150 likes | 291 Views
Aviv Rosenberg Ben-Ami Zilber Supervisor: Boaz Mizrachi (Zoran) . Portable Control & Measurement Device D0727. End of Part A Presentation 12/2008. Possibility of customization and extension of feature-set in HW & SW Possibility to assemble several versions of the device
E N D
Aviv Rosenberg Ben-Ami Zilber Supervisor: Boaz Mizrachi (Zoran) Portable Control & Measurement DeviceD0727 End of Part A Presentation12/2008
Possibility of customization and extension of feature-set in HW & SW Possibility to assemble several versions of the device Friendly interface (Cell-Phone like keyboard, LCD Display) Portable and hand-held with internal rechargeable battery Support for USB and microSD card for data transfer Overview (Reminder...) A versatile, multi-purposed, portable and low-priced measurement device that can instantly measure and display results, or store data for later re-evaluation. The device will be easy to use and will allow some degree of monitoring and control over its environment using various measurements. In addition,
So Far... • Preliminary design and characterization. • Found necessary HW for all features. • Detailed mechanical design in a 6.1x10x2.5cm box, with 3D model ensuring all HW can fit in such a small device. • Electrical design for all possible hardware. • (in progress) Layout.
Mechanical Design The device with closed top. Visible: Graphic LCD, Keypad, IRt/c, UV Sensor.
Mechanical Design The device with open top. Visible: Graphic LCD, Keypad and Main PCB, USB Port.
Mechanical Design The device with open top, LCD and Keypad removed. Visible: Main PCB, most sensors and components.
Electrical Design Functional Block Diagram:
Electrical Design Example Schematic: Accelerometer
Electrical Design Example Simulation: Pressure Sensor
Layout Suggested main PCB layout: Top
Layout Suggested main PCB layout: Bottom
Layout Actual main PCB layout: Top
Layout Actual main PCB layout: Bottom
To Do... • Finish PCB layout (mid of December) • Send to production (January) • Start basic SW while in production (~1 Month) • End of production (before end of January) • HW Test and Debug (1-2 Months) • More SW (all remaining time)