1 / 15

After Permitting –or- just when you thought you were out of the woods

After Permitting –or- just when you thought you were out of the woods . There is NO After! Between Permitting Compliance Schedules Permit Amendments Permit Extensions Site Applications PQL’s Monitoring Water Regulations. After Permitting. Permit Compliance Read the WHOLE thing

may
Download Presentation

After Permitting –or- just when you thought you were out of the woods

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. After Permitting –or- just when you thought you were out of the woods • There is NO After! • Between Permitting • Compliance Schedules • Permit Amendments • Permit Extensions • Site Applications • PQL’s • Monitoring • Water • Regulations

  2. After Permitting • Permit Compliance • Read the WHOLE thing • Understand ? • Timing, methods, reports • Schedule • Sampling/analysis • Reporting

  3. Compliance Schedules • Allows time for compliance • Monitoring/testing • Studies • Design • Construction • Optimization • Enforceable permit condition !

  4. Permit Amendments • Major • Requires public notice and comment period • Substantial change to effluent • Minor • Reasons For- • Study results • WER • Reasonable potential • PQL • Standards change

  5. Permit Extensions • Continue existing requirements • Completion of studies • Anticipated standards changed • Watershed permitting • Consolidation of facilities

  6. Site Applications • Amendment required: • New process that does NOT increase capacity • Physical changes • Disinfect ion • Gas to Liquid, Liquid to Gas, Cl2 to UV, etc. • Significant changes to- • Secondary treatment • Primary treatment • Digestion • Increase/ decrease in Rated capacity (no construction) • Add reuse facility

  7. PQL • Practical Quantification Level • Permit Limits at or near MDL or LRC • Determined in “clean water” • Wastewater may interfere • Site Specific PQL • Use actual effluent • 7 spiked samples • 3 laboratories • PQL used to measure compliance

  8. Monitoring • Your receiving waters • Upstream • Downstream • Flow • The Regulations • Frequent changes • Your Permit • Read and understand !

More Related