An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. New link between BIS and LBDS CIBDS recap and Experience from LBDS reliability run Stéphane GabourinTE/MPE-EP MPP – 31stOctober 2014

  2. Outline • CIBDS recap • Why and How • From v1 to v2/3 • Experience from LBDS reliability run • Installation in UA63 & UA67 • Commissioning steps • CIBDS issues during the reliability runs

  3. CIBDS recap

  4. Why and How 1/3 • CIBM • CIBM A A • CIBG A B B B Courtesy E. Carlier • Fully redundant Synchronous Beam Dump Triggers (SBDT)

  5. Why and How 2/3 • CIBM • CIBM A A 12V • CIBG A B B B 12V Trigger Delay (TD): 200us Courtesy E. Carlier • Fully redundant Synchronous Beam Dump Triggers (SBDT) • Asynchronous Beam Dump Triggers (ABDT) • Issue of common 12V

  6. Why and How 3/3 • CIBDS • CIBM • CIBM A A A • CIBG A • CIBU B B B B 200us RTB 250us Courtesy E. Carlier • Add a link directly from the BIS to the retrigger lines • Connect the CIBDS as User on a CIBM to avoid spurious asynchronous beam dumps Frequency loss (A:9.375MHz / B:8.375MHz) Pulse

  7. From v1 to v2/3 v1 v2 • Updates v1 → v2: • Change the lemo connector to the CIBU • To simplify soldering • Bad for CIBU commissioning… • LED inversion, … • Updates v2 → v3: • Change polarity for the “PLC local mode” read back • Add resistors to • Protect output to the CIBU • Protect output to the TD Box • Get exactly 12V pulse for the TD Box • v3 NOT in operation as not working properly !

  8. Experience from LBDS reliability run

  9. Installation in UA63 & UA67 • Full rack for: • The BIS FEC • CIBG B1 • CIBM B1 • CIBM B2 • CIBDS B1 • The CIBU of the CIBDS • The 2 Trigger Delay boxes (+ 1 spare) • Better to have a “how to plug” patch • For optic fibers • For electrical cables

  10. Installation in UA63 & UA67

  11. Commissioning steps (Updated) commissioning steps were followed

  12. Commissioning steps (Updated) commissioning steps were followed Status view: No GUI available (for 2015) → use of Nodal

  13. Commissioning steps TSU 1-A (Updated) commissioning steps were followed Status view: No GUI available (for 2015) → use of Nodal TSU 1-B TSU 2-A • Arming sequence: • After some time, done by the sequencer, but before… • → use of Nodal TSU 2-A Arm • Quite challenging to arm and maintain both beams: • 4 TSU + 2 CIBDS + 2CIBG to arm and start manually… • All within 5 sec… • → Keep B1 and B2 independent Start

  14. Commissioning steps

  15. CIBDS issues during the reliability runs • CIBDS failures observed: • none…

  16. Questions

  17. Spare slide: local mode read back V1 V2 V3