1 / 95

SMS I NFRASTRUCTURE L TD ( Previously known as ShaktiKumar M. Sancheti Ltd. )

SMS I NFRASTRUCTURE L TD ( Previously known as ShaktiKumar M. Sancheti Ltd. ). Regd Office : 267, Ganesh Phadnavis Bhavan, Near Triangular Park, Dharampeth, Nagpur – 440010 (India) Telephone : +91-712-2525410 Fax : +91-712-2544039 Email : sanbros_ngp@sancharnet.in website : www.smsl.co.in.

omer
Download Presentation

SMS I NFRASTRUCTURE L TD ( Previously known as ShaktiKumar M. Sancheti Ltd. )

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SMS INFRASTRUCTURE LTD(Previously known as ShaktiKumar M. Sancheti Ltd.) Regd Office: 267, Ganesh Phadnavis Bhavan, Near Triangular Park,Dharampeth, Nagpur – 440010 (India)Telephone : +91-712-2525410Fax : +91-712-2544039Email : sanbros_ngp@sancharnet.in website : www.smsl.co.in

  2. About Us • SMS Infrastructure Ltd is one of India’s leading company in the core Infrastructure sector with its foray into Highways, Dams, Tunnels, Power, Mining, Urban Infrastructure, Irrigation, etc. It has also forayed into the emerging sectors of Highway Management, Toll ways, Rail linking Projects, Construction of Hydropower Projects, Hazardous Treatment, Buildings/ Housing Projects, etc.. • SMSL has an unblemished track record of Technical and Engineering capability. • An integrated project execution & adherence to time schedule thus establishing its significant status in almost all sectors of its activities. • An unblemished track record of quality since last 43 years of its existence. • The company has been catering to a highly impressive list of CLIENTS

  3. About Us • CENTRAL INDIA’S LARGEST INFRASTRUCTURE COMPANY • CLOSELY HELD PROFESSIONALLY MANAGED COMPANY • COMMITTED & DEDICATED WORK FORCE OF 2,600 PERSONNEL • REVENUE FOR THE YEAR ENDED 31ST MARCH, 2005 Rs. 184.75 CRORES. • COMPANY FIGURES IN THE LIST OF FIRST 500 UNLISTED COMPANIES OF INDIA, LIMCA BOOK OF RECORDS ETC. • SEVERAL NATIONAL AWARDS IN ITS FIELD OF WORKS

  4. The Team • The Company is headed by first Generation entrepreneur Shri Shaktikumar M Sancheti who is in this field for more than 45 years. • Qualified and Professional Management. • Corporate Governance parameters being adhered to. • Employee Attrition rate of less than 1% • Social upliftment policies being adopted • Joint Venture with various stalwarts in the industry

  5. Sectors of Working • Power • Irrigation • Highways • Railways • Environment • Mining • Urban & Rural Development • Public-Private Participation projects

  6. Power Sector It is proposed to add 14,393 MW capacity from hydro in the total capacity addition of 41,110 MW during the tenth plan period. Source : www.planningcommission.nic.in

  7. Power Sector (cont’d) The company has been executing various works for Thermal Power Plants, Hydro, Oil & Gas based Power Plants. The company is also actively advancing its presence in transmission and Distribution sector. The company is also in the business of identification of areas where hydro power plants can be set up.

  8. Power Sector (cont’d) The various activities carried out by the company in these areas are: • Generation • Thermal Power Plants - Survey, Identification, Layout & Land Development of entire power plant - Civil works facilitating the erection & commissioning of Heavy Machinery, Coal Handling plant, Wagon Tripler, Track Hopper & Conveyor foundation - Civil work for Boiler, Turbine, Bunker foundations, Chimney etc. - Civil works for R.W. & C.W. Pump Houses - Construction & Raising of Ash pond/Ash Bund/Ash Dyke - Civil & Mechanical work for Ash Disposal, Water Supply, etc. including Pipeline, Structures etc. - Construction of ETP, WTP and recycling system, Ozonisation etc. - Construction of staff quarters & other amenities.

