CAD Drawing Status … and Production Plan

CAD Drawing Status … and Production Plan. W.Bailey and Y. Yang (SOTON) Funded by CER/STFC HL-LHC-UK(1) Supported by Y. Leclercq , R.Betemps , J.Fleiter , I.Falorio S.Claudet , V.Parma , A.Ballarino , (CERN) HL-LHC - WP6a. 20 June. 2019. CAD Status.

mcabee
Download Presentation

CAD Drawing Status … and Production Plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CAD Drawing Status… and Production Plan W.Bailey and Y. Yang (SOTON) Funded by CER/STFC HL-LHC-UK(1) Supported by Y. Leclercq, R.Betemps, J.Fleiter, I.FalorioS.Claudet, V.Parma, A.Ballarino, (CERN) HL-LHC - WP6a 20 June. 2019 DFX Internal DDR 20 June 2019

  2. CAD Status • Finalising the 3D model in 1wk pending/after DDR approval • Generation of 2D specification drawings to start the procurement process • Software 3D to 2D conversion including CERN’s specific markings, trials made with the help of CERN design office. Aim for 90%+ features automatically • Drawings will be reviewed/checked together with CERN • Procurement and manufacturing design based on the 2D drawings: components/parts in batches, instead of a single package, organised according to the priorities and interrelations of the components • Exploratory procurement discussions/visits have already taken place DFX Internal DDR 20 June 2019

  3. Example of 2D Drawing Generated at CERN using SOTON 3D model DFX Internal DDR 20 June 2019

  4. Procurement and Production Plan DFX Internal DDR 20 June 2019