This report outlines the evaluations of construction plans and reliability assessments presented during the ICT Transmission Planning Summit on July 29, 2008, held at the Astor Crown Plaza in New Orleans, Louisiana. It provides insights into the Base Plan and Construction Plan projects with specific project numbers and expected in-service years. Key projects discussed include the 115kV and 500kV infrastructure improvements. The document also emphasizes stakeholder engagement and the next steps for finalizing the Base Plan, ensuring project inclusion and addressing real-time concerns through strategic developments.
E N D
ICT Construction Plan Evaluation and Reliability Assessment Part 2 Entergy ICT Transmission Planning SummitJuly 29, 2008Astor Crown PlazaNew Orleans, Louisiana
Map Legend Code for Base Plan and Construction Plan Projects Indicated on Maps BP08-036 = Project Number from 2008 Base Plan CP(2011) = 2008 Construction Plan and Expected In-Service Year DCP(2011) = 2009 Draft Construction Plan and In-Service Year BP08-036 CP(2011) DCP(2011) Project is in 2017 model Project is not included in model Background Color Indicates Projects’ Inclusion In Case
NA NA DCP(2013)
NA NA DCP(2013)
Other Areas These concerns seen in real-time may be relieved by projects in the Base Plan, Construction Plan or Draft Construction Plan. • Hot Springs-Bismark 115kV FTLO El Dorado-Longwood 345kV (Base Plan Project) • Liberty-Gillsberg 115kV FTLO Franklin-Bogalusa 500kV (Construction Plan Project with ISD 2009) • Hartburg-Inland Orange 230kV FLTO Hartburg-Cypress 500kV (Draft Construction Plan Project with ISD 2010)
Base Plan Development Next Steps • Stakeholder Comments • Discuss Stakeholder Comments at September LTTIWG • Present Draft Base Plan at October LTTIWG • Finalize Base Plan and Post January 2009
Steve PurdyLead Engineer, ICT Planning501-614-3371SPurdy@SPP.org Jason RussellEngineer II, ICT Planning501-614-3354JRussell@SPP.org