… • Realistic expectation is for working prototype • Progress slow but steady…