1 / 2

PFP Instrument Status

PFP Instrument Status. All PFP Instruments Except SWEA have been delivered, integrated, and tested including: IPTO Functional Self Test Transition SVT Science SVT Issues being worked: EUV alignment shims not flat. SEP temperature sensor noise Working to relocate temperature sensor

Download Presentation

PFP Instrument Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PFP Instrument Status All PFP Instruments Except SWEA have been delivered, integrated, and tested including: IPTO Functional Self Test Transition SVT Science SVT Issues being worked: EUV alignment shims not flat. SEP temperature sensor noise Working to relocate temperature sensor MAG temperature monitor offset Missing Time Update Counter Considering flight software fix SASM/LPW timing offset Unexpected phase difference measured Have not yet identified source; looking on spacecraft and instrument side

  2. SWEA Status SWEA has had high voltage discharges during thermal vacuum test, one of which damaged a preamp Thermal Vacuum diagnostics completed SWEA team is working with FRB to chart a path forward Repair the damage Inspect and bench test electronics for further diagnosis Determine how best to protect the system from future damage Reassemble, retest, requalify Deliver to spacecraft and integrate