1 / 13

The PFIT Project WW07'14

The PFIT Project WW07'14. Intel Corporation Platform Engineering Group Nick Klein Jan 30, 2014. The PFIT Project. Agenda Objective Strategy Timeline. The PFIT Project key objectives. Apply LEAN principles to Advanced FI

osmond
Download Presentation

The PFIT Project WW07'14

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The PFIT Project WW07'14 Intel Corporation Platform Engineering Group Nick Klein Jan 30, 2014

  2. The PFIT Project • Agenda • Objective • Strategy • Timeline

  3. The PFIT Project key objectives • Apply LEAN principles to Advanced FI • Define equipment required to optimize automated Advanced FI test throughput time (TPT) • Development of industry standard automated Advanced FI equipment to significantly reduce FI throughput time and expense.

  4. Reasons for the PFIT project • Advanced FI methodologies currently rely on equipment intended for functional FI. • Functional and Advanced FI equipment needs differ significantly, in that testing is often performed on completely non-functional parts, and require much higher test currents and dual-polarity voltages. • This project extends the capability of Advanced FI across all product lines to significantly decrease TPT.

  5. The PFIT Project • Agenda • Objective • Strategy • Timeline

  6. The PFIT Project strategy • Identify strategies to enhance existing functional FI • Determine essential minimum equipment • Curve tracing • Latch up • High-current Bin8 • Develop TIU • Universal carrier interface • Daughter board per product • Develop automated LabView test procedures • Mostly universal across product lines • Document entire system for copy-exact to other sites

  7. The PFIT Project • Agenda • Objective • Strategy • Timeline

  8. The PFIT Project timeline Board design and Software Design Harness Design Pre-Power On testing. Demos and implementation Spec writing Phase 1 Phase 2 Completion Boards in house Validation

  9. Back up

  10. Backplane block diagram

  11. Family board block diagram

  12. Project File

More Related