BOCC Implementation Details Three Baskets Residential Sector Non-residential Sector Civil Engineering Works Systems for Residential Sector Systems for Non-residential Sector Systems for Civil Engineering Former Hierarchy BOCC Hierarchy Residential Basket Construction Components

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about '' - oshin


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

Three baskets l.jpg
Three Baskets

Basket of Construction Components (Walsh and Sawhney)


Residential sector l.jpg
Residential Sector

Basket of Construction Components (Walsh and Sawhney)


Non residential sector l.jpg
Non-residential Sector

Basket of Construction Components (Walsh and Sawhney)


Civil engineering works l.jpg
Civil Engineering Works

Basket of Construction Components (Walsh and Sawhney)


Systems for residential sector l.jpg
Systems for Residential Sector

Basket of Construction Components (Walsh and Sawhney)


Systems for non residential sector l.jpg
Systems for Non-residential Sector

Basket of Construction Components (Walsh and Sawhney)


Systems for civil engineering l.jpg
Systems for Civil Engineering

Basket of Construction Components (Walsh and Sawhney)


Former hierarchy l.jpg
Former Hierarchy

Basket of Construction Components (Walsh and Sawhney)


Bocc hierarchy l.jpg
BOCC Hierarchy

Basket of Construction Components (Walsh and Sawhney)


Residential basket l.jpg
Residential Basket

Basket of Construction Components (Walsh and Sawhney)


Construction components l.jpg
Construction Components

Basket of Construction Components (Walsh and Sawhney)


Construction components13 l.jpg
Construction Components

Basket of Construction Components (Walsh and Sawhney)


Construction components14 l.jpg
Construction Components

Basket of Construction Components (Walsh and Sawhney)


Construction components15 l.jpg
Construction Components

Basket of Construction Components (Walsh and Sawhney)



Overview of price collection l.jpg
Overview of Price Collection

  • BOCC uses the SPD/PS methodology for price collection

  • Identified components are representative and comparable

  • Components are converted into SPDs for price collection purposes

Basket of Construction Components (Walsh and Sawhney)


Overview of price collection18 l.jpg
Overview of Price Collection

  • Country resources such as public works department and published schedule of rates can be used for pricing

  • Countries will be required to price 40 components

  • BOCC methodology can also be adopted for inter-temporal price index

Basket of Construction Components (Walsh and Sawhney)


Example component pricing l.jpg
Example Component Pricing

Basket of Construction Components (Walsh and Sawhney)


Sample spd l.jpg
Sample SPD

Basket of Construction Components (Walsh and Sawhney)







Use of spd l.jpg

100

200

300

350

Use of SPD

Example: 1 lane-km of asphalt paving. Cross section is shown.

Curb/Gutter – typical (price of this item not included in component price)

4000

AC Wearing Course

AC Binder Layer

Base Course

Subbase

Compacted Subgrade (price of this item not included in component price)

Basket of Construction Components (Walsh and Sawhney)


Slide27 l.jpg

Expert input will be needed to obtain

1. The labor mix.

2. The equipment mix.

The remaining unit costs can come from construction experts, but they can also be updated using standard methods.

The labor and equipment mix and hours need only be updated on the time scale of productivity and method changes.

Basket of Construction Components (Walsh and Sawhney)



Expenditure weights in bocc l.jpg
Expenditure Weights in BOCC

Basket of Construction Components (Walsh and Sawhney)


Expenditure weights30 l.jpg
Expenditure Weights

  • W1—for aggregation of residential, non-residential and civil engineering baskets

  • W2—for aggregation of systems

  • W3—for inclusion of labor productivity and labor/equipment tradeoff

  • W1 already available and W3 designed into BOCC

Basket of Construction Components (Walsh and Sawhney)


Sample system weight w2 l.jpg
Sample System Weight (W2)

Table 7: Cost Breakdown for Construction in Canada for Year 2000 (Source: Hanscomb 2000)

Basket of Construction Components (Walsh and Sawhney)


Determination of w2 l.jpg
Determination of W2

  • Determined at country level

  • Historical construction project pricing information needed

  • Key goal is to determine percentage breakdown by system type

  • Needed for each basket (residential, non-residential, and civil engineering)

Basket of Construction Components (Walsh and Sawhney)