1 / 0

Southeast Florida Freight and Goods Movement Planning Overview MetroPlan Orlando July 23, 2012

Southeast Florida Freight and Goods Movement Planning Overview MetroPlan Orlando July 23, 2012. Southeast Florida Regional Freight Taskforce established in 2002. SE Florida Regional Freight Stakeholders Taskforce. SE Florida Regional Freight Stakeholders Taskforce.

meris
Download Presentation

Southeast Florida Freight and Goods Movement Planning Overview MetroPlan Orlando July 23, 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Southeast Florida Freight and Goods Movement Planning Overview MetroPlan Orlando July 23, 2012
  2. Southeast Florida Regional Freight Taskforceestablished in 2002
  3. SE Florida Regional Freight Stakeholders Taskforce
  4. SE Florida Regional Freight Stakeholders Taskforce Source: Federal Highway Administration
  5. Accomplishments:Truck Freight GIS Mapping Tool
  6. Railroad Crossing Median Peak Dir. Delay per Gate Closing (veh-mins)
  7. 2035 South Florida Regional Freight Plan

    A Collaboration Between: June 11, 2010
  8. Study Purpose The purpose of the South Florida Regional Freight Plan (SFRFP) is to develop a formalized regional freight planning and implementation strategy that is inclusive of individual planning efforts that have been conducted within the area and prioritize critical freight transportation projects for the South Florida region.
  9. High Ranking Highway Needs Projects
  10. High Ranking Seaport Needs Projects
  11. High Ranking Rail/ Intermodal Needs Projects
  12. High Ranking Airport Needs Projects
  13. 2040 SE Florida Regional Freight Plan Open ended scope of services Freight network is not necessarily tied the UZA Boundaries Develop set of project Needs and hand over to the overall Regional Transportation Plan Expected to be underway this Summer
  14. FDOT Planning Projects related to South Florida Intermodal Logistics Center Technical assistance for the Port of Palm Beach 2006 Inland Port Feasibility Study –FDOT Central Office PTO Planning Funds http://www.dot.state.fl.us/seaport/pdfs/SFL_Inland_Port_Final_Report_11_07.pdf Key Findings: There is significant support for development that would accompany an inland port facility; that is, distribution centers, warehouses, trucking facilities and amenities, and other light industrial uses. The state should work with local and regional partners to further investigate the viability of a regional mixed use freight hub. A detailed market analysis is needed.
  15. FDOT Planning Projects related to South Florida Intermodal Logistics Center (continued) 2007 South Florida Intermodal Logistics Center Market Analysis - Legislative Appropriations Bill http://www.dot.state.fl.us/seaport/pdfs/POPB_ILC%20Marketreport_FINAL.pdf Key Findings: There exists a demand for 40 million to 110 million square feet of additional distribution center space in the Palm Beach/Southern Florida effective hinterland. The key factors that will drive the development of the DC space are: Land prices; Rental rates; Inland trucking costs; Rail and highway access; Availability of labor; and Availability of transportation equipment.
  16. FDOT Planning Projects related to South Florida Intermodal Logistics Center (continued) 2008 US 27 Rail Preliminary Assessment Study - Legislative Appropriations Bill http://www.dot.state.fl.us/seaport/pdfs/US_27_Progress_Report_August_13_2009.pdf The Draft Preliminary Assessment Report concluded that 10 alternative alignments are do not have fatal flaws, based on a macroscopic qualitative assessment. Further development must include analysis of, but not be limited to, physical alignments, typical engineering cross sections, quantification of demand, funding sources, types of cargo handled, environmental impacts, and existing rail system enhancement requirements. Operations ? Cost?
  17. Map of Southern Alternatives
  18. Map of Northern Alternatives – US 27 Freight Rail
  19. Port Everglades ICTF 42 acres of ILC Hialeah Logistics Hub 300 acres of Logistics Hub Palm Beach County ILC 255 acres of Intermodal Rail Yard 8.82 million square feet of warehouse space St. Lucie County ILC 611 acres of Intermodal Rail Yard 40 million square feet of intermodal campus, distribution center and mining. Glades County ILC Similar footprint as St. Lucie County ILC Proposed Intermodal Logistic Centers (ILCs) St. Lucie County ILC Glades County ILC PPB Palm Beach County ILC PEV Hialeah Logistic Hub POM
  20. FDOT Planning Projects related to South Florida Intermodal Logistics Center (continued) 2009 Legislative Appropriation $1 Million Inter-Regional Transportation Infrastructure Needs Study ILC Development broad impacts to transportation infrastructure Multi-dimensional – Truck and Rail Impacts With ILC, without ILC With US 27 Rail, without US 27 Rail No first Port of Call Asian Trade/Business as Usual First Port of Call/Regional Trade First Port of Call/New Discretionary Trade
  21. Initial Assignment Results Unrealictic (full built-out & low rail) 2035 Truck 2035 AADT Truck around 30,000 AADT over 100,000
  22. ITINS Gaming Tool
  23. Traffic Assignment Results (Comparing Scenario 4 & 1) 2035 Low Rail PM (Scenario 4) 2035 Low Rail PM (Scenario 1)
  24. Statewide Planning Efforts SIS Major Update completed January 2010 Added Rail Freight Terminals Allowed for Hub to Hub connectors for drayage New criteria for Emerging Seaports Statewide Rail Plan Statewide Seaport Plan New FDOT Office of Freight and Logistics and Passenger Operations Statewide Freight Plan due June 2013
  25. A New Manifest Destiny

    Florida’s International Trade Opportunities Future of Florida Forum 2010 October 12, 2010 John KaliskiCambridge Systematics, Inc.
  26. Containerized Imports – Today Direct To Florida Ports of Entry Direct to Florida through Ports Intermodal Distribution to Florida Conceptual Illustration Only
More Related