An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Results from PrototypeCO2 Cooling Gas System TRT Meeting 20/02/2002

  2. Outline • Motivation • Layout • Component • Start / Stop procedures and problems • Conclusions TRT Meeting 20/02/2002

  3. Motivation • Investigate pressure regulation on a small volume with extremely high flow • To establish Start / Stop procedures with the aim to stay <  2 mbar. • Main components functional tests. (valves, Turbines). • Simulate missing elements, like volumes, manifolds, lengths and diameters of pipes. TRT Meeting 20/02/2002

  4. Components • Turbine RIETSCHLE SKG 226 • Control valves 6.3 and 40 KVs • Flow meter DELTAFLOW. 100 m3 • Differential pressure flow meter p  4mbar @ 100 m3/h CO2 • Sensors 0/50 mbar, 0/-100 mbar, ± 10 mbar • Back-pressure regulator • Buffer Volume of  100 l was added (see T.D.R) • Two test volumes, 400 and 57 litres were tested. TRT Meeting 20/02/2002

  5. How to start up ? • Manual valve (by-pass) • Difficult to operate, bad stability • Frequency controller • Ramping the turbine between 80 to 100 steps to full power (25 min) • Resulted in smooth increase of flow with good regulation in the test volume • PID parameters • For booth regulation systems (PID1, PID2) were optimised • Back pressure regulator • With the back pressure regulator (BP1) the input pressure of the test volume was increased and with that the main flow through it. TRT Meeting 20/02/2002

  6. Starting up (Manual valve) TRT Meeting 20/02/2002

  7. Starting up (Frequency controller) TRT Meeting 20/02/2002

  8. Pressure and flow TRT Meeting 20/02/2002

  9. Buffer pressure p3 TRT Meeting 20/02/2002

  10. Shutting down procedure • No EV4, 5, 6. • Turn off pump resulted pressurising the test volume to > 10 mbar. • Close at same time EV5, 6 + open EV4 • Separate high pressure part from test volume and open valve 4 to exhaust, in order to equalise inside and outside pressure • Standard safety back-up. • Safest way to switch off resembles a power cut. • A slow ramp down of the flow resulted always in overpressures due to the high pressure in the buffer volume TRT Meeting 20/02/2002

  11. Shutting down procedure TRT Meeting 20/02/2002

  12. Conclusion • CO2 Cooling gas system will be very difficult to operate! • Buffer volume is absolutely needed for disentangling pressure control around the pump unit and around detector-wheels. • Pneumatic shut off separation valves (4, 5, 6) need to be fast (< 200 msec) in order to provide adequate detector safety. • Flow increase of about 20% should be possible by increasing the input pressure of the 6 wheels (without changing the setting of the wheels). • We feel, a second prototype with final component (as far as possible) is needed! TRT Meeting 20/02/2002