  9. Power Sector (cont’d) 2. Hydro Power Plant Construction of Inter adit Tunnel to pressure shaft, Ventilation Tunnel, Tail rase channel, Pressure shaft, Transformer hall, machine hall, Lower adit Tunnel to pressure shaft, Underground Power House, Supply and laying of Turbines, Fabrication, and Erection of Towers with Stringing of 220/400 KV Transmission Lines and all kinds of Civil and Mechanical work for Hydro Power Projects.

  10. Power Sector (cont’d) • Transmission & Distribution • Transmission lines : Turnkey works of Fabrication, Erection and Construction of Towers with Stringing of 220/400 KV Transmission Lines and commissioning. • Substation : Construction of sub station buildings, civil works for foundations, supply and installation of transformer, Circuit breaker, CT, PT, Isolator, Jumper, Hardware, Gantry, Lightning arrester, battery charger, remote control panel. 3.Operation, Maintenance & Running of High capacity DG sets.

  11. Irrigation Sector During the 10th Plan period, the States have projected creation of an additional irrigation potential (major, medium and minor) of 16.743 m.ha. with an outlay of Rs. 84,734.64 crore. Source : www.planningcommission.nic.in The Indian Scheduled Commercial Banks are under an obligation to lend at least 40% of their aggregate loans to the priority sectors and within the overall target for priority sector at 40%,these banks have to observe a target of 18% for agriculture sub-sector. Source : Budget 2004-05 The company sees immense potential in this field once the interlinking of river starts. The company has entered into joint venture for execution of these types of projects outside the country also.

  12. Irrigation Sector (cont’d) - To its distinction, the company has constructed Rs. 100 crore Turnkey Masonry Dam. - The co. has executed several minor & major earthen dams and spillways & several lift irrigation schemes. - The company has constructed several hundred Kilometers of canals – both lined & unlined. - The company has executed largest number of irrigation tunnels in Central India used for diversion of water.

  13. Irrigation Sector (cont’d) • Dams & Reservoirs Spillways The company has successful track record of executing all types of dams ie Concrete, Masonry, Earthen, Rockfill dam etc. along with the spillway. In this category the company executes following work: • Concrete/ Masonry Spillway including Inspection Gallery, Overflow section, Non Overflow section, Stilling basin, Concrete Apron, Cut Of Trench, Buried Channel, Pier, Anchoring, Drilling & Grouting, Masonry, Colgrout Masonry, Concreting including reinforcement, gauge filling etc.

  14. IrrigationSector (cont’d) 2. Earthen Dams including Hearting, Casing, Embankment, Excavation, Hard Rock Excavation, Protection work, Inspection Roads, Overflow section, etc. 3. Turnkey execution of storage reservoir of large magnitude, 4. Approach Channel, Tail Channel, Inlet Channel Power Outlet. 5. All types of excavation & Embankment, Hard rock ex near habitation etc. 6. The company has bagged several awards in the field of Quality & Safety in this Category.

  15. Irrigation Sector (cont’d) • Tunnels The company is executing different size, shape & Long tunnels for facilitating supply of water in Hilly areas. The company is capable of executing following works: - Drawing & Design including planning geological survey including Strata Classification - Entry & Exit Channel, - Portal development - Underground excavation with conventional method - Lining of tunnels,

  16. Irrigation Sector (cont’d) - Shotcrete (wet & dry) using wire mesh & Fiber Reinforcement, - Wedging, - Drilling & Rock Bolting with Cement Capsule resin injection, - Cut & Cover,Structural work including lagging, - Roof Protection, - Formation of Bunds to create stilling basin at Off take regulator.

  17. Irrigation Sector (cont’d) Lift Irrigation Scheme The company has successfully executed & is capable of executing following works : Civil Works for Pump House including Forebay, Excavation, Embankment, Concreting, Drilling & Grouting, Intake well, Jack Well, Fabrication, Erection of Large & Small Dia Pipeline, Erection of Overhead Gantry, EOT Crane Switch Yard room & Pump Foundation, Canals & Over Head Reservoirs,

  18. Irrigation Sector (cont’d) • Canals Construction of Canals including Hearting, Casing, HDPE Lining, Concrete lining (Mechanical & Manual) including sides & Bottom, Pitching, Aqueducts, Structures, Head Regulator, Cross Regulator, Distribution System etc. • Fabrication, Erection & Installation of Gates. Construction of piers, Fabrication, Erection of Gantry structure, Radial Gates, Auto tilting gates, EOT, Gate opening Valves, Embedment, Guiding Channels etc.

