1 / 7

WEL – COME S. J. Iron & Steels Pvt. Ltd .

WEL – COME S. J. Iron & Steels Pvt. Ltd . Area – 3 Acres Manpower of company – 325 nos. Turnover - 40 Cr. (Target 55 Cr. For 2011-2012). Name of Quality Circle – PRAKASH QUALITY CIRCLE Name of the members

milica
Download Presentation

WEL – COME S. J. Iron & Steels Pvt. Ltd .

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WEL – COMES. J. Iron & Steels Pvt. Ltd. Area – 3 Acres Manpower of company – 325 nos. Turnover - 40 Cr. (Target 55 Cr. For 2011-2012)

  2. Name of Quality Circle – PRAKASH QUALITY CIRCLE • Name of the members 1)Mr. P.B. MALI– Co-ordinator 2) Mr.V.D.RAVAN- Facilitator

  3. DATA COLLECTION FOR FOUNDRY DEPARTMENTS • MEETING NO -2 DATE-31/10/2011 1 AIR LEAKAGES REMOVING . 2 SAND LEAKAGES REMOVING . 3 OIL LEAKAGES REMOVING 4 SAND COLLER WORK MAKING OK CANDITION. 5 SAND MIXAR (KELSON MAKE) WORK . 6 PREPAID SAND CONVEYER( NO 3) BELT CHUTE MODIFICTIONG. 7 ARRITER FITING ON PREPAID SAND CONVEYER( NO 2) BELT. 8 FRESH SAND BELT NEW CHUTE MAKING AND SAND SPILELAGE STOPING WORK. 9 COMPAX MACHIN ‘D’CLAMP SPEED PROPER WORK. 10 AUTO LINE CAR MOTOR SAFTY COVER FEETING. 11 HOT ROOM BURNER WORK.

  4. DATA COLLECTION FOR FOUNDRY DEPARTMENTS • MEETING NO - 3 DATE-14/11/2011 1COMPAX MACHIN AMINE PUMP WORK. 2 CUPOLA SKIP CHARGER B/D MINIMIZING. 3 CUPOLA WIRE ROPE PROBLEM REMOVING. 4 MM 1 & 2 TRANSFER TROLLEY NEW MAKEING. 5 LADDLE PREHEATER PROBLEM REMOVING. 6 MAKING NEW WALL NEAR THE PUMP HOUSE IN THE STOP DUST PARTICALS. 7 CUPOLA COOLING RETURNE WATER CHEMBER PROBLEM REMOVING. 8 MAKING NEW DUST COLLECTING DUCTING PIPEING (SAND COOLER). 9 SANDPLANT MOTOR AND GEAR BOX REPARING. 10 PUMP HOUSE PUMP GLAND CHEKING . 11 F/C HIGH TEMPRECHER PROBLEM REMOVING.

  5. DATA COLLECTION FOR FOUNDRY DEPARTMENTS • MEETING NO-3 DATE-14/11/2011 • FROM SUGGESTIONS OF MEETING NO 2&3 SELECTED BY • AIR LEAKAGES REMOVING PROJECT

  6. DATA COLLECTION FOR AIR LEAKAGES • MEE TING NO .-4 DATE - 21.11.2011 • AIR LEAKAGES POINT DATA COLLECT • GRAND MASTER M/C AIR LEAKAGES :- • 1.SM