1 / 1

System Ops 2005 Release Plans

System Ops 2005 Release Plans. Energy and Market Management Texas Market Link Settlements and Billing Market Oversight Monitoring Enterprise Information Systems. Systems. System and Market Operations PUCT Market Oversight Division Qualified Scheduling Entities

meghan
Download Presentation

System Ops 2005 Release Plans

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. System Ops 2005 Release Plans Energy and Market Management Texas Market Link Settlements and Billing Market Oversight Monitoring Enterprise Information Systems Systems System and Market Operations PUCT Market Oversight Division Qualified Scheduling Entities Transmission Service Providers Stakeholders Q4 ‘04 Q1 ‘05 Q2 ‘05 Q3 ‘05 Q4 ‘05 Q1 ‘06 Release SO 3 Release SO 5 Release SO 4B Release SO 4A • Release 3 (2004 Carry) • PR-30144 EMP 2.2 Upgrade (1.0) • PR-30074 Enhance STNET Multiple Selected Time Ranges (1.1) • PR-30170 Implement Selected Contingency in PF (1.1) • PR-30096 ESCA to PTI Download (1.1) • PR-20159 Load Rollover during line outage (1.1) • PR-40099 CTGS Import/Export Dump Utility (1.0) Release 4A (2004 Carry) 30085 Special Protection Schemes (1.2) 40096 Improvements to VSA/DSA (2.2) 40092 Improve Power System Model Maintenance via Database Archive Comparison (1.1) 40049 Improve Data Elements for Local Constraints & OOMs (1.1) 30131 PRR359 Improved Resource Plan (1.2) 40050 Unit Specific Bid Limits based on Generic Costs (1.1) 30140 AS Simultaneous Selection (1.1) 40051 OOM Participation in Providing Ancillary Services (1.1) 30161 PRR413 - Optimization for the Whole Operating Day in RPRS Procurement Process (1.1) 40062 PUCT Upgrade SPD (1.1) 30163 PRR422 - OOM Zonal Dispatch Instructions (2.2) 40072 PUCT Add Corrected MCPEs to the MOS dbase and pass to MMS (1.1) 40048 EMMS Parameters Capture for MMS Reclear Fidelity (1.1) 30183-99 (1.1) Release 5 (Non-AREVA) 30018 RT Market Ramp Rate Feasibility Study (1.1) (O&M) 30084 CSC Thermal Volt Limits (1.1) 40113 RAPC Modeling (1.0) 40090 Operator Training Simulator (1.1) 30105 Congestion Mgmt Reports (1.1) 30028 Overload Reports (1.1) 30029 Over limit Reports(1.1) 50044 Near Miss Indicator (1.1) 50008 Aggregation of Combined Cycles (1.1) 50016 AVR Validation (1.1) 50021 Improve Reliability of Freq Input (1.1) 50002 MOMS Enhancements (1.1) 50003 MOMS Enhancements to AREVA SPD (1.1) 50040 EMMS SPR Enhancements (1.2) (O&M) 50134 DC Tie Automation and Scheduling (1.1) 50135 Topology Estimation System Phase 1 (1.1) 50136 EMMS Software Upgrade - OSI PI and OAG (1.1) 50050 Satellite Communications for Black Start suppliers (1.1) 30021 Replace DSM6 and VGR Freq Recorders (1.1) 50142 Network Model Management System (NMMS) (1.1) 50130 SCE Performance and Monitoring (1.1) 50139 Critical SIRs from Implementation of SMP/EMP 2.2 (1.1) Release 4B (2004 Carry) 30016 Dynamic Ratings (1.3) 30129 Remote Access to Study Cases (1.0) 40084 Outage Scheduler Phase II (1.0) 40086 Incident Report (1.0) 40100 Daily Operations Report (1.0) 40100 RTCA Archiving (1.0) 40098 Performance Monitoring for SCADA/SE (1.0) Active (at least in Initiation) Completed Accelerated to Support Capability

More Related