1 / 3

CNGS Radiation Test Campaign 2009 – TE-MPE-CP phase 1

CNGS Radiation Test Campaign 2009 – TE-MPE-CP phase 1. Equipment under test Field-bus coupler type DQAMGS (new QPS layer) Latest MicroFip TM version Field-bus coupler type DQAMS600 (600 A EE systems, QPS remote reset units) Old MicroFip TM version

noura
Download Presentation

CNGS Radiation Test Campaign 2009 – TE-MPE-CP phase 1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CNGS Radiation Test Campaign 2009 – TE-MPE-CP phase 1 • Equipment under test • Field-bus coupler type DQAMGS (new QPS layer) • Latest MicroFipTM version • Field-bus coupler type DQAMS600 (600 A EE systems, QPS remote reset units) • Old MicroFipTM version • Used as well for test controls and DAQ for TE-MSC-SCD test • Bus-bar protection system type DQQBS (new QPS layer) • High precision systems based on device already tested last year on CGNS • Micro-converters, DC-DC converters, amplifiers etc. • Verification of firmware (error correction code), drifts etc. • Power pack prototype unit • LDO regulators (also tested @ PSI), rectifier bridges

  2. CNGS Radiation Test Campaign 2009 – TE-MPE-CP phase 1 mV ncm-2 • Preliminary results • Irradiation position TSG46 – low flux (~ 7 x 109 ncm-2) • Latest MicroFipTMversion: device got stuck twice • 1st event: 29.04.2009 == no radiation, 2nd event 14.06.2009 • After power cycle the device re-started and worked correctly • Bus-bar protection system • Drift of input stage offset voltage observed (as during last year’s tests with similar devices) • Detailed analysis still to be done • No problem for operation as device will be re-calibrated on a regular basis • All other systems working correctly

  3. CNGS Radiation Test Campaign 2009 – TE-MPE-CP phase 1 • Next steps (changes implemented during yesterday’s access) • Bus-bar protection system type DQQBS added • Firmware update of field-bus coupler type DQAMGS and other DQQBS system • Equipment moved into zone with higher flux • System successfully re-started and working correctly • Further steps planned • Installation of DQQDS type circuit boards (aperture symmetric quench detection) • Further evolution of firmware depending on results

More Related