slide1 n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Michael S. Zachowski, Robert D. Walla Astrix Technology Group 1090 King Georges Post Rd PowerPoint Presentation
Download Presentation
Michael S. Zachowski, Robert D. Walla Astrix Technology Group 1090 King Georges Post Rd

Loading in 2 Seconds...

play fullscreen
1 / 26

Michael S. Zachowski, Robert D. Walla Astrix Technology Group 1090 King Georges Post Rd - PowerPoint PPT Presentation


  • 84 Views
  • Uploaded on

A Successful Approach to a LIMS Upgrade In A Public Wastewater Utility Laboratory. Michael S. Zachowski, Robert D. Walla Astrix Technology Group 1090 King Georges Post Rd Edison, NJ 08837. Abstract.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Michael S. Zachowski, Robert D. Walla Astrix Technology Group 1090 King Georges Post Rd' - munin


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

A Successful Approach to a LIMS Upgrade In A Public Wastewater Utility Laboratory

Michael S. Zachowski, Robert D. Walla

Astrix Technology Group

1090 King Georges Post Rd

Edison, NJ 08837

slide2

Abstract

Undertaking a Laboratory Information Management System (LIMS) upgrade takes considerable resources that are often underestimated by the client. In addition to the obvious license and support costs, most commercial off the shelf (COTS) products will require customization and/or configuration to meet a client’s specific requirements and work flows. If these are not documented and compared to the base functionality of the COTS LIMS prior to the installation, it is unlikely that adequate resources will be allocated and the project will fall short of its objectives.

slide3

Abstract

This paper will present a case study of a LIMS assessment and upgrade in a public sector wastewater utility laboratory network. The client had an existing COTS LIMS that was no longer supported by the manufacturer and did not meet the ever-increasing needs of the user. In order to successfully upgrade to a new COTS LIMS product, requirements (functional, technical, business) were collected, segmented and prioritized. Use case scenarios were created and incorporated with the requirements into a system specification. The specification will be provided to pre-qualified potential COTS LIMS vendors via a Request for Proposal. After short listing, vendors will be required to perform an onsite demonstration using Astrix supplied demonstration scripts. This approach will provide the client with a better assurance that the selected product will meet the organizational requirements as defined in the system specification.

slide4

Utility LIMS Upgrade

Project Objectives

  • Purchase Of a COTS LIMS
  • Implement At Multiple Locations
  • Integration Of Analytical Instruments
  • Interface With Existing Data Systems
slide5

Stakeholder Groups

  • Laboratory Stakeholders
    • Sample Receiving
    • Sample Preparation
    • Organic Analysis
    • Metals
    • Wet Chemistry
    • Process Control
    • Biology
    • Microbiology
    • Research Group
slide6

Stakeholder Groups

  • Non-Laboratory Stakeholders
    • Quality Assurance
    • Information Technology
    • Plant Operations
    • Ocean Assessment Group
    • Sampling Group
    • Lab Management
    • Regulatory Reporting
    • Industrial Waste
    • Monitoring Group
slide7

Existing Utility System

  • Plant Operations Database
  • Toxicity Database
  • Industrial Waste Pretreatment Information Management System (PIMS)
  • Enterprise Reporting System
slide8

“Implementing An Information Management System In A Laboratory Is Like Changing The Tires On A Car Traveling 100 mph”

  • Author Unknown
slide9

LIMS Risk Components

  • 60% of IT Projects Are Cancelled Prior To Implementation
  • Many Systems Never Get Implemented Due To Functional, Time and Budget Constraints
  • Customization And Integration Requirements Underestimated
  • Unrealistic Schedule And Budget Estimates
  • Risk Management Plan Not Well Established
  • No Formal Process In Place to Select and Implement LIMS
slide10

Astrix Technology Process Approach

  • Business Case Preparation
  • Collect and Organize User Requirements
  • Development of Functional Specification
  • Request For Proposal
  • Evaluation of Vendor Responses (GAP Analysis)
  • Configuration/Customization/Integration
  • Validation And Testing
  • Life Cycle Planning and Maintenance
slide11

Requirements Analysis

  • Onsite Requirements Meetings
  • Include All Stakeholder Groups
  • User Focus Groups
  • Story Boarding
slide12

Requirements Analysis

  • Collect Detailed User Requirements
  • Iterative Process
  • Segment and Prioritize
    • Priority 1 – Critical To Work Process
    • Priority 2 – Improves Work Process
    • Priority 3 – Nice To Have
  • Decompose To Level 2-3
slide13

Requirement Types

  • Functional Requirements
  • Technical Requirements
  • Security Requirements
  • Regulatory Requirements
  • Business Requirements
slide14

System Specifications

  • Description Of Processes and Procedures
  • System Requirements
  • Process Flow Diagrams
  • Suggested Workflow Changes (if applicable)
  • Interface Design
  • Report Design
  • System Architecture
  • System Topology
  • Security Model
  • Standards and Tools
slide15

LIMS Selection Protocol

  • “Roadmap” Of the Selection and Evaluation Process
  • Description Of Each Phase
  • Define Roles and Responsibilities
  • Evaluation Criteria
  • Project Plan
slide16

Vendor Evaluation and Selection Process

  • Generate Request For Proposal (RFP)
  • Distribution To Pre-Qualified Vendors
  • Analysis of Vendor Responses
  • Shortlist Vendors
  • Vendor Demonstrations
  • Demonstration Evaluation
  • GAP Analysis
  • Identify GAP’s That Are Showstoppers
  • GAP Option Analysis
  • Cost Analysis and Purchase
slide17

Request For Proposal

  • Developed From System Specifications
  • Sent To Pre-Qualified Vendors
  • Provide Information on Company, Product and Services
  • Develop Vendor Shortlist
slide18

Request For Proposal

Components

  • Business Overview
  • Organizational Structure
  • Work Process Descriptions
  • Process Flow Diagrams
  • Requirements Matrix
  • Vendor Response Forms
slide19

Proposal Evaluation

  • Requirement Priority/Response Matrix Evaluation
  • Conformance To Current Workflow
  • Architecture/Topology Compatibility
  • Company Profile
    • Response To Solicitation
    • Industry Experience
    • References
    • Support Services
  • Cost Analysis
slide20

Product Demonstration

  • Demonstrate How System Conforms To Requirements and Workflows
  • Not A Sales Demonstration
  • Standardize Demonstration Using Demonstration Scripts
    • Outline Tasks To Be Performed
    • Standard Demonstration Data
slide21

Demonstration Evaluation

  • Conformance To Test Scripts
  • Scoring Criteria
    • Conforms
    • Workaround Available
    • Non-Conformance
slide22

GAP Analysis

  • Evaluate GAPS
  • Prioritize GAP
  • Options Analysis
    • Specifications
    • Cost Analysis
slide23

Vendor Recommendation

  • Results Of Product Demonstration
  • GAP Analysis Results
  • Cost Analysis
slide24

LIMS Purchase

  • Contract Negotiations
  • Payment Schedule
  • Source Code Escrow Agreement
  • Maintenance Agreement
  • Warrantee
slide25

Benefits Of A Systematic Approach

  • Capture All User Requirements
  • Assures that the LIMS is selected based on Requirements not features
  • Consistent evaluation criteria applied to all products
  • Reduces the risk associated with the purchase of a LIMS
slide26

For More Information, contact:

AstrixTechnology Group

1090 King Georges Post Rd

Suite 604

Edison, NJ 08837

732.661.0400

www.astrixsoftware.com