60 likes | 144 Views
This study examines the current situation and future considerations post-relocation at Point 1, analyzing racks, converters, control systems, and collimation setups.
E N D
R2E relocation study in Point 1 TODAY UJ16 UL16 Courtesy A. Tursun, Y. Muttoni
R2E relocation study in Point 1 After relocation area to be reconsidered UJ16 UL16 Courtesy A. Tursun, Y. Muttoni
Current situation in UJ14/16 PC cryo collimation QPS current leads heaters PC control PIC BPM
Racks to be removed from UJ14/16 to be relocated: 15 racks & 2 Power Converters RYSA 03not used anymore , CYCIP 01 merged with DYPG, PC cryogenics (profibus-> moves FIP -> stays) collimation QPS current leads heaters PC spare PIC BPM
Situation in UJ14/16 after relocation PC 4 racks stay Cryo(FIP) QYCO1 QPS RYSA 01 PC spare RYSA 02 PIC BPM
Situation in UL14/16 after relocation RYLC 01 RYLB 01 RYMCB 01-04 RYSC 01 QYC 02 QYC 01 (additional rack) RYCA 01 RYCA 02 DYXA 01 additional rack 2 Power Converters area to be reconsidered DYPG 01 CYCIP 01 DYPG 02 TYCFL 01 Fire detectors “LHC Performance Workshop”, 25 January 2011, A. L. Perrot