1 / 2

Tentative Agenda for 5 th TB and SGC Joint meeting on Dec. 21 (from 13:45 to 17:45)

Tentative Agenda for 5 th TB and SGC Joint meeting on Dec. 21 (from 13:45 to 17:45). 13:45 to 16:30 Open Session 13:45-13:50 Opening Address by J.Urakawa 13:50-17:45

megan-kirk
Download Presentation

Tentative Agenda for 5 th TB and SGC Joint meeting on Dec. 21 (from 13:45 to 17:45)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tentative Agenda for 5th TB and SGC Joint meeting on Dec. 21 (from 13:45 to 17:45) 13:45 to 16:30 Open Session 13:45-13:50 Opening Address by J.Urakawa 13:50-17:45 Review of Hardware and Instrumentation R&D’s at ATF from 2007. June to Dec. (mainly, Fast Kicker R&D, Nano-BPM, FONT, Laser wire at EXT, X-SR Monitor, Fast Ion Study) 13:50-14:15 Proposal of Beam extraction by using strip-line kicker with pulse bump orbit by T. Naito, 14:15-14:45 Laser wire R&D progress, FONT, X-SR, IPBPM, Fast Ion Study by N. Terunuma, 14:45-15:15 Status of ATF2 project by T.Tauchi 15:15-15:55 Presentations for New Proposals (If necessary.) 15:55-16:10 15 min. Break Closed Session 16:10-16:40 TB and SGC Joint Discussion (ATF2 Construction Schedule and Beam Commissioning) 16:40-17:25 Preparation of Summary (45 min.) Open Session 17:25-17:45 Concluding Remarks by A. Wolski 19:00-21:00 ATF Year-End Party (Bounennkai, Unforgetable Party) At KEK No.3 Building, 1st Floor, Meeting Room

  2. Good things in this year! • Number of ATF collaborators increased to more than 200. • (This thing requests a good scheduling and coordination.) • 2. Near establishment of laser-wire system in this week. Next step, training to the laser-wire operation for ATF2 beam tuning.

More Related