1 / 22

New Fairfield Free Library Renovation Project 2012

The New Fairfield Free Public Library Renovation Project 2012 focuses on upgrading facilities to meet ADA compliance, including elevator installation, wider staircases, electronic doors, and improved lighting. Proposed alterations aim to enhance access, renovate bathrooms, program rooms, and community spaces. The estimated cost for Phase 1 is $565,000 and Phase 2 is $390,000, with funding sources including library funds, town capital fund, grants, and donations.

mirra
Download Presentation

New Fairfield Free Library Renovation Project 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project2012 1

  2. Renovations • Elevator • Doors • Bathrooms • Lighting • Air Conditioner • Program Room • Community Room

  3. Proposed Alterations Main Level

  4. Proposed AlterationsLower Level

  5. Improve AccessTo Meet ADA Compliance Easy Open Electronic Doors Elevator For Access To Both Floors Wider Staircases Updated Bathrooms 5

  6. Difficult Door AccessInterior & Exterior 6

  7. c Current Narrow Staircase • Width-33” (Fire code- min 36”) • Railing HT-33” (ADA 34-38”) • Railings required on both sides of staircase 7

  8. Current Bathroom

  9. Air Conditioning • Bring system up to code • Replace system for energy efficiency

  10. Air Conditioner/ Chiller 36 Years Old 10

  11. Inadequate Lighting Conditions 11

  12. Renovate Program Room • Provide storage for chairs & tables • Remove or enclose furnace unit • Install cabinets to house program resources & supplies • Install sink for easier access & clean-up • Replace secondary door with window • Add additional outlets for equipment

  13. Current Storage for Supplies

  14. Storage Shelves

  15. Program Room

  16. Furnace in Program Room

  17. Replace Slider in Children’s Room with Windows

  18. Upgrade Electrical & Computer Wiring

  19. Install Energy Efficient Windows in Community Room

  20. Other Renovations • Add suspended ceiling to office & workroom on main level • Improve insulation levels in workroom & Community Room

  21. Estimated Costs Phase 1 $565,000 Phase 2 $390,00

  22. Suggested Funding • Library Funds $390,000 • Funds from town capital fund • Possible grants • Donations