FIELDS Instrument Risks Status

FIELDS Instrument Risks Status. 5. 4. PSM. F8. 3. PS. F9. Likelihood of Occurrence (probability). 2. P. P. P. P. P. F6. F1. F2. F5. F7. CS. P. P. CS. CS. F3. F13. F10. F12. F11. 1. 1. 2. 3. 4. 5. Consequence of Occurrence (Impact).

meira
Download Presentation

FIELDS Instrument Risks Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FIELDS Instrument Risks Status 5 4 PSM F8 3 PS F9 Likelihood of Occurrence (probability) 2 P P P P P F6 F1 F2 F5 F7 CS P P CS CS F3 F13 F10 F12 F11 1 1 2 3 4 5 Consequence of Occurrence (Impact) Mitigation Plans in Place for All FIELDS Risks

  2. FIELDS Phase B Risks Mitigation • FIELDS Risk Mitigation activities for Phase B include: • Antenna Qualification: • Nb materials testing, optical props aging (~Feb to Apr ‘12 TBR(was 3/12), MSFC or EMTL(was Odeillo, France)) • Antenna model thermal testing (~Oct ‘12 to Jan ‘13 (was 3/13), Odeillo, France) • Additional contingency test, if needed (~Oct ‘13, Odeillo, France) • SCM / MAG / FGM Trade: • Determine the optimal technical (dynamic range) & resource (mass and thermal) solution (close by 4/12) • See Trades Slide for additional information. • MAG Performance Over Temperature: • MAG Cold Operations Test (~1/13) • MAG Thermal Cycling Test (end of Phase B) • MAG/SCM Interference: • MAG/SCM Interference test (similar to the MAG/FGM test performed in 7/11) (~5/12 TBR (was 4/13), Chambon, France) • Blue = change since MDR

  3. Backup

  4. F1-P:Risk Burn Down A 25 20 Risk Grade 15 B 10 5 C Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion

  5. F2-P: Risk Burn Down 25 20 Risk Grade 15 10 5 A Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion

  6. F3-CS: Risk Burn Down A 25 20 Risk Grade 15 B 10 5 C D E Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion

  7. F5-P: Risk Burn Down 25 20 Risk Grade 15 C 10 5 AB D Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion

  8. F6-P: Risk Burn Down A 25 B 20 Risk Grade 15 10 5 Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion

  9. F7-P: Risk Burn Down A 25 B 20 Risk Grade 15 C 10 5 Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion

  10. F8-PSM: Risk Burn Down A 25 20 Risk Grade 15 10 5 Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion

  11. F9-FS: Risk Burn Down A 25 B 20 Risk Grade 15 10 5 Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion

  12. F10-PS: Risk Burn Down A 25 B 20 Risk Grade 15 C 10 5 Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion

  13. F11-S: Risk Burn Down A 25 B 20 Risk Grade 15 C 10 5 D Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion

  14. F12-P: Risk Burn Down A 25 B 20 Risk Grade 15 C 10 5 D Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion

  15. F13-P: Risk Burn Down A 25 20 Risk Grade 15 10 5 Plan Actual * Grade = Likelihood x Consequence ** Assessment is the remaining risk assessed after successful event completion