An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IntelliDrive for Safety, Mobility, and User Fee Project Cory Johnson Mn/DOT IntelliDrive Program Engineer

  2. The Issue • US and State Department of Transportations (DOT’s) are concerned about their funding. • Not only a Minnesota issue • Not only a DOT issue

  3. But Why are we Concerned? • Decreasing fuel consumption for same or increasing VMT • Increasing fuel efficiency standards • Alternative fuels • Erosion of buying power • Cost of construction increases • Project scopes have multiple mode considerations and requirements • Gas Tax increases are not common • Highway Fund balances have not been keeping pace and require fund transfers

  4. Mn/DOT’s History with the MBUF • 1997 - Minnesota Road Pricing Study • 2003 - A New Approach to Assessing Road User Charges • 2007 - Mileage-Based User Fee Demonstration Legislation • 2009 – Legislative Report examining DOT funding alternatives

  5. Program Vision

  6. Program Approach • Leverage existing off the shelf products and their consumers / public • Utilize commercially available communications • Integrate new functions on single existing mobile platform • Address MBUF specific concerns • Privacy • Equity • Enforcement and Evasion • Administration Costs

  7. Program Progress • Project Planning • Market research • Risk analysis • Phase 1 Scoping • Concept of Operations • High Level Requirements • Preliminary Evaluation Plan • Phase 2 Implementation • Design and Build (finish July 2011) • Field Test (July 2011 - July 2012) • Outreach (finish July 2012) • Evaluation (finish Dec 2012) • Close (finish Dec 2012)

  8. Our System Design Concept

  9. Rates based on zones Monthly Billing and Payment Enforce at Time of Vehicle Registration MBUF Requirements • Current Rate

  10. Travel Time Collection • Drivers choose to transmit travel times • Individual settings to allow for privacy concerns to be addressed • Device transmits travel times without interaction during trip as allowed • All trip data is collected at one point

  11. In-Vehicle Signage Application • Proposing two types of signage notification

  12. Document implementation experience Assess technical performance Assess customer satisfaction Investigate safety impacts Investigate mobility impacts Assess potential and feasibility Evaluation Goals

  13. Questions or Comments Project Website http://www.dot.state.mn.us/guidestar/2006_2010/intellidrive.html