  19. Transportation Sector • Roads • Bridges • Railway Lines • Tunnels • Flyovers

  20. Road Sector A Committee on Infrastructure headed by the Hon’ble Prime Minister has proposed a massive infrastructure development programme for the next 7 years The programme envisages an investment of Rs.1,72,000 crore on following developmental projects:   (i)  Completion of GQ and EW-NS corridors   (ii)  4-laning of 10,000 km under NHDP Phase-III (iii) 2-laning with paved shoulders of 20,000 km of National Highways under NHDP Phase-IV (iv) Augmenting highways in North East under  Special Accelerated Programme

  21. Road Sector (cont’d) (v)  6-laning of selected stretches of National Highways under NHDP Phase-V (vi) Development of 1000 km of expressways under NHDP Phase - VI (vii) Construction of ring roads, flyovers and bypasses on selected stretches under NHDP Phase-VII. Source : http://morth.nic.in (Ministry of Road Transport & Highway)

  22. Road Sector (cont’d) The company is capable of executing Road work of National Highways and expressway of any length including works of 2/4 Laning New Alignments, 4/6 Laning of existing highways,Construction of bypasses, Service roads, Hill roads etc. • Detailing - Survey, drawing, design.with site investigation, sub-soil exploration and testing of the geo-material. - preparation of detailed project report with the estimation, - Approval from Railways - Setting out. 2. Construction work - Formation work includes Earthwork in excavation and embankment - Subgrade with Murrum blanketing - Mining, cursing, supplying of metals.

  23. Road Sector (cont’d) Apart from this the company execute specialized works in this area like: • Soil stabilisation using Geosyntehic, • Mechanical Stabilition • Lime stabilisation • Bitumen Stabilisation • Cement treated granular subbase, • Bituminous concrete using Lime, • Crumbed rubber mix bituminous concrete, • Modified bitumen concrete.

  24. Construction of Bridges The company is capable of executing such works for 2/4 Lane new alignment, Construction of 4/6 Laning of existing highways, Construction of bypasses, Service roads, Hill roads including Construction of any size and weight of Major river Bridges, flyovers, Road over bridges,Road under bridges,Rail over bridges, Minor bridges, C.D.works,Bailey bridges,steel bridges. For execution of the above, the Company carries out the following activities: • Detailing - Survey, drawing, design.with site investigation, sub-soil exploration and testing of the geo-material. - Preparation of detailed project report with the estimation, - Approval from Department - Setting out.

  25. Construction of Bridges (Cont’d) • Construction work - Formation work includes Earthwork in excavation and embankment. - The company is capable of executing the Major river bridges with shallow foundation, deep foundation like Raft, cast-in situ Concrete Driven & Bored piles ,sheet piles,under reamed piles, Well sinking Box caisson,open caissons, Heavy well, well sinking and coffer dam. - The substructure including Construction of Hallow piers, solid piers and abutments using slip form shuttering with continues pouring at any height. - Pier caps with different shapes and size

  26. Construction of Bridges (Cont’d) Super structures including different types of pre-cast, pre-stressed, pre-tensioned and post-tensioned cast-in situ type Girders namely box girder,I shape girder, Box diaphragm type girder,Segmental girder, Solid Deck Slab, Voided slab, RCC Crash barrier,railings and mastic concrete. Also the company specializes in launching of girder of any size and length at any height.

  27. Railway Over Bridge/Under Bridge The company is capable of executing the following work in this category Detailing - Survey, drawing, design.with site investigation, sub-soil exploration and testing of the geo-material. - preparation of detailed project report with the estimation, - Approval from Railways - setting out. Construction of ROB/ RUB of any length and any size with shallow and deep foundation like Raft, cast-in situ Concrete Driven & Bored piles ,sheet piles,under reamed piles, Well sinking Box caisson,open caissons, Heavy well, well sinking and coffer dam.

