350 likes | 488 Views
This document outlines essential specifications and considerations for the effective planning, operation, and maintenance of educational facilities. Emphasizing risk management and preventative measures, it details the roles of construction management, site considerations, and financial planning involving projections for construction, operation, and maintenance costs. The focus is on creating safe, efficient, and economically sustainable environments for academic, athletic, and community activities while ensuring compliance with safety and educational standards.
E N D
FACILITY PLANS • OPERATIONAL • EMERGENCY • MAINTENANCE
EDUCATIONAL SPECIFICATIONS • DESCRIPTION OF FACILITIES, EQUIPMENT, FURNITURE, SPACE, AND OTHER CONSIDERATIONS NECESSARY FOR EDUCATIONAL PROGRAM AND SERVICES
RULE OF RISK MANAGEMENT • IT IS BETTER TO PLAN AND PREVENT ACCIDENTS THAN TO HAVE TO PAY FOR LIABILITIES.
CONSTRUCTION MANGEMENT • ARCHITECT • CLERK OF THE WORKS • CONSTRUCTION MANAGER
PREPARING ED SPECS • USERS OF THE FACILITIES • SPECIALISTS IN THE AREA • ARCHITECT AND ENGINEERS
SITE CONSIDERATIONS • HIGHWAY SYSTEM • SAFETY • SECURITY • ECONOMIC GROWTH • CURTURAL ADVANTAGES
OPERATIONAL MANUAL • CLEANING • ROUTINE MAINTENANCE • SAFETY CHECKS • SECURITY RESPONSIBILITY • HEALTH PROCEDURES • MECHANICAL EQUIPMENT • HEATING SYSTEMS MANUALS
EMERGENCY MANUAL • PROCEDURES • OFF CAMPUS SITE • LOCK DOWN PROCEDURES • REPORTING • COMMUNICATIONS • ASSISTANCE • CENTRAL OFFICE SUPPORT
MAINTENANCE MANUAL • OPERATING INSTRUCTIONS • EMERGENCY EQUIPMENT STANDARDS • ROUTINE PROCEDURES • HELP?????
MAJOR CONCERNS • ACADEMIC • ACTIVITIES • ATHLETICS • SUPPORT SERVICES • ADULT EDUCATION • COMMUNITY AND CIVIC USE • AVAILABILITY
PLANNING KEYS • PRIORITIES • TIME PERIODS • MAINTENANCE AND RENOVATIONS
FINANCIAL PLANNING • PROJECTION OF FUNDS TO BUILD • PROJECTION OF FUNDS TO OPERATE • PROJECTION OF FUNDS TO MAINTAIN • COST OF POSSIBLE RENOVATIONS • COST TO REPLACE CONSUMABLES • LONG RANGE NEEDS
PLANNING TEAM • SCHOOL PERSONNEL • TECHNICAL ASSISTANCE • SPECIALISTS IN EDUCATIONAL PLANNING
SITE SELECTION • ENVIRONMENTAL FACTORS • SAFETY • EMPLOYEE SAFETY • HIGHWAYS • UTILITIES • COMMUNICATION SERVICES • TAX MAPS
INDUSTRIAL AND COMMERCIAL DEVELOPMENT • SOCIALOGICAL INFORMATION • ECONOMIC STABILITY • EMPLOYMENT OPPORTUNITIES • TRADITIONS AND VALUES • RELIGIOUS MAKE-UP • CULTURAL POSSIBILITIES • RECREATIONAL OPPORTUNITIES
CONSTRUCTION DATA BANKS • SYSTEM MAPS • BUILDING MAPS • FLOOR PLANS • HISTORY OF CONSTRUCTION
PRINCIPLES OF LONG RANGE PLANNING • LIST ASSUMPTIONS • MOST EFFECTIVE USE OF SERVICEABLE FACILITIES • DO NOT FREEZE FUTURE BOARDS • AVOID “TACK-ONS” • SPECIFY MOST SUITABLE GRADE ORIENTATION • EDUCATIONALLY EFFECTIVE
ECONOMICALLY SOUND • BE FLEXIBLE AND LIST ALTERNATIVES • BE AWARE OF MAX AND MIN ENROLLMENTS • SITE SIZE • RELATE TO FINANCIAL ABILITY • SAFETY, WELFARE, CONVENIENCE • STRATEGIC LOCATIONS
