slide1 l.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Presentation Contents Company structure The Sevan technology FPSO Sevan Piranema FPSO Sevan Hummingbird FPSO Sevan PowerPoint Presentation
Download Presentation
Presentation Contents Company structure The Sevan technology FPSO Sevan Piranema FPSO Sevan Hummingbird FPSO Sevan

Loading in 2 Seconds...

play fullscreen
1 / 14

Presentation Contents Company structure The Sevan technology FPSO Sevan Piranema FPSO Sevan Hummingbird FPSO Sevan - PowerPoint PPT Presentation


  • 293 Views
  • Uploaded on

Presentation Contents Company structure The Sevan technology FPSO Sevan Piranema FPSO Sevan Hummingbird FPSO Sevan Voyageur FPSO for ENI Goliat field Sevan Driller No 1 FLNG GTW (Gas To Wire) Sevan bridge linked WHPIce Hull Sevan Ice Hull. Company structure. Sevan Marine ASA.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Presentation Contents Company structure The Sevan technology FPSO Sevan Piranema FPSO Sevan Hummingbird FPSO Sevan' - myron


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

Presentation Contents

  • Company structure
  • The Sevantechnology
  • FPSO SevanPiranema
  • FPSO SevanHummingbird
  • FPSO SevanVoyageur
  • FPSO for ENI Goliat field
  • Sevan Driller No 1
  • FLNG
  • GTW (Gas To Wire)
  • Sevanbridge linkedWHPIceHull
  • SevanIce Hull
slide2

Company structure

Sevan Marine ASA

100%

100%

100%

100%

Kanfa AS

Sevan Drilling

Sevan Marine

do Brasil Ltda

Sevan Pte Ltd

Singapore

Sevan

Production AS

100%

Sevan Production

Services Pte Ltd

Kanfa

TEC

Kanfa Aragon

80%

Mator

Sevan TBN Pte Ltd.

100%

Sevan TBN Pte Ltd.

100%

slide3

FPSO

Floating

Production

Storage

Offloading

GTW

Gas

To

Wire

(Offshore powerplant)

MODU

Mobile

Offshore

Drilling

Unit

FDPSO

Floating

Drilling

Production

Storage

Offloading

MSV

Multipurpose

Support

Vessel

FAU

Floating

Accomodation

Unit

The SevanPlatform

- the versatile ttechnology-

FLNG

Floating

Liquefied

Natural

Gas production

slide4

Field operator: Petrobras

Contract type: Build own and operate

FPSO operator: Sevan Marine

Location: Offshore Aracaju

Water depth: 1000m

  • Oil processing: 30 000 bod
  • Gas processing/ injection: 3.6 mill Sm3/day - 130 mill scfd @ 280 bar

FPSO Sevan Piranema

In operation since October 2007

slide5

Field operator: Venture Production

  • Contract type: Build own and operate

FPSO operator: Sevan Marine

Location: UK Central North Sea

Water depth: 120m

Hull size: Sevan300

  • Oil processing: 20 000 bod
  • Water injection: 20 000 bwd
  • Liquid combined: 30 000 bld
  • Retrofit of gas compression studied for future field.

FPSO Sevan Hummingbird

In production since September 2008 at

Venture Production Operated Chestnut field

UK CNS

slide6

FPSO Sevan Voyageur at the Premier Oil operated Shelley field

First offloading September 2009

Field operator: Premier Oil

  • Contract type: Build own and operate

FPSO operator: Sevan Marine

Location: UK Central North Sea

Water depth: 120m

Hull size: Sevan300

  • Oil processing: 20 000 bod
  • Water injection: 20 000 bwd
  • Liquid combined: 30 000 bld
  • Power for two ESPs
  • Retrofit of gas compression studied for future field.
slide7

FPSO Sevan 1000 for the ENI operated Goliat Field

Field operator: ENI Norge

  • Contract type: Technology licensing

FPSO owner: Goliat license

Location: Norwegian Barents Sea

Water depth: 400m

Hull size: Sevan1000

  • Total liquid processing: 110 000 bbl/day
  • Oil stabilization and desalination 110 000 bbl/day
  • Produced water re-injection: 75 000 bbl/day
  • Sea water injection: 125 000 bbl/day
  • Rich wet gas processing: 140 MM Scfd
  • Power from shore: 60 MW (HVAC)
winterization
Winterization

Protectionof personell (and equipment)

againstwind, lowtemperatures, rain, sleat,

hail, snow and icing

Areas not exposed to hydrocarbonswill be

100% enclosed.

Process areas will have weathertight

roof and perforatedwalls to ensure

ventilation

Large benfits to workingenvironment;

weatherprotection, heatedwork areas

and safer material handling

slide9

Sevan Driller No:1

Naming ceremony COSCO yard,

Qidong, China

August 2009

Contracted by Petrobras

Sevan Driller No:2 contracted by ONGC

Sevan Driller No:3 contracted by Petrobras

slide10

FLNG application

  • Simplified tank system
  • More deck space for process and liquefaction system
  • No requirement for swiveling of cooling water

LPG/LNG Tank

Hold Space

LNG Tanks

Chain Lockers

Condensate Tanks

Ballast Tanks

LNG storage (6 tanks): 180 000 m3

LPG storage (1 tank): 30 000 m3

Condensate storage (6 tanks): 28 000 m3

Ballast tanks (24 tanks): 87 000 m3

slide11

Floating powerplant applications

Onboard Co2 capture and compression plant feasible

elevations
Elevations

FPSO with dry tree completions

Bridge-link to wellhead platform at moderate waterdepths