An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IntelliDriveSMVehicle to Infrastructure Connectivity for Safety Applications • Monique Evans • Director, FHWA Office of Safety RD&T • U.S. Department of Transportation • IntelliDrive Safety Workshop • Chicago, IL • July 20 - 22, 2010 • IntelliDrive is a service mark of the U.S. Department of Transportation

  2. CY 2013 CY 2014 CY 2011 CY 2012 CY 2010 1Q 1Q 1Q 1Q 1Q 2Q 2Q 2Q 2Q 2Q 3Q 3Q 3Q 3Q 3Q 4Q 4Q 4Q 4Q 4Q V2I Safety Applications Roadmap – Draft July 12, 2010 CY 2009 3Q 1Q 2Q 4Q Track 1 Applications Analysis Phase 1 SLTA Phase 2 SLTA CICAS-SLTA Go/No Go Decision Crash Factors Migration Transit Analysis Analyses for Future Applications Smart Roadside Analysis Analysis & Selection of Initial Applications Initial Applications Selection Final Applications Selection Track 2 Prototype Development Smart Roadside ConOps & Apps Prototype Transit ConOps FOT Selections Safety ConOps Prototype Applications Requirements Review ConOps Review Track 3 Infrastructure Communications & Interoperability SPaT Prototype Test and Evaluation SPaT I/F Review SPaT I/F Definition Final SPAT Interface Definition & Policy Guidance RG&I Trade Study Mapping Prototype Integrated V2I Infrastructure System Positioning Prototype CommsTS CommsReqs V2I Security Reqs Application Cert Reqs Track 4 Benefits Assessment FOT(s) & Simulation Analysis Mode Specific Deployment Recommendations FOT Buildup/Simulation Plans Multi-modal FOT(s)/Simulations Benefit & Risk Analysis Initial Infrastructure Assessment Infrastructure Assessment Update Track 5 Deployment Planning Infrastructure Study/Footprint Analysis IntelliDrive Principles Defined Define Public Agency Reqs Public Agency Guidelines and Specifications (“toolbox”) V2I Roadmap Review Toolbox Review Stakeholder Engagement Opportunities Major Milestones

  3. CY 2010 CY 2014 CY 2013 CY 2011 CY 2012 1Q 1Q 1Q 1Q 1Q 2Q 2Q 2Q 2Q 2Q 3Q 3Q 3Q 3Q 3Q 4Q 4Q 4Q 4Q 4Q V2I Safety Applications Roadmap – Draft July 12, 2010 CY 2009 3Q 1Q 2Q 4Q Track 1 Applications Analysis Phase 1 SLTA Phase 2 SLTA CICAS-SLTA Go/No Go Decision Crash Factors Migration Transit Analysis Analyses for Future Applications Smart Roadside Analysis Analysis & Selection of Initial Applications Initial Applications Selection Final Applications Selection • TRACK 1 – Applications Analyses • Key objective: Determine high value safety applications for initial V2I safety deployment. • Major outputs: A set of applications that will be further developed in Track 2. • Items to be covered: • Status of CICAS-SLTA • Multimodal Applications Analyses • Selection of Safety V2I Applications

  4. CY 2010 CY 2013 CY 2011 CY 2012 CY 2014 1Q 1Q 1Q 1Q 1Q 2Q 2Q 2Q 2Q 2Q 3Q 3Q 3Q 3Q 3Q 4Q 4Q 4Q 4Q 4Q V2I Safety Applications Roadmap – Draft July 12, 2010 CY 2009 3Q 1Q 2Q 4Q Track 2 Prototype Development Smart Roadside ConOps & Apps Prototype Transit ConOps FOT Selections Safety ConOps Prototype Applications ConOps Review Requirements Review • TRACK 2 – Prototype Development • Key objective: Develop and validate prototypes of high value cooperative safety applications that will be field tested in Track 4. • Major outputs: Prototype applications ready for integration with infrastructure components and the vehicle components. • Items to be covered: • Multimodal Concepts of Operations • Development of Prototype Applications

  5. CY 2010 CY 2014 CY 2011 CY 2013 CY 2012 1Q 1Q 1Q 1Q 1Q 2Q 2Q 2Q 2Q 2Q 3Q 3Q 3Q 3Q 3Q 4Q 4Q 4Q 4Q 4Q V2I Safety Applications Roadmap – Draft July 12, 2010 CY 2009 3Q 1Q 2Q 4Q Track 3 Infrastructure Communications & Interoperability SPaT Prototype Test and Evaluation SPaT I/F Review SPaT I/F Definition Final SPAT Interface Definition & Policy Guidance RG&I Trade Study Mapping Prototype Integrated V2I Infrastructure System Positioning Prototype CommsTS CommsReqs V2I Security Reqs Application Cert Reqs • TRACK 3 – Infrastructure Communications & Interoperability • Key objective: Provide the critical technology underpinnings that allow safety applications to be deployed nationally. • Major outputs: Integrated V2I Infrastructure System needed for exchange of useful data and information. • Items to be covered: • Definition of SPaT Interface and Policy Guidance • Infrastructure Systems Interoperability and Communications • Integrated V2I Infrastructure System (Reference Implementation) • Applications Certification Requirements

  6. CY 2014 CY 2010 CY 2013 CY 2011 CY 2012 1Q 1Q 1Q 1Q 1Q 2Q 2Q 2Q 2Q 2Q 3Q 3Q 3Q 3Q 3Q 4Q 4Q 4Q 4Q 4Q V2I Safety Applications Roadmap – Draft July 12, 2010 CY 2009 3Q 1Q 2Q 4Q Track 4 Benefits Assessment FOT(s) & Simulation Analysis Mode Specific Deployment Recommendations FOT Buildup/Simulation Plans Multi-modal FOT(s)/Simulations Benefit & Risk Analysis • TRACK 4 – Benefits Assessments • Key objective: Conduct field operational tests and simulations. • Major outputs: Reports covering cost-benefit analyses and the associated potential risks for deployment of V2I safety applications. • Items to be covered: • Prototype Application Evaluations • Benefit & Risk Analyses

  7. CY 2010 CY 2013 CY 2012 CY 2011 CY 2014 1Q 1Q 1Q 1Q 1Q 2Q 2Q 2Q 2Q 2Q 3Q 3Q 3Q 3Q 3Q 4Q 4Q 4Q 4Q 4Q V2I Safety Applications Roadmap – Draft July 12, 2010 CY 2009 3Q 1Q 2Q 4Q Track 5 Deployment Planning Initial Infrastructure Assessment Infrastructure Assessment Update Infrastructure Study/Footprint Analysis IntelliDrive Principles Defined Define Public Agency Reqs Public Agency Guidelines and Specifications (“toolbox”) V2I Roadmap Review Toolbox Review • TRACK 5 – Deployment Planning • Key objective:Develop tools and guidelines that will aid practitioners in making sound decisions on how to plan, deploy, operate, and maintain V2I systems. • Major outputs: Public Agency Guidelines and Specifications (“Toolbox”) • Items to be covered: • Infrastructure Study / Footprint Analysis • Definition of Public Agency Requirements • Development of Public Agency Guidelines and Specifications – Toolbox

  8. Breakout Questions Are the research activities adequate to achieve out objective in this track? Do you foresee any technical issues that may pose a challenge in order to get the work done? Do you foresee any policy issues that may pose a challenge in order to get the work done?