  28. Railway Line The total arrears of track renewal at the beginning of the Tenth Plan 2002-07 and including those arising during the Tenth Plan would be 34,990 km. Indian Railways is taking up construction of new lines under cost-sharing arrangement and through the SPV route in association with the State Governments. Source : www.planningcommission.nic.in As against 662 km. of new lines completed in the Ninth Plan, a total of 1310 km of new lines are expected to be completed during the Tenth Plan period which will give connectivity to some mineral rich areas, ports and strategic areas. The thrust would be on completing the works that provide connectivity to ports/industry and those projects which enhance the capacity of saturated sections and remove bottlenecks in the movement of traffic. A total of 2365 km. of gauge conversion is planned during the Tenth Plan period as against 2103 km. converted to broad gauge during the Ninth Plan period.

  29. Railway Line Annual Plan 2005-06 Plan outlay Rs 15,349 cr, consisting of Rs 7230.81 cr from General Exchequer (including Rs 2699 cr from SRSF and Rs 710.81 from Central Road Fund). Rs 4718.19 cr from internal resources Rs 3400 cr through market borrowings. In addition, Railways allowed access to extra budgetary resources to the extent of Rs. 3000 cr for financially viable schemes on a projectised basis. Thrust on throughput enhancement works, safety and development. Additional funds to the tune of Rs. 1365 cr for national projects in J&K/NE Region and Rs. 358 cr for RVNL works to be released during the course of the year. Appropriation to Development Fund raised significantly for making available adequate funds for throughput enhancement works including traffic facility works.

  30. Railway Line Projects Achievements of current year and targets for next year as below : Likely in 2004-05 Target for 2005 • Total BG lines to be added 1400 kms 1692 kms • New Lines 205 kms 219 kms. • Gauge Conversion 885 kms 935 kms. • Doubling 307 kms 538 kms. • Electrification 375 kms. 450 kms.

  31. Railway Line The company is capable of constructing railway siding work of any length including: 1. Detailing - Survey, drawing, design. - preparation of detailed project report with the estimation, - Approval from Railways - setting out. 2. Construction work - Formation includes Earthwork in excavation and embankment - Subgrade with Murrum blanketing - Mining, cursing, supplying and laying of Ballast, - Supply and laying of RCC Sleepers, Rails, turnouts,Pont and crossing, Track fittings and Fastening, track welding.

  32. Railway Line (Cont’d) - Signaling and telecommunication work • Preparation of drawing and design of overhead equipment and switching stations. • Fabrication, supply and erection of Traction mast/OHE, guy rod. - Supply and erection of overhead equipment • Supply and erection of contact wire, Catenary's wire, earth wire, copper cross feeder - Substation for transformers, - Railway station building and platforms, - Maintenance yard . - Loco shed, High mast , Overhead tanks,Pit line, - Level crossing

  33. Tunnels The company is capable of executing any type and any size tunnels used for roadway,railways and micro tunneling work. The work includes the following : - GPS survey, - Location of entry and exit point and ventilation shaft - Construction of Portals and Gabion structures - Cut & cover - Earthwork in excavation with conventional method of drilling and blasting & special technique inducting Road header technology. - Design of blasting pattern and selection of blasting material. - Drilling of Probe-holes - Design, fabrication and erection of steel supports - Design, Fabrication and fixing of rock bolts including drilling and fixing with resin and cement capsules.

  34. Tunnels (Cont’d) - Shotcreting (wet & dry) with Robotic arm by cement slurry using wire mesh, Fiber Reinforcement. - Interconnections - Tunnel lining with pre-cast RCC Lagging including - bolder packing - Supply and installation & commissioning of Tunnel Ventilation and Monitoring System, - Internal Electrical & Lighting Works, - Integrated on-line control systems, - Intelligent Gas and Ambiance Monitoring system. - Fire fighting arrangements and pipeline - Dewatering - Construction of Rigid pavement - Railing, Service ducks

  35. Flyovers The company is capable of executing the following work in this category Detailing - Survey, drawing, design.with site investigation, sub-soil exploration and testing of the geo-material. - preparation of detailed project report with the estimation, - Approval from Department - setting out. Construction work - Formation includes Earthwork in excavation and embankment - Subgrade with Murrum blanketing

  36. Flyovers (cont’d) Construction Flyover and viaducts of any length and any size with shallow and deep foundation like Raft, cast-in situ Concrete Driven & Bored piles ,sheet piles,under reamed piles, Well sinking Box caisson,open caissons, Heavy well, well sinking and coffer dam. The substructure including Construction of Hallow piers, solid piers and abutments using slip form shuttering with continues pouring at any height, Reinforced earth retaining structures with non woven geosynthetic and steel fiber.