TASKS IN BUILDING • I. LONG RANGE • 1. ENROLLMENT PROJECTIONS • 2. BUILDING SURVEY • 3. LONG RANGE PLAN • 4. BOARD ACTION • 5. ENLIST CITIZEN PARTICIPATION
II. PUBLIC SUPPORT • 1. ASSESS ATTITUDE • 2. DEVELOP STRATEGY FOR SUPPORT
III. PLANNING • 1. OBTAIN PLANNING FUNDS • 2. SECURING PROFESSIONAL SERVICES • 3. SELECTING THE SITE • 4. COMPREHENSIVE SET OF ED SPECS • 5. PRELIMANARY DRAWINGS • 6. PROGRESS PRINTS • 7. FINAL WORKING DRAWINGS • 8. PROCDURES FOLLOWING DRAWINGS
SPACES • SPECILIAZED • NON-SPEICALIZED • SUPPLEMENTAL
ENERGY NEEDS • HEALTH AND COMFORT • TEACHING PROCESS • VENTILATION • EQUIPMENT NEEDS • INCREASES DOWN THE ROAD • SEASONABLE CONTROL • EFFECTIVE AND EFFICIENT
ENERGY CONSIDERATIONS • SHAPE • LOCATION • INSULATION INCLUDING FOUNDATIONS • DOORS AND WINDOWS • REDUCE WINDOW AREA • OPENINGS KEPT TIGHT • EFFICIENT EQUIPMENT • CREATE ZONES • TAKE ADVANTAGE OF EXHAUST AIR • CONTROL HUMIDITY
WORKING DRAWINGS PROTOCOL • PAGE 1: COVER SHEET • PAGE 2: ACCURATE SITE PLAN WITH TOPOGRAPHICS AND UTILITIES • PAGE 3: OVERALL PLOT OF BUILDING • PAGE 4 : DETAIL OF PLOT • PAGE 5: FLOOR PLAN • PAGE 6: DETAIL DRAWINGS • PAGE 7: MECHANICALS
BIDDING PROCESS • ADVERTISE • ESTABLISH BID BONDS • CHANGE ORDERS CLARIFIED • LIQUIDATED DAMAGES • FOLLOW THE BID FORM
CONSTRUCTION AREAS • MANAGERIAL • SUPERVISORIAL • COORDINATED PRCEDURES
PERIODIC CONSTRUCTION MEETINGS • SUPERINTENDENT OF JOB • CONSTRUCTION MANAGER • ALL CONTRACTORS • SITE ADMINISTRATOR IF RENOVATION
BUSINESS ADMINISTRATION FUNCTION IN SCHOOLS • BUDGETTING AND FINANCIAL PLANNING • PURCHASING AND SUPPLY MANAGEMENT • PLANT PLANNING AND CONSTRUCTION • SCHOOL-COMMUNITY RELATIONS • PERSONNEL MANAGEMENT • IN-SERVICE TRAINING • OPERATION AND MAINTENANCE OF PLANT
TRANSPORTATION • FOOD SERVICE • ACCOUNTING AND REPORTING • DATA PROCESSING • GRANTSMANSHIP • OFFICE MANAGEMENT • EDUCATIONAL RESOURCES MANAGEMENT
RESTUCTURING FINANCE • PRODUCTIVITY OF LEARNING INDUSTRY • COSTS AND EFFECTIVENESS • TECHNOLOGY • INNOVATION • DEREGULATION AND DECENTRALIZATION • CHOICE AND COMPETITION • EVALUATION
IMPLICATIONS OF RESTRUCTURING FINANCE • BENEFIT/COST ANALYSIS • ACCOUNTABILITY SYSTEMS • COOPERATIVE RELATIONSHIPS • COST-EFFECTIVENESS RATIONALE • IMPLEMENT ALTERNATIVE EDUCATIONAL GOALS • ADVISE POLICY MAKERS • SYSEM OF FISCAL ACCOUNTABILITY
COMPREHENSIVE PLANNING • TOTAL SYSTEM NEEDS • DIVERSITY OF SKILLS • RESOURCES NEEDED FOR PLANNING
LEGAL CONTEXT OF SCHOOL BUSINESS ADMINISTRATION • WRITTEN CONSTITUTIONS • STATUTES • JUDGE-MADE LAWS • ADMINISTRATIVE LAW • FEDERAL RESPONSIBILITY • STATE RESPONSIBILITY • LOCAL DISTRICT RESPONSIBILITY
LEGAL CONCEPTS • MINUTES OF THE BOARD • CONTRACTUAL AUTHORITY • CONTRACTS • SCHOOL MONIES • CONTROL SYSTEMS • TORT AND TORT LIABILITY • CONFLICT OF INTEREST • DISCRIMINATION • DUE PROCESS • COMPLIANCE AND MONITORING OF COMPLIANCE