An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PIP Update Nov 7 2012

  2. Agenda • Summary Update • Current Activities Updates/Talks: Elmie and Ken: RLS – Updates – Budget Summary

  3. Update • Current Work • Booster RF cavity rework RF6 in test stand being tested….. • Cavity 1017 was mechanically finished on 10/29. Vacuum pump issues were resolved on 10/31 • Tuner Work: Three tuners waiting to be assembled once we have cones • Building 12 cone assemblies – since none available. Goal is to complete these next week. • Cavity 1013 build: (Mike May ), center is scheduled to be in the machine shop before Thanksgiving. • SS PA Work: Not much has changed - will have the copper cooling rings for the tube sockets this week (the machine was very busy.)? • Water Manifolds are presently being constructed by Larsen MFG in Mundelein, IL. Possibly finished by late next week. • SS Install: The modified 'taller' SSD rack was finished and brought over to station 9 in the East Booster Gallery. • Modulator Work: First 10 completed/Tested,Next twelve - two are 100% (1/week) • LCW: Booster LCW return pump work is complete. • Some Booster enclosure LCW work is ongoing; Long 3 hose replacement, EDWA magnet hook-ups, minor leaks, may try to install some more strainers and valves. • PreAcc LCW work is ongoing; RFQ and Solenoid magnet LCW is complete, PSQA doublet magnet LCW in progress • MCC – moved to lower gallery and is in the process of being connected!!! • RFQ: Entire Line Connected, Surveyed and Under vacuum!! Connections/Conditioning • Schedule -> Finish Safety Testing this week, Beam permit signoffs next week …. • HPower RF : ODDONE had signed the 1.4Mrequisition  Well Not Any More – Put back on Hold (NOVA) • Booster Absorber – Blocks Installed, Drawings approved - • Linac Modulator –SLAC requisition placed to continue work. • Cogging – Software work continues • Booster Shielding – Safety did tunnel tour – will have a update end of month Shutdown - comments (Fernanda, Todd, Mary) Fiscal Year – There is still some FY12 –> FY13 funding discussions occurring – Today Talk has more information…..

  4. So far on schedule – or a little ahead but will like to have extra time for working on sources, efficiency an measurements.

  5. Upcoming • RLS – Finishing updates • Fiscal Year Start – • Labor requests – mostly worked out • M&S – still depends upon 2nd floor decision but have tasks that ready to go/continue • Reports – none at this time • Meetings: • Roger regular PIP – yesterday • Talked about fiscal (labor) concerns for both AD and PIP • Meet with Ann again (Nov 14?)

  6. Talks • Elmie Peoples / Ken Domann - Project Status Updates