  37. Railway Over Bridge/Under Bridge The company is capable of executing the following work in this category Detailing - Survey, drawing, design.with site investigation, sub-soil exploration and testing of the geo-material. - preparation of detailed project report with the estimation, - Approval from Railways - setting out. Construction of ROB/ RUB of any length and any size with shallow and deep foundation like Raft, cast-in situ Concrete Driven & Bored piles ,sheet piles,under reamed piles, Well sinking Box caisson,open caissons, Heavy well, well sinking and coffer dam.

  38. Railway Over Bridge/Under Bridge The substructure including Construction of Hallow piers, solid piers and abutments using slip form shuttering with continues pouring at any height, Reinforced earth retaining structures with non woven geosynthetic and steel fiber. Super structures including different types of pre-cast, pre-stressed, pre-tensioned and post tensioned cast-in situ type Girders namely box girder, I shape girder, Steel girder, Solid Deck Slab, Voided slab, RCC Crash barrier, railings. Supply and laying of RCC Sleepers, Rails, turnouts, Point and crossing, Track fittings and Fastening, track welding Also the company have the specialty in launching of girder of any size and length at any height.

  39. Mining Sector • An outlay of Rs. 9458 crore has been allocated for the Tenth Plan of which Rs 8187 crore is to be financed through IEBR and remaining Rs 1271 crore will be the gross budgetary support. TENTH PLAN STRATEGY : Tenth Plan objective of faster development of an internationally competitive mining sector must revolve around cost-effective mineral exploration and development with the state-of-the-art exploration technologies through promoting private investment in both mineral exploration and creating new mining capacities. The GSI and the State Directorates of Geology and Mining will have to continue working for the assessment and augmentation of mineral resources, particularly for the generation of basic geological data, understanding the process of ore genesis, regional surveys, specialised and focused geological studies, etc. including search for minerals in the off-shore areas, continental shelf and maritime zone. At the same time, private sector investment, including FDI, will have to be encouraged for detailed exploration.

  40. Mining Sector • Underground mining work for Coal, Manganese, Bauxite • Open Cast mining work for Coal, Manganese, Bauxite, Iron Ore • Turnkey construction of Long Drifts • Construction & Sinking of Deep Shafts Erection, Fabrication & Installation of Head gear • Equipping of Men & Material Handling Shafts on Turnkey Basis • Open cutting of Inclines & Over Burden Removal of Open cast Mines • Coal Transportation

  41. Environment Sector • The Ministry of Environment and Forests has set deadlines for cities to establish suitable waste processing, disposal and landfill facilities. Municipalities across the country are in the process of privatizing different aspects of solid waste management to reduce the cost incurred in providing these services and to improve the overall efficiency. Waste-to-energy projects have been initiated with different arrangements for setting up and operating these facilities involving the private sector and local bodies. • Private sector participation (PSP) in solid waste management offers several advantages, the first of which is cost saving, closely related to improvement in efficiency and effectiveness of services. PSP also encourages new technologies and reduces establishment costs. In India, the cities of Navi Mumbai, Hyderabad, Surat and Rajkot have experimented with PSP in various aspects of SWM with encouraging results (TCGI and PADCO, 2001).

  42. Environment Sector Common Effluent Treatment Plants (CETPs) Objectives: The Ministry has undertaken a Centrally Sponsored Scheme for enabling the small scale industries (SSI) to set-up Common Effluent Treatment Plants (CETP) in the country. The SSIs are polluting the environment through their effluents but some of them are unable to afford installation of pollution control equipment. In order to encourage use of new technologies for CETPs for existing SSI clusters of units a scheme for financial assistance has been formulated. This promotional scheme is being instituted and will be implemented during the Tenth Five Year Plan. Criteria for Consideration for Assistance i) CETPs in industrial estates or in a cluster of Small Scale Industrial units are encouraged. ii) Central Assistance will be available only for clusters of SSIs. iii) Projects for assistance will be prioritised on the basis of : • Toxicity of pollutants • Pollution load being generated and to be treated; and • Number of units covered

  43. Environment Sector iv) The CETPs are to be set up and managed by the State Industrial Infrastructure Corporation (by whatever name known) or through an appropriate institution including a cooperative body of the concerned units as may be decided by the State Governments/SPCBs concerned. v) The project should be self-supporting for repayment of the loan and meeting operation and maintenance costs. vi) The project must formulate adequate institutional arrangements for cost sharing, recovery of dues and management and ensure observance of prescribed standards. vii) The scheme must have the technical recommendation of the State Pollution Control Boards. viii)The CETP project should have the conveyance system from the individual units to the CETP.

  44. Environment Sector ix) Sludge characteristics (i.e. hazardous Vs. non-hazardous) from the primary and secondary treatment of the CETP should be estimated. Therefore, the CETP should have a sludge management plan which should be prepared based on the sludge characterisation and be documented in the feasibility report of the CETP project. x) Possibility of recycling/reusing the treated effluent from the CETPs by the member units should be explored and be documented in the feasibility report of the CETP project. xi) An environmental management and monitoring plan/programme to be prepared for the CETP and be documented in the feasibility report of the CETP project. xii) A legal agreement between the CETP Co. and its member units to be executed be reflected in the feasibility report of the CETP project. xiii) The cost recovery formula developed for the CETP project should be ratified by all members and be documented in the feasibility report of the CETP project.

  45. Environment Sector Modern technological development have multiplied the hazards to which human beings are exposed. The company is executing following types of projects : • Ash Pond • Common Effluent Treatment Plant (CETP) • Hazardous Waste Treatment & Sewage Disposal Facility (HWTSDF) • Bio Medical Waste

  46. Ash Ponds The company has successful track record of executing such non-overflow dams called as Earthen bunds or ash ponds. In this category the company executes following work: • Non Overflow section, Cut Of Trench, Earthwork in Hearting and Casing, • Rock toe, • Filter, Slope protection • Construction of Service Road

  47. Common Effluent Treatment Plant (CEPT) The company is capable of executing the construction of CETP including : • Design of conventional Biological Treatment Facilities and Industrial waste Treatment facilities. • Construction of - Bar Screens - Grit Chamber - Primary Sedimentation Tank - Secondary settling tank - Flocculator - Sludge drying bed - Filters - Supply and installation of pumps and Motors - Supply and laying of pipe lines

  48. Hazardous Waste Treatment & Sewage Disposal Facility(HWTSDF) The company is capable of executing the Develop,Construction, operation and maintenance of Hazardous Waste Treatment & Sewage Disposal Facility. The work undertaken is as the follows: - Establishment of the Hazardous Waste Treatment & Sewage Disposal Facility - Design & Construction of Land fill section with Leachate control system including the entry gate, time office ware house, pre treatment area, work shop, Laboratory Provision of storm water drains. - Creation and development of Green belt. - Supply and installation of Incinerator plant for burning of Hazardous Waste - Receiving and Transportation of hazardous waste from Generators facility to the HWTSDF

  49. Hazardous Waste Treatment & Sewage Disposal Facility(HWTSDF) (cont’d) - Carrying out segregation, Recovery, Treatment, Storage and Disposal including Land fill of hazardous waste residues. - Establishment and operation of a waste Heat recovery steam generation unit - Transportation of residue / rejects generated to Land fill area. - The whole system comprise of i) Collection of hazardous waste ii) Transportation of hazardous wastes

  50. Bio Medical Waste The company is capable of executing the Design, Finance, Construction, Operation and Maintenance of Biomedical Waste & its Treatment, Storage and Disposal facility plants. The work involves the following: • Construction of fencing and development of green belt • Actualisation and installation of weighing machine • Construction of building and workshops • Construction of internal roads. • Construction of disinfection room, • Supply and commissioning of Autoclaving, • Supply and commissioning of Shredding equipment. • Supply and commissioning of Incinerator • Construction of land fill section.

More Related