Submarine Warfare Federated Tactical System (SWFTS) Post Installation Testing Value Stream Analysis (VSA) 9-11 July 2008. Scott Turk – cell (904) 252-5403 Brian Toth – cell (757) 274-8689. SWFTS VSA Charter. Develop commonality across all subsystem testing

orinda
Download Presentation

Scott Turk – cell (904) 252-5403 Brian Toth – cell (757) 274-8689

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Submarine Warfare Federated Tactical System (SWFTS)Post Installation TestingValue Stream Analysis (VSA)9-11 July 2008 Scott Turk – cell (904) 252-5403 Brian Toth – cell (757) 274-8689

  2. SWFTS VSA Charter Develop commonality across all subsystem testing Focus on Subsystem Operational Verification Testing (SOVT) and System of Systems (SoS) Level testing guidance and requirements. Develop a process to ensure a good hand-off from I&T Full understanding of SoS lab testing Leverage as much as possible from I&T (lab results, test procedures, process, etc.).  Document what hasn't and needs to be pushed to the platform. No or minimum repeat/duplication of testing onboard Leverage off I&T test procedures Identify the “Hard Spots” that technology may be able to solve for us – Example: Automated Testing Test and Troubleshoot Onboard like in the Lab

  3. SWFTS VSA Charter • Streamline Post-Installation Testing process to support ship Modernizations and reduce Ao • Incorporate SCS Cap testing to better identify and validate mission scenarios earlier • Ensure IA testing requirements and documentation are addressed

  4. POST-INSTALL VSA RESULTS PROJECTED SAVINGS REDUCTION OF 8 SCHEDULE DAYS Savings = 10 days Additional Work* = 2 days Schedule Reduction = 8 Days *includes C5I/SOS Operability Test to meet SCS CAP requirements

  5. POST-INSTALL TEST METRICS • BOISE TI-08 Projected Test Duration • Power-On Diagnostics, SW Builds and Subsystem Assessment (5 days) • C5I/SOS Network Connectivity and Interface Test (10 days) • C5I/SOS End-To-End Operability Test (2 days) • Include SCS CAP mission requirements • Include Fleet Phase 2 Training (saves 2 days) • Days Saved Due To: • Integrated Test Plan (includes Training requirements) • PARMs deliver SW already built on hard drives • Round-The-Clock Testing • No GTS Testing

  6. POST-INSTALL TEST METRICS • Phase out requirement for ARCI Dockside Difference Training (5 days overall schedule savings) • Deliver CM build disks with SW media and blank swap drives (JDI - all PARMs) (saves 1 day) • Guidance Test Set (GTS) only required for first article (saves 2 days)

  7. FUTURE STATE RECOMMENDATIONS • Formalize problem feedback process for HW, SW, GFI, Test Procedures • Establish Test Procedure IPT (integrate into SWFTS JTG) • Collect and report metrics for installation days lost • SWFTS PICO Test Teams located at all homeports (RIE) • Implement standard integrated single MOA, In-Brief, Readiness To Start and Completion Messages (PROJECT - for Backfit TI-08, VA already does)

  8. FUTURE STATE TEST PHASES I&T LAB TEST INSTALL READINESS REVIEW POWER-ON DIAGS, SW BUILDS & SUBSYSTEM ASSESSMENT AVAIL START CABLE TEST LIGHT OFF C5I/SOS NETWORK CONNECTIVITY & INTERFACE TEST C5I/SOS END-TO-END OPERABILITY TEST AT-SEA TEST

  9. Post-Installation Test VSA Rapid Improvement Plan

  10. POST-INSTALL VSA TEAM

  11. Back Up

  12. I&T LAB TEST • Maximize in the lab, minimize on deckplates • Define test requirements & procedures for SW-Only ECIs • Maximize use of WAIF capability (existing VSA action) • Investigate possible redundant SE&I testing onboard (VA only) • Provide lab test results to Install Team (existing VSA action) • Ensure I&T output meets/matches Installaion expected input

  13. AIT CABLE TEST • End-to-end Cable Test (Fiber & Copper) during installation to minimize disruption after lightoff • Define proper cable test requirements and methods • 30 days Flow Time, 10 days Touch Time, in parallel with industrial work

  14. POWER-ON DIAGS, SW BUILDS & SUBSYSTEM ASSESSMENT • Prepare individual subsystems for C5I/SOS Interface Test • Single C5I/SOS Deckplate Coordinator • Integrated On-Site Test Team • SW delivered just-in-time for lightoff (SE/I&T action) • Find, Fix & Retest (FFR) throughout all test phases • Deliver CM build disks with SW media and blank swap drives (JDI - all PARMs)

  15. POWER-ON DIAGS, SW BUILDS & SUBSYSTEM ASSESSMENT • Develop integrated test procedures (JTG action) • Automated Testing & Reporting (SE/I&T action) • Common Problem Reporting Database throughout all test phases (existing VSA action) • BOISE duration (projected) – 5 days Flowtime

  16. C5I/SOS NETWORK CONNECTIVITY & INTERFACE TEST • Verify subsystem interconnectivity • Develop C5I/SOS Integrated Interface Test Procedure (RIE) • First article SE&I onboard testing (JDI-Backfit, VA already does) • Incorporate IA posture transition & downgrade • BOISE duration (projected) – 10 days Flowtime • RIE – to improve Flowtime

  17. C5I/SOS END-TO-END OPERABILITY TEST • Provide dockside confirmation that ship is ready to support Fast Cruise and At-Sea operations • OBTT scenarios, power bus shifts, network failovers, etc. • Identify and integrate SCS CAP mission scenario requirements • Guidance Test Set (GTS) only required for first article (saves 2 days) • TYCOM approve Ship’s Force to conduct/participate in Operability Test • Duration – 48/72/96 hours (as applicable) • Generate Installation Completion Message

  18. AT-SEA TESTING • NAV CERT (if necessary) • Eliminate at-sea test requirement for ARCI, roll into SCS CAP (JDI-PMS401)

  19. MACRO-VSM FOR POST-INSTALL TEST