SMT Conversion Cost (2013.04)

SMT Conversion Cost (2013.04). 單位:每分鐘 台幣元. 4 月 Cost 增加主要是因為 4 月周六、周日全部加班 , 其次雜項購置超出預算 ( 新增生產線旁鋼網架及二維條碼槍. 2013 年 04 月塘廈 SMT 中心 Conversion Cost. 單位:每分鐘 台幣元. Note : 1. Conversion Cost 計算方式: ( 直工 + 製費 + 管理費用 PRC+ 材料附加費用 ) / 產出標準工時 ( 廠內 )

oleg-beck
Download Presentation

SMT Conversion Cost (2013.04)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SMT Conversion Cost(2013.04) 單位:每分鐘 台幣元 4月Cost增加主要是因為4月周六、周日全部加班, 其次雜項購置超出預算(新增生產線旁鋼網架及二維條碼槍.

  2. 2013年 04月塘廈SMT中心Conversion Cost 單位:每分鐘 台幣元 Note:1. Conversion Cost計算方式:(直工+製費+管理費用PRC+材料附加費用) / 產出標準工時(廠內) 2. Conversion Cost是公司內部績效衡量指標(ex:總效率),與公司帳務的成本結算無直接相連結, 請勿以Conversion Cost的工費率作為報價或任何成本計算的工具 3.Conversion Cost計算方式的分子不含外包費用 4.部分品保單位2012年起改列製造費用,2011年度屬於製造的品保費用已比照2012年作相應調整

  3. 2013年 04月SMT作業價格&百點成本 A B C D E Note:1.SMT作業價格(D)計算方式:SMT費用 / 機器分鐘數 = A / B * 10000 2.SMT百點成本(E)計算方式:SMT費用 / SMT 點數 = A / C *100 3.作業價格是SAP系統用來計算成本的工費率 4.百點成本是公司內部績效衡量指標 5.以上費用不含外包費用