LUCX facility introduction: present status and future plans. A. Aryshev On behalf of QB group and THz collaboration. Mini-workshop for advanced THz and Compton X-ray generation. 18 – 19 March 2013. Outline. THz project overview LUCX activity LUCX Projects Overview

idania
Download Presentation

LUCX facility introduction: present status and future plans

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LUCX facility introduction: present status and future plans A. Aryshev On behalf of QB group and THz collaboration Mini-workshop for advanced THz and Compton X-ray generation 18 – 19 March 2013

  2. Outline • THz project overview • LUCX activity • LUCX Projects Overview • THz program • LUCX Laser system • LUCX 2012 upgrade • LUCX operation modes • e-beam optics • THz program vacuum system, manipulator • Measurement setup and DAQ • Schedule & Conclusion • Resources Mini-workshop for advanced THz and Compton X-ray generation

  3. LUCX: international collaboration • Initially the machine was built as a RF Gun test bench in 2005 • In 2006 (RF Gun + Accelerating structure) it was extended to produce ~40MeV e-beam and Compton experiment started • 2009 a new 1.6 cell RF-Gun was made, installed and commissioned. • 2011 RF-Gun replacement -> 3.6 cell • From 2009 CDR experiment started • From 2012 THz program was started • KEK, Waseda University, Osaka University, Tomsk Polytechnic University, Royal Holloway University of London. • Kharkov Institute of Physics and Technology, Oxford, Moscow Engineering Physics Institute. Mini-workshop for advanced THz and Compton X-ray generation

  4. Documentation • & publicity • ZEMAX and CST simulations Accelerator operation Mini-workshop for advanced THz and Compton X-ray generation

  5. THz imaging Project candidates Mini-workshop for advanced THz and Compton X-ray generation

  6. - ≥ 50% completion !!! – vast importance !!! !!! !!! Mini-workshop for advanced THz and Compton X-ray generation

  7. LUCX activities key points • Accelerator • Generation of a stable ps and fselectron beam • Reliable beam diagnostics • Ability to measure longitudinal beam profile • Beam dynamics simulation (with intension to make it on-line) • Control upgrade (Soft&Space) • Laser system • Will be shown in a next talk by Dr. K. Lekomtsev • THz Measurement system • Will be shown in a next talk by Dr. M. Shevelev • Compton experiment • Covered by prof. J. Urakawa on March 18th • CDR experiment • Covered by Dr. A. Aryshevon March 18th Mini-workshop for advanced THz and Compton X-ray generation

  8. LUCX Facility LUCX accelerator tunnel Nd:YAG KLY#0 KLY#1 FSTB LUCX control room Modulator #1 Modulator #0 Mini-workshop for advanced THz and Compton X-ray generation

  9. LUCX “2012 Upgrade”:THz, 12-cell booster Mini-workshop for advanced THz and Compton X-ray generation

  10. LUCX “2012 upgrade” CDR Compton THz GV THz chamber Mini-workshop for advanced THz and Compton X-ray generation

  11. LUCX “2012 upgrade”, e-optics “Compton optics” THz Compton CDR Mini-workshop for advanced THz and Compton X-ray generation

  12. LUCX beam diagnostics • BPMs • Well established Button BPM system • Profile monitors (Screens: OTR, “DMQ”) • Require upgrade (CCDs, analysis) -> better emittance measurements • Beam Charge monitor • Well established, FC and ICTs • Beam energy, energy spread • Well established, but after 12-cell booster • Beam loss monitor • So-called “plick” or a simple gamma detector – has to be installed • Longitudinal profiling • Has to be developed. Candidates: Streak camera, Deflecting cavity. Mini-workshop for advanced THz and Compton X-ray generation

  13. LUCX Control upgrade • Control room re-arrangement to accommodate large collaboration groups • Control PCs and display system upgrade • Control soft at present will be the same with the slow upgrades in the future • FemtoSecondTestBench control and monitors will be installed and included into the main LUCX control soft • Well defined and documented API Mini-workshop for advanced THz and Compton X-ray generation

  14. Resources • THz program web:http://www-atf.kek.jp/thz/index.html • LUCX wiki (documentation, e-log, etc.):http://atf.kek.jp/twiki/bin/view/LUCX/WebHome • QB program web:http://kocbeam.kek.jp/ Mini-workshop for advanced THz and Compton X-ray generation