1 / 18

Project Xxx

Project Xxx. PDR. Project X Core Team. Decisions requested Technical Preparation Final System Architecture H/W detailed definition S/W detailed definition ASIC detailed definition Design issues R&D tests. Manufacturing Materials Service Product cost and GM Workplan

murch
Download Presentation

Project Xxx

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Xxx PDR Project X Core Team Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  2. Decisions requested Technical Preparation Final System Architecture H/W detailed definition S/W detailed definition ASIC detailed definition Design issues R&D tests Manufacturing Materials Service Product cost and GM Workplan Risk and risk management Decisions requested Agenda Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  3. Decisions requested • Outline here the decisions which are requested at the end of this PDR meeting Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  4. SystemArchitecture • Present here the final system architecture • Block diagrams • Split between H/W and S/W • Interfaces • Dataflows • Outline major differences with the initial architecture presented and agreed to at HDR • Note 1: Even if the final architecture is the same as what was presented in HDR, it is useful to remind the audience about the technical frame of the project • Note 2: several slides might be needed Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  5. H/W detailed definition • Outline here the key elements/characteristics of the H/W detailed definition • High-level H/W design plans (including diagnostic concept) • Choice of components (technology, type, characteristics, cost, availability) • Mechanical top level constraints • H/W requirements in terms of S/W support for H/W • Note 1: those elements should be reviewed in detail ahead of time in a separate H/W DR before PDR • Note 2: several slides might be needed Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  6. S/W detailed definition • Outline here the key elements/characteristics of the S/W detailed definition • S/W architecture (including specific H/W requirements) • Implementation trade-offs • Algorithms • Note 1: those elements should be reviewed in detail ahead of time in a separate S/W DR before PDR • Note 2: several slides might be needed Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  7. ASIC detailed definition • Outline here the key elements/characteristics of the ASIC detailed definition • General ASIC architecture • Block diagrams • Dataflow architecture • Algorithms • Outline ASIC verification plans • Including tools requirements • Note 1: those elements should be reviewed in detail ahead of time in a separate ASIC DR before PDR • Note 2: several slides might be needed Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  8. Design issues • Outline here any deviation from product specs / marketing requirements as presented at HDR • Outline any other technical issues Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  9. R&D tests • Outline the final R&D test plans • Including resources and tools requirements • Outline the initial Unit / Integration Test programs • Including # of cycles for H/W • Including test tools and equipment list • Outline the initial Engineering Test programs Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  10. Manufacturing • Outline progress in preparing Manufacturing Process • Flow chart of Manufacturing processes defined • New technologies & trade-offs identified • Complexity and volume analysis performed • DFM at block diagram level performed • Initial build plans ready • Release profile, # of builds, # of units / build • Outline progress in preparing Manufacturing Tests • Manufacturing test plans updated • Including resource allocation • DFT at block diagram level performed • Test equipment requirements identified Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  11. Materials • Outline key progress/issues related to materials • Updated BOM reviewed by commodity group / component engineers • Analysis of component risk / lead-time / cost performed • BOM coverage vs qualified suppliers assessed • Including short lists of potential vendors for non-covered components • Including plans (timing) for new vendor qualification (if needed) Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  12. Service • Demonstrate that H/W and S/W design plans take into account all major service requirements • Outline any service requirement which will not be met Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  13. Product cost and GM • Provide up-to-date product cost and GM estimates • Based on updated design • Using the refined BOM • Using the latest information from contract manufacturer and key component suppliers • Outline any significant deviation from estimate presented at Planning & Specification stage Review (if any) Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  14. Workplan • Present detailed technical plans for the Detailed Design Stage • Including next provisional dates for H/W and S/W DRs before CDR • Including CDR date • Make sure the plans presented here are achievable with at least 90% confidence • Outline any resource issues • Availability • New technical skills required (if any) Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  15. Risk and risk management • Outline here the major technical risks for the project and the way the project team intends to manage them Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  16. Decisions requested • Outline here the decisions which are requested at the end of this PDR meeting Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  17. Back-up slides Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